JOURDAN RESOURCES INC. (TSXV: JOR; OTCQB: JORFF;
FRA:2JR1) (“
Jourdan” or the
“
Company“) is pleased to announce that an
additional drill rig has arrived on site at the Company’s Vallée
property to accelerate completion of its phase 3 summer drill
campaign. We expect that the new drill program will result in an
extension of the known deposit at the property eastwards (see Fig.
1 below).
The second diamond drill is intended to help
complete drilling 28 newly permitted drill holes east of the Chemin
du Lac Legendre, the results of which we anticipate will extend the
known Vallée lithium deposit eastwards. The additional 5,600m
diamond drilling program is intended to follow up on the results of
the fence line drilled in 2011, 2021 and 2022 along the western
side of the Company’s Vallée property, which borders with the North
American Lithium mine. This new drilling campaign aims at drilling
fence lines further east across the lithium-bearing pegmatite
swarm, which has been mined in the immediate vicinity to the
west.
28 holes of approximately 200m depth each are
scheduled to be drilled, aiming at the pegmatite swarm identified
by the trenching of the bulk sample collected on the Vallée
property in 2018 and initially intersected by the 2011 fence line
drilling campaign along the western boundary of Vallée. The assay
results from the bulk sample revealed high Li2O grades (see press
release of the Company dated April 29, 2021, which is available
under the Company’s SEDAR profile at www.sedar.com), which have
encouraged the Company to continue exploration and drilling along
the strike and depth extent on its Vallée property.
Jourdan’s Executive Chairman, Dr. Andreas
Rompel, stated, “We are greatly encouraged by the drilling results
received to date as well as having successfully secured the permits
for more diamond drilling. This latest drilling phase will now be
facilitated by a second rig to speed up the process and, hopefully,
prove up the known pegmatite swarm even further to the east.”
The drill program will be conducted by Forage
Lamontagne Fortier from Rouyn-Noranda, Quebec, under the
supervision of Alexandr Beloborodov, Géologue Inc. (ABG
Exploration) of Laval, Quebec and GeoTasks Inc. from Sudbury.
All samples from the new drill program will be
sent to Impact Global Solutions Inc.’s laboratory in Delson, Québec
(“IGS”) for analysis by sodium peroxide fusion and
ICP finish. This laboratory is recognized by the industry and
accredited ISO/MEC 17025 by the Standards Council of Canada. In
addition to the quality assurance and quality controls
(“QA/QC”) employed by IGS, Jourdan developed a
rigorous QA/QC protocol for its operators, including the insertion
of analytical standard samples, duplicates and coarse silica blanks
on a systematic basis.
Figure 1: The Vallée property is approximately
35km north of Val-d’Or and immediately east of the North American
Lithium mine. This figure depicts the 2011, 2021 and 2022 completed
drillholes and the next phases of drilling planned for the 2022
campaign. All 26 drillholes completed since 2021 have intersected
the Li-bearing, spodumene-rich pegmatite
swarm.https://www.globenewswire.com/NewsRoom/AttachmentNg/2fa9324b-fb74-472f-8069-b91996a39817
Soil Sampling Program:The soil
sampling program on the Vallée claims is being conducted on a 200m
x 100m and 50m x 50m grid following the spodumene swarm east of the
road. We intend to use the results from the program to identify new
drill targets. A field crew consisting of geological and
exploration technicians has been mobilized to the area and has
begun collecting soil samples. Soil samples are being collected
using two-person teams equipped with picks and shovels. Samples are
being collected from the B-horizon at a depth ranging from 10cm to
110cm. Samples from approximately 550 sites are scheduled to be
collected to add to the approximately 1,200 samples already
collected since July 2022. All samples are being analyzed daily for
rubidium (Rb) and tantalum (Ta) by a portable XRF gun from SciAps.
Samples are then sent to IGS for pathfinder element analysis.
The soil sampling program is aimed at finding
new lithium anomalies and showings in areas of known lithium
mineralization at Baillargé, Preissac-La Corne, Duval Lithium in La
Motte, and especially in Vallée Lithium. We also expect to continue
our geological mapping and prospecting program that has been
running in parallel with the soil sampling program.
Sample data collected includes UTM location,
depth of sample, color, moisture content, texture (sand, silt, and
clay), and percentage, angularity and lithology of pebbles and or
cobbles. Each sample collected amounts to approximately 1kg of
material and is placed in a plastic sample bag. Wet samples are
additionally placed into 5ml plastic Ziploc bags to prevent
contamination. At the end of the day, all samples are placed inside
the Company's shop facility on a rack and allowed to dry for at
least one week before shipping to IGS.
The geochemical soil sampling program was
designed and is being sampled by GeoTasks Inc.’s technical team
from Sudbury, Ontario. Their technical team is supervised by OGQ
compliant senior geologists.
Figure 2: Soil sampling location on the Jourdan
properties which are approximately 35km north of
Val-d’Or. Red outline is the planned 50m x 50m
grid soil survey and blue outline is the 200m x 100m grid
survey.
https://www.globenewswire.com/NewsRoom/AttachmentNg/4f4f4af7-a915-42e4-a0eb-81694fbcc4a3
Qualified PersonThe scientific
and technical information contained herein has been reviewed and
approved by Alexandr Beloborodov, P.Geo., an independent consultant
that is a “qualified person” as defined in National Instrument
43-101 – Standards of Disclosure for Mineral Projects.
About Jourdan Resources Inc.
Jourdan is a Canadian junior mining exploration company trading
under the symbol “JOR” on the TSX Venture Exchange and “2JR1” on
the Stuttgart Stock Exchange. The Company is focused on the
acquisition, exploration, production, and development of mining
properties. The Company’s properties are in Quebec, Canada,
primarily in the spodumene-bearing pegmatites of the La Corne
Batholith, around North American Lithium’s producing Quebec Lithium
Mine.
For more information:Rene
Bharti, Chief Executive Officer and PresidentEmail:
info@jourdaninc.comPhone: (416) 861-5800www.jourdaninc.com
Cautionary statements
The content and grades of any mineral deposits
at the Company’s properties are conceptual in nature. There has
been insufficient exploration to define a mineral resource on the
property and it is uncertain if further exploration will result in
any target being delineated as a mineral resource.
This press release contains “forward-looking
information” within the meaning of applicable Canadian securities
legislation. Forward-looking information includes, but is not
limited to, statements with respect to the Company’s Q3 2022 drill
program, including its scope and the Company’s expectation that the
second drill will accelerate its completion and that it will extend
the known deposit at its Vallée property eastwards, and the ability
of the Company to establish an initial mineral resource estimate at
its properties, to collect additional samples for the soil sampling
program, to identify new drill targets, lithium anomalies and
showings, to continue its geological mapping and prospecting
program, and to execute its business plan. Generally,
forward-looking information can be identified by the use of
forward-looking terminology such as “plans”, “expects” or “does not
expect”, “is expected”, “budget”, “scheduled”, “estimates”,
“forecasts”, “intends”, “anticipates” or “does not anticipate”, or
“believes”, or variations of such words and phrases or statements
that certain actions, events or results “may”, “could”, “would”,
“might” or “will be taken”, “occur” or “be achieved”.
Forward-looking information is subject to known and unknown risks,
uncertainties and other factors that may cause the actual results,
level of activity, performance or achievements of Jourdan to be
materially different from those expressed or implied by such
forward-looking information, including but not limited to: receipt
of necessary approvals; general business, economic, competitive,
political and social uncertainties; future mineral prices and
market demand; accidents, labour disputes and shortages and other
risks of the mining industry. Although Jourdan has attempted to
identify important factors that could cause actual results to
differ materially from those contained in forward-looking
information, there may be other factors that cause results not to
be as anticipated, estimated or intended. There can be no assurance
that such information will prove to be accurate, as actual results
and future events could differ materially from those anticipated in
such statements. Accordingly, readers should not place undue
reliance on forward-looking information. Jourdan does not undertake
to update any forward-looking information, except in accordance
with applicable securities laws.
NEITHER TSX
VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM
IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS
RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS
RELEASE.
Jourdan Resources (TSXV:JOR)
過去 株価チャート
から 12 2024 まで 1 2025
Jourdan Resources (TSXV:JOR)
過去 株価チャート
から 1 2024 まで 1 2025