Alexco Provides Full 2020 Exploration Results
and Operations/Corporate Update
VANCOUVER, BC, Jan. 19, 2021 /PRNewswire/ - Alexco
Resource Corp. (NYSE American: AXU) (TSX:
AXU) ("Alexco" or the "Company) today reported results
from its 2020 surface exploration drilling program that focused on
the Bermingham Northeast Deep zone located at depth approximately
150 meters ("m") below the existing mineral resource, that is
currently in development for ore production beginning in the second
quarter of 2021. The Company also provided a brief update on Keno
Hill Operations and Corporate activity.
2020 Exploration Results Highlights
The 2020 surface exploration program completed 7,653 m of core drilling in 14 holes as detailed
in Table 1. The program focused on a 550
m long structurally controlled sub-horizontal elongated zone
in the same structural and stratigraphic setting that contains the
high-grade mineralization initially discovered in 2018 below the
Bermingham mineral resource (see news release dated September 10, 2019, entitled "Alexco Intercepts
8.1 Meters (true width) at Composite Grade at 1,414 Grams Per Tonne
(45.5oz/t) Silver at "Bermingham Deep" Target"). The 2020
exploration program was designed to drill on approximately
100 m sections to trace the deeper
zone southwest and northeast along strike within the favourable
mineralization corridor.
Significant results are reported below:
(note that intercepts below are on sections located
approximately 100 m apart and are
listed from southwest to northeast along the zone (see Figure
2)).
- K-20-0769 intersected mineralization in both the
Bermingham Footwall and Main veins:
-
- The Footwall vein extends over a true width of 8.76 m from 507.24
m containing 3,583 grams / tonne ("g/t") (115.2 ounces /
tonne ("oz/t")) silver ("Ag"), including 4.54 m true width from 507.70 m at 5,497 g/t (176.73 oz/t) Ag and
1.64 m true width from 516.60 m at 3,834 g/t (123.28 oz/t) Ag. These
include several very high-grade intervals including 0.41 m true width from 509.81 m at 15,174 g/t (487.84 oz/t) Ag,
0.28 m true width from 512.42 m at 21,994 g/t (707.12 oz/t) Ag, and
0.24 m true width from 517.45 m at 23,906 g/t (768.60 oz/t) Ag.
- The Main vein extends over a true width of 3.50 m from 473.86
m containing 707 g/t (22.72 oz/t) Ag, including 0.93 m true width from 476.72 m at 2,337 g/t (75.14 oz/t) Ag.
- K-20-0773 intersected the Footwall vein over a true
width of 5.30 m from 496.24 m containing 2,070 g/t (66.55 oz/t) Ag,
including 2.35 m true width from
499.31 m at 4,425 g/t (142.27 oz/t)
Ag.
- K-19-0740* (previously reported on September 10, 2019) intersected several
mineralized veins in this zone including:
-
- 8.15 m true width from
580.09 m containing 1,414 g/t (45.46
oz/t) Ag, including 0.59 m true width
from 590.82 m at 10,105 g/t (324.88
oz/t) Ag.
- K-20-0761 intersected mineralization in both the
Bermingham Footwall and Main veins:
-
- The Footwall vein extends over a true width of 6.12 m from 536.84
m containing 1,560 g/t (50.16 oz/t) Ag, including
2.72 m true width from 539.71 m at 3,381 g/t (108.71 oz/t) Ag.
- The Main vein extends over a true width of 1.30 m from 486.65
m containing 4,889 g/t (157.19 oz/t) Ag, including
0.71 m true width from 486.65 m at 8,810 g/t (283.25 oz/t) Ag, including
0.45 m true width from 486.92 m at 11,286 g/t (362.85 oz/t) Ag.
- K-20-0770 intersected mineralization in the Bermingham
Footwall vein:
-
- The Footwall vein extends over a true width of 7.46 m from 559.06
m containing 1,381 g/t (44.40 oz/t) Ag, including
0.39 m true width from 563.67 m at 4,180 g/t (134.39 oz/t) Ag, and
0.24 m true width from 566.34 m at 9,800 g/t (315.08 oz/t) Ag.
- A Footwall splay extends over a true width of 2.28 m from 552.49
m containing 693 g/t (22.27 oz/t) Ag, including 0.42 m true width from 554.28 m at 1,987 g/t (63.88 oz/t) Ag.
- K-20-0762 intersected the Footwall vein over a true
width of 1.87 m from 643.75 m containing 893 g/t (28.71 oz/t) Ag,
including 0.79 m true width from
643.75 m at 2,058 g/t (66.16 oz/t)
Ag.
* Results from the 2020 drilling program and the previously
reported hole K-19-0740 from the 2019 program used a 30 g/t Ag
composite cutoff to include a maximum of two meters of
unmineralized internal dilution. Hole locations are shown in Figure
1 and results detailed in Table 2 with all intervals adjusted to
reflect estimated true width.
Clynt Nauman, Chairman and CEO of
Alexco commented, "The discovery of a significant zone of
high-grade silver mineralization beneath the Bermingham deposit
confirms that this is one of the more significant silver deposits
in the entire Keno Hill Silver District, rivalling the extent of
the historic Hector-Calumet deposit, which produced 96 million
ounces of silver prior to shutting down in 1972. If the Northeast
Deep zone discovery is further substantiated by the extensive
drilling program we have planned for 2021, it is my view that the
result will have important strategic implications for the future
development of Keno Hill. Most interestingly, even as it currently
stands, the western-most drill hole in the Northeast Deep zone -
which returned a true thickness of 8.76 meters of mineralization
grading 3,530 g/t (115.2 oz/t) Ag with 14% lead and 3% zinc - is
located just 250 m east and
75 m below the projected bottom of
the Bermingham primary decline. This means that this zone could be
easily accessed from currently-planned mine infrastructure."
2020 Program Summary and Bermingham Geology
The Bermingham deposit currently has an estimated silver Mineral
Resource of 32.96 million ounces ("Moz") Indicated and 11.74 Moz
Inferred, including 11.3 Moz in the Probable Mineral Reserve
Estimate. Within the silver Mineral Resource, 1.57 Moz Indicated
and 1.17 Moz Inferred estimated mineral resources are located in
the Northeast Zone that lies approximately 150 m above the newly discovered Northeast Deep
zone. The deeper mineralization was initially identified by surface
exploration drilling completed in 2018 and 2019 (including drill
hole K-19-0740 previously mentioned).
The 2020 drill program was designed to assess the Northeast Deep
zone in more detail, with a nominal drill grid spacing of
approximately 100 m along strike by
50 m dip separation, and holes from
surface ranging in depth between 550
m and 700 m (refer to Table 1,
Figure 1, and Figure 2).
From a geological perspective, the 2020 target zone was
interpreted to lie in the vicinity of the intersection of the
Bermingham Main vein with the Bermingham Footwall vein (see Figure
2), and specifically where the intersection occurs within the thick
bedded quartzites that host the nearby historic Hector-Calumet
mine. The 2020 exploration work has confirmed that the Northeast
Deep zone mineralization occurs within a broad, structurally
complex corridor that has a horizontal to gentle northeast plunge
with an interpreted strike length of approximately 550 m and a dip extent of up to 100 m. Importantly, to the southwest of the 2020
Northeast Deep zone, this same vein intersection and mineralized
corridor can be traced over an additional 400 m strike length through the Bear, Arctic and
Etta Zones of the Bermingham deposit, where by contrast, it has a
more moderate northeasterly plunge.
On a broader scale, it is now clear that the Bermingham vein
system represents a component of a coherent throughgoing shear zone
that demonstrates an approximate five kilometer ("km") strike
length from Hector-Calumet in the northeast to the fault offset
continuation two km's southwest of Bermingham. This major structure
includes at least the Hector-Calumet, Ruby, Bermingham, Aho and
Coral-Wigwam vein systems which in aggregate have historically
produced a total of 101 Moz Ag (see Cathro, 2006 reference below).
Importantly, significant (blind) km-scale tracts remain untested
along this highly productive system.
Note:
The 2020 exploration drill program and sampling protocol has
been reviewed, verified, and compiled by Alexco's geologic staff
under the supervision of Alan
McOnie, Vice President, Exploration for Alexco and a
Qualified Person as defined by National Instrument 43-101 ("NI
43-101"). A rigorous quality control and quality assurance protocol
is used on the project, including blank, duplicate, and standard
reference samples in each batch of 20 samples delivered to the
assay lab. Drill core samples were shipped to ALS Minerals Labs at
Whitehorse, Yukon for preparation, with fire assay and
multi-element ICP analyses completed at the ALS Minerals facility
in North Vancouver, British
Columbia.
2021 Surface Exploration Drilling Program
In mid-March 2021, Alexco is
planning to launch a large-scale surface exploration program to
drill a minimum of 25,000 m utilizing
four drills and focusing on infill and extension drilling of the
Northeast Deep zone mineralization. Directional drill technology
will be used with the objective of updating the existing Bermingham
Mineral Resource Estimate in Q4 2021, which will include the
Northeast Deep zone.
Keno Hill Operations Update
Ramp up of mining and milling operations continue with
activities adjusted and moderated to comply with modified COVID-19
protocols in the Yukon. Safety
performance at Keno Hill remains excellent with the site achieving
a milestone in December 2020 of 10
years without a Lost Time Accident. Underground activity is focused
at the Bellekeno mine where longhole drilling and blasting of
residual ore is providing feed to the mill, with concentrate
shipments to the port of Skagway having already commenced. The mill
continues the commissioning process and is operating with a
modified schedule to best match the ore delivery from Bellekeno as
well as optimizing the metallurgical performance of the changes to
the mill circuit. At the Bermingham mine, underground development
is proceeding well – with initial ore production anticipated in Q2
2021. The Alimak raise contractor has completed mobilization and
setup and is currently advancing construction of the raise to
surface. A full update and more detailed ramp up schedule for
underground and mill production is expected to be provided in
February, 2021.
Sale of Brewery Creek Net Smelter Return Royalty ("NSR
Royalty")
On January 4, 2021 Alexco sold its
NSR Royalty in Golden Predator Exploration Ltd.'s Brewery Creek
Project to Wheaton Precious Metals Corp. for total cash
consideration of CDN$4.5 million.
References
Cathro, R.J., 2006. Great Mining Camps of Canada 1, "The History and Geology of the Keno
Hill Silver Camp, Yukon
Territory." Geoscience Canada Vol. 33, No. 3.
Qualified Persons
The disclosure in this news release of scientific and technical
information regarding exploration projects on Alexco's mineral
properties has been reviewed and approved by Alan McOnie, FAusIMM, Vice President,
Exploration, while that regarding mine development and operations
has been reviewed and approved by Neil
Chambers, P.Eng., Chief Mine Engineer, both of whom are
Qualified Persons as defined by National Instrument 43-101 –
Standards of Disclosure for Mineral Projects ("NI 43-101").
About
Alexco
Alexco is a Canadian primary silver company that owns and
operates the majority of the historic Keno Hill Silver District, in
Canada's Yukon Territory, one of the highest-grade
silver deposits in the world. Alexco is currently advancing Keno
Hill to production and commenced concentrate shipments in January,
2021. As per Alexco's 2020 pre-feasibility study, Keno Hill is
expected to produce an average of approximately 4 million ounces of
silver per year contained in high quality lead/silver and zinc
concentrates. Total production over an 8-year mine life is
estimated at 1.18 million tonnes of ore at an average rate of 430
tonnes per day at an average grade of 805 grams per tonne. Keno
Hill retains significant potential to grow and Alexco has a long
history of expanding the operation's Mineral Resources through
successful exploration.
Some statements ("forward-looking statements") in this news
release contain forward-looking information plans related to
Alexco's business and other matters that may occur in the future,
made as of the date of this news release. Forward-looking
statements are subject to a variety of known and unknown risks,
uncertainties and other factors which could cause actual events or
results to differ from those expressed or implied by the
forward-looking statements. Such factors include, among others,
risks related to risks and uncertainties relating to the COVID-19
pandemic including but not limited to business closures, travel
restrictions, quarantines and a general reduction in consumer
activity; actual results and timing of exploration and development,
mining, environmental services and remediation and reclamation
activities; future prices of silver, gold, lead, zinc and other
commodities; possible variations in mineral resources, grade or
recovery rates; failure of plant, equipment or processes to operate
as anticipated; accidents, labour disputes and other risks of the
mining industry; First Nation rights and title; continued
capitalization and commercial viability; global economic
conditions; competition; and delays in obtaining governmental
approvals or financing or in the completion of development
activities. Forward-looking statements are based on certain
assumptions that management believes are reasonable at the time
they are made. In making the forward-looking statements included in
this news release, Alexco has applied several material assumptions,
including, but not limited to the circumstances surrounding the
COVID-19 pandemic, although evolving, will stabilize or at least
not worsen; that the extent to which COVID-19 may impact the
Company, including without limitation disruptions to the mobility
of Company personnel, costs associated with implementation of
health and safety protocols, increased labour and transportation
costs, and other related impacts, will not change in a materially
adverse manner; Alexco will be able to raise additional capital as
necessary, that the proposed exploration and development activities
will proceed as planned, and that market fundamentals will result
in sustained silver, gold, lead and zinc demand and prices. There
can be no assurance that forward-looking statements will prove to
be accurate and actual results and future events could differ
materially from those anticipated in such statements. Alexco
expressly disclaims any intention or obligation to update or revise
any forward-looking statements whether as a result of new
information, future events or otherwise, except as otherwise
required by applicable securities legislation.
Table 1 – Location of 2020 Drill Holes
Coordinates in UTM NAD 83 Zone 8 map projection
Hole
|
UTM East
(m)
|
UTM North
(m)
|
Elevation
(m)
|
Length
(m)
|
Surface
Azimuth
|
Surface
Inclination
|
K-20-0760
|
479729.31
|
7086976.72
|
1372.32
|
671.95
|
300.0
|
-65.0
|
K-20-0761
|
479729.54
|
7086976.57
|
1372.42
|
701.71
|
300.0
|
-69.5
|
K-20-0762
|
479891.52
|
7087079.15
|
1376.47
|
703.00
|
285.0
|
-63.0
|
K-20-0764*
|
479730.29
|
7086976.53
|
1372.43
|
194.00
|
295.0
|
-74.5
|
K-20-0765
|
479730.20
|
7086976.83
|
1372.40
|
607.00
|
305.0
|
-71.5
|
K-20-0766*
|
479891.26
|
7087079.18
|
1376.75
|
220.50
|
285.0
|
-60.0
|
K-20-0767
|
479891.32
|
7087079.21
|
1376.40
|
693.00
|
285.0
|
-57.0
|
K-20-0768
|
479483.84
|
7086723.28
|
1369.42
|
557.10
|
320.0
|
-63.0
|
K-20-0769
|
479483.84
|
7086723.26
|
1369.42
|
587.00
|
315.0
|
-65.5
|
K-20-0770
|
479891.12
|
7087079.39
|
1376.46
|
607.00
|
280.0
|
-60.0
|
K-20-0772
|
479939.38
|
7087127.75
|
1376.70
|
653.00
|
280.0
|
-64.0
|
K-20-0773
|
479563.06
|
7086887.64
|
1364.77
|
577.10
|
280.0
|
-72.5
|
K-20-0774*
|
479939.13
|
7087128.11
|
1376.61
|
191.00
|
285.0
|
-61.0
|
K-20-0775
|
479939.12
|
7087127.97
|
1376.59
|
692.00
|
283.0
|
-62.0
|
|
|
|
|
|
|
|
*
|
Hole abandoned due to
deviation
|
|
|
|
|
Table 2 – Composite Assays Calculated at +30 g/t Ag with up to
2 m of waste
Hole
|
|
From
(m)
|
To
(m)
|
Interval
(m)
|
Est. TW
(m)
|
Au
(g/t)
|
Ag
(g/t)
|
Ag
(oz/t)
|
Pb
(%)
|
Zn
(%)
|
Vein
|
K-20-0760
|
|
499.30
|
501.75
|
2.45
|
1.96
|
0.08
|
185
|
5.95
|
0.33
|
0.54
|
FW
|
Including
|
499.30
|
500.00
|
0.70
|
0.56
|
0.09
|
353
|
11.35
|
0.36
|
1.79
|
FW
|
|
505.43
|
510.07
|
4.64
|
3.71
|
0.13
|
100
|
3.22
|
0.19
|
0.76
|
FW
|
Including
|
509.06
|
509.77
|
0.71
|
0.57
|
0.07
|
368
|
11.83
|
0.43
|
4.18
|
FW
|
|
620.88
|
621.65
|
0.77
|
0.63
|
0.01
|
309
|
9.93
|
6.00
|
0.06
|
Ruby
|
|
630.56
|
631.38
|
0.82
|
0.67
|
0.04
|
158
|
5.08
|
3.71
|
0.00
|
Ruby splay
|
|
|
|
|
|
|
|
|
|
|
|
|
K-20-0761
|
|
486.65
|
488.00
|
1.35
|
1.30
|
0.53
|
4,889
|
157.19
|
7.27
|
2.06
|
BM
|
Including
|
486.65
|
487.39
|
0.74
|
0.71
|
0.93
|
8,810
|
283.25
|
12.98
|
3.54
|
BM
|
with
|
486.92
|
487.39
|
0.47
|
0.45
|
1.23
|
11,286
|
362.85
|
14.40
|
2.23
|
BM
|
|
536.84
|
545.00
|
8.16
|
6.12
|
0.29
|
1,560
|
50.16
|
1.62
|
1.31
|
FW
|
Including
|
539.71
|
543.34
|
3.63
|
2.72
|
0.60
|
3,381
|
108.71
|
3.43
|
2.42
|
FW
|
|
554.32
|
557.20
|
2.88
|
2.16
|
0.03
|
195
|
6.27
|
1.13
|
0.67
|
FW splay
|
|
560.55
|
561.43
|
0.88
|
0.66
|
0.08
|
57
|
1.82
|
0.10
|
0.16
|
FW splay
|
|
|
|
|
|
|
|
|
|
|
|
|
K-20-0762
|
|
528.61
|
529.54
|
0.93
|
0.90
|
0.03
|
31
|
0.98
|
0.32
|
0.37
|
BM
|
|
643.75
|
646.12
|
2.37
|
1.87
|
0.14
|
893
|
28.71
|
4.50
|
2.09
|
FW
|
Including
|
643.75
|
644.75
|
1.00
|
0.79
|
0.31
|
2,058
|
66.16
|
9.71
|
3.68
|
FW
|
|
|
|
|
|
|
|
|
|
|
|
|
K-20-0765
|
|
580.69
|
581.45
|
0.76
|
0.46
|
0.00
|
36
|
1.14
|
0.30
|
0.58
|
FW
|
|
|
|
|
|
|
|
|
|
|
|
|
K-20-0767
|
|
520.37
|
521.32
|
0.95
|
0.94
|
0.04
|
92
|
2.96
|
1.04
|
0.96
|
BM
|
|
526.26
|
529.59
|
3.33
|
3.30
|
0.12
|
218
|
7.01
|
3.29
|
1.54
|
BM
|
Including
|
526.26
|
527.24
|
0.98
|
0.97
|
0.32
|
516
|
16.59
|
7.38
|
3.44
|
BM
|
|
539.40
|
541.62
|
2.22
|
1.75
|
0.11
|
236
|
7.58
|
0.32
|
0.01
|
FW
|
Including
|
539.40
|
540.30
|
0.90
|
0.71
|
0.10
|
376
|
12.09
|
0.37
|
0.02
|
FW
|
|
548.69
|
549.11
|
0.42
|
0.33
|
0.17
|
30
|
0.97
|
0.06
|
0.24
|
FW splay
|
|
673.75
|
677.29
|
3.54
|
3.47
|
0.02
|
82
|
2.64
|
0.89
|
0.26
|
Townsite
|
|
|
|
|
|
|
|
|
|
|
|
|
K-20-0768
|
|
314.15
|
314.87
|
0.72
|
0.56
|
0.09
|
69
|
2.23
|
0.17
|
0.28
|
Aho
(splay)
|
|
475.65
|
476.55
|
0.90
|
0.79
|
0.26
|
771
|
24.78
|
5.37
|
6.27
|
BM
|
including
|
476.13
|
476.55
|
0.42
|
0.37
|
0.43
|
1,605
|
51.60
|
11.05
|
5.41
|
BM
|
|
483.02
|
487.55
|
4.53
|
3.99
|
0.09
|
184
|
5.92
|
0.15
|
0.23
|
BM splay
|
including
|
484.24
|
484.65
|
0.41
|
0.36
|
0.21
|
1,470
|
47.26
|
0.81
|
0.01
|
BM splay
|
|
490.30
|
491.00
|
0.70
|
0.62
|
0.11
|
168
|
5.40
|
0.39
|
0.00
|
BM splay
|
|
493.10
|
497.50
|
4.40
|
3.48
|
0.12
|
321
|
10.31
|
0.33
|
4.90
|
FW
|
Including
|
495.75
|
497.50
|
1.75
|
1.38
|
0.09
|
636
|
20.46
|
0.09
|
8.38
|
FW
|
|
|
|
|
|
|
|
|
|
|
|
|
K-20-0769
|
|
473.86
|
477.75
|
3.89
|
3.50
|
0.45
|
707
|
22.72
|
2.28
|
0.72
|
BM
|
Including
|
476.72
|
477.75
|
1.03
|
0.93
|
0.53
|
2,337
|
75.14
|
6.19
|
0.73
|
BM
|
|
484.63
|
485.57
|
0.94
|
0.85
|
0.04
|
403
|
12.95
|
0.11
|
0.92
|
BM
|
Including
|
484.63
|
485.00
|
0.37
|
0.33
|
0.09
|
956
|
30.74
|
0.07
|
2.01
|
BM
|
|
497.69
|
497.95
|
0.26
|
0.23
|
0.03
|
705
|
22.67
|
8.91
|
0.00
|
BM
|
|
507.24
|
518.76
|
11.52
|
8.76
|
0.46
|
3,583
|
115.20
|
13.71
|
3.45
|
FW
|
Including
|
507.70
|
513.67
|
5.97
|
4.54
|
0.64
|
5,497
|
176.73
|
26.12
|
6.19
|
FW
|
with
|
509.81
|
510.35
|
0.54
|
0.41
|
1.67
|
15,174
|
487.84
|
77.58
|
0.87
|
FW
|
with
|
512.42
|
512.79
|
0.37
|
0.28
|
2.73
|
21,994
|
707.12
|
43.93
|
9.43
|
FW
|
Including
|
516.60
|
518.76
|
2.16
|
1.64
|
0.64
|
3,834
|
123.28
|
0.67
|
0.10
|
FW
|
with
|
517.45
|
517.76
|
0.31
|
0.24
|
3.88
|
23,906
|
768.60
|
3.74
|
0.26
|
FW
|
|
|
|
|
|
|
|
|
|
|
|
|
K-20-0770
|
|
525.12
|
526.31
|
1.19
|
1.18
|
0.10
|
174
|
5.59
|
2.88
|
2.37
|
BM
|
Including
|
525.48
|
525.68
|
0.20
|
0.20
|
0.23
|
735
|
23.63
|
13.00
|
9.13
|
BM
|
|
552.49
|
555.11
|
2.62
|
2.28
|
0.18
|
693
|
22.27
|
0.78
|
1.18
|
FW splay
|
Including
|
554.28
|
555.11
|
0.83
|
0.72
|
0.42
|
1,987
|
63.88
|
2.42
|
3.36
|
FW splay
|
with
|
554.50
|
555.11
|
0.61
|
0.53
|
0.40
|
2,570
|
82.63
|
3.27
|
2.55
|
FW splay
|
|
559.06
|
567.63
|
8.57
|
7.46
|
0.13
|
1,381
|
44.40
|
2.23
|
1.37
|
FW
|
Including
|
563.67
|
567.63
|
3.96
|
3.45
|
0.23
|
1,626
|
52.28
|
2.12
|
0.82
|
FW
|
with
|
563.67
|
564.12
|
0.45
|
0.39
|
0.94
|
4,180
|
134.39
|
6.45
|
3.18
|
FW
|
with
|
566.34
|
566.62
|
0.28
|
0.24
|
0.77
|
9,800
|
315.08
|
9.14
|
5.25
|
FW
|
|
569.73
|
571.45
|
1.72
|
1.50
|
0.07
|
60
|
1.93
|
0.38
|
1.92
|
FW splay
|
|
574.79
|
575.83
|
1.04
|
0.90
|
0.04
|
67
|
2.16
|
1.28
|
1.20
|
FW splay
|
|
|
|
|
|
|
|
|
|
|
|
|
K-20-0772
|
|
623.36
|
624.03
|
0.67
|
0.62
|
0.09
|
198
|
6.37
|
1.41
|
0.42
|
Townsite
splay
|
|
627.24
|
627.70
|
0.46
|
0.42
|
0.09
|
714
|
22.96
|
0.80
|
0.04
|
Townsite
splay
|
|
|
|
|
|
|
|
|
|
|
|
|
K-20-0773
|
|
479.68
|
482.00
|
2.32
|
2.02
|
0.09
|
119
|
3.82
|
1.70
|
0.96
|
BM
|
|
496.24
|
504.15
|
7.91
|
5.30
|
0.22
|
2,070
|
66.55
|
27.10
|
0.52
|
FW
|
Including
|
498.64
|
503.22
|
4.58
|
3.07
|
0.36
|
3,528
|
113.43
|
35.73
|
0.76
|
FW
|
with
|
499.31
|
502.82
|
3.51
|
2.35
|
0.44
|
4,425
|
142.27
|
45.29
|
0.82
|
FW
|
|
554.98
|
555.97
|
0.99
|
0.87
|
0.25
|
33
|
1.06
|
0.10
|
0.19
|
Bear splay
|
|
|
|
|
|
|
|
|
|
|
|
|
K-20-0775
|
|
536.67
|
536.98
|
0.31
|
0.30
|
0.07
|
321
|
10.32
|
2.76
|
11.60
|
BM
|
|
609.43
|
609.65
|
0.22
|
0.20
|
0.11
|
286
|
9.20
|
2.69
|
0.13
|
Townsite
splay
|
View original
content:http://www.prnewswire.com/news-releases/alexco-extends-bermingham-high-grade-mineralization-at-depth-intersects-3-583-gt-silver-over-8-76-meters-true-width-and-other-significant-results-301210841.html
SOURCE Alexco Resource Corp.