Drilling Update: Cliff Head-6
2005年2月28日 - 4:03PM
RNSを含む英国規制内ニュース (英語)
RNS Number:0916J
Roc Oil Company Limited
28 February 2005
28 February 2005
ROC OIL COMPANY LIMITED
STOCK EXCHANGE RELEASE
DRILLING ACTIVITY UPDATE:
CLIFF HEAD-6 STARTS DRILLING
KEY POINT
* Cliff Head-6 (CH-6), commenced drilling at the Cliff Head Oil Field on
27 February 2005. By next week's report time, CH-6 is expected to have
reached Total Depth.
Roc Oil (WA) Pty Ltd, Operator for and on behalf of the WA-286-P Joint Venture
(the "Joint Venture"), advises that the ENSCO-56 jack-up drilling rig commenced
drilling the CH-6 well at 1430 on 27 February, 2005 (Australian Western Standard
Time ("AWST")). As at 0600 hrs Monday 28 February (AWST) 20" casing had been set
and the rig was preparing to drill ahead in 16" hole at a depth of 88 metres.
CH-6 is a deviated well located on the central horst about 1.6 km north of the
CH-1 discovery well. The well is expected to take approximately 7 days to
reached a Total Depth of 1,481 metres.
The WA-286-P Joint Venture comprises: Equity
Roc Oil (WA) Pty Ltd (Operator)...........................37.5%
AWE Oil (Western Australia) Pty Ltd ......................27.5%
Wandoo Petroleum Pty Ltd..................................24.0%
Voyager (PB) Limited.......................................6.0%
CIECO Exploration and Production (Australia) Pty Ltd ......5.0%
Bruce Clement For further information please contact:
Chief Operating Officer Dr John Doran on
Tel: +61-2-8356-2000
Fax: +61-2-9380-2635
Email: jdoran@rocoil.com.au
Or visit ROC's website:
www.rocoil.com.au
Dr Kevin Hird
General Manager Business Development
Tel: +44 (0)207 586 7935
Fax: +44 (0)207 722 3919
Email: khird@rocoil.com.au
Nick Lambert
Bell Pottinger Corporate & Financial
Tel: +44 (0)207 861 3232
This information is provided by RNS
The company news service from the London Stock Exchange
END
DRLPUUCUPUPAPWM
Rockpool Acquisitions (LSE:ROC)
過去 株価チャート
から 6 2024 まで 7 2024
Rockpool Acquisitions (LSE:ROC)
過去 株価チャート
から 7 2023 まで 7 2024