RNS Number : 0235E
Echo Energy PLC
13 September 2024
 

This announcement contains inside information for the purposes of Article 7 of the UK version of Regulation (EU) No 596/2014 which is part of UK law by virtue of the European Union (Withdrawal) Act 2018, as amended ("MAR"). Upon the publication of this announcement via a Regulatory Information Service, this inside information is now considered to be in the public domain.

 

13 September 2024

 

Echo Energy Plc

("Echo" or the "Company")

 

Operational Update: Tesoro Gold Concession

Echo (LON:ECHO), the Latin America focused natural resources company, provides the following update on the Tesoro Gold Concession ("Tesoro"), southern Peru, which is held by the Company's 50%-owned Peruvian joint venture, Boku Resources SAC ("Boku").

Boku has initiated the development of the primary "Bonanza" vein, deemed to be the richer of the two mapped veins ("Dorada" being the second vein). Both veins have been mapped at surface and in discrete shafts, down to circa 10m.

In preparation for mining the Bonanza vein, an access shaft has been sunk to 12.1m and lateral development has advanced 15m along the vein. Mapping of exposures shows that the vein pinches and swells between 0.1m and 0.8m, with the average vein width estimated at between 0.15m to 0.2m. Local examples of similar veins host "ore shoots" that can extend for up to 40m laterally and reach depths of 80m (the level of the deepest known mine).

Boku intends to initially prepare two 42m by 30m blocks for cut and fill mining. Each block contains in the region of 589 tonnes of vein material. Boku estimates that the first two blocks will be prepared and ready to mine within the next 15 weeks. Further development will prepare blocks beneath the first blocks, down to 78m and along strike for a further 84m i.e. an additional 3,500 tonnes of vein material. In parallel, Boku intends to initiate development of the Dorada vein system.

Some vein material recovered from the shaft development has been milled and panned at site, demonstrating the presence of gold. Samples of vein material have been submitted to an independent certified laboratory to quantify gold grade, with results expected in early October 2024.  

As announced on 8 July 2024, results from samples also taken in the preparation of the shaft at Bonanza and from the Dorada shaft, yielded between 13.13g/t Au and 21.36g/t gold and had gold recovery rates of between 90.53% and 92.93%.

Miners have to date recovered a 13,000 kg bulk sample of vein material. This is technically Boku's initial production and will be sold to a commercial processor with the proceeds being used to further develop Tesoro. A number of potential processors have been identified, with terms being negotiated.

Stephen Birrell, Chief Executive Officer of Echo, commented:

"I have just returned from a very successful visit to the Tesoro Mine, meeting with the Mine Manager, Mining Engineer and miners. Progress in "preparing the mine to mine" is on track and we are looking forward to Boku receiving early revenue from the ore recovered during the shaft preparation process. We also took the opportunity to meet with our joint venture partners at Boku and held meetings on further potential projects under discussion."

Update re Name Change

The name change from Echo Energy plc to Nativo Resources plc, approved by shareholders at the General Meeting on 28 August 2024, is currently being processed with Companies House. A further announcement will be made in due course upon confirmation of the change taking effect, following which trading of the Company's shares will take place on AIM under the new name and with a new TIDM (AIM: NTVO). The Company's ISIN and SEDOL numbers will remain unchanged.

For further information please contact:

 

Echo

Stephen Birrell, Chief Executive Officer

Via Vigo Consulting

echo@vigoconsulting.com

 

Zeus Capital Limited (Nominated Adviser and Joint Broker)

James Joyce

James Bavister

Isaac Hooper

 

Tel: +44 (0)20 3829 5000

 

Peterhouse Capital limited (Joint Broker)

Duncan Vasey

Lucy Williams

 

 

Tel: +44 (0)20 7469 0930

 

Vigo Consulting (Investor Relations)

Ben Simons

Peter Jacob

 

Tel: +44 (0)20 7390 0234

echo@vigoconsulting.com

 

About Echo

 

Following the partial divestment of its assets in Argentina, Echo entered into a 50:50 joint venture in Peru in July 2024 with an experienced local partner for precious metals (gold/silver) mining and the cleaning of known tailings deposits containing Measured and Indicated resources of gold and silver. Through the JV, known as Boku Resources, Echo has secured an opportunity to scale operations in Peru producing gold and silver through primary mining and tailings cleaning, owning 50% of the production and resources. Initially, Boku intends to establish formalised artisanal and small mining operations on its 100% held Tesoro Gold concession, southern Peru, targeting early cash flow generation by Q4 2024.

 

Qualified Persons Statement


The scientific and technical information contained within this announcement has been reviewed and approved by Dr Alberto Rios Carranza, a geologist with over 27 years' experience, who holds a doctorate cum laude awarded by the Polytechnical University of Madrid, Spain and who has published or co-authored over 17 scientific papers on the mineralisation across Peru. Alberto is a member of the Geological Society of Peru, the Colombian Society of Geology and the Institute of Mining Engineers of Peru. He is a Qualified Person as defined by the AIM Guidance Note on Mining and Oil & Gas Companies dated June 2009.

 

Follow us on social media:

 

LinkedIn: https://www.linkedin.com/company/echo-energy-plc  

X (Twitter): https://x.com/nativoresources

 

Glossary

 

Au

gold

g/t

grams per tonne



kg

kilogram

m

meters

ore shoots

An ore shoot is a hypogenic mass that is deposited in veins within a planar channel or lode, found in a shear or fault zone, fissure or lithologic boundary. The ore shoot is the area of concentration which contains a primary ore along the veins present in the rock, and consists of the most valuable part of the deposit

t

tonnes

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDDZGMLKZVGDZM
Echo Energy (LSE:ECHO)
過去 株価チャート
から 11 2024 まで 12 2024 Echo Energyのチャートをもっと見るにはこちらをクリック
Echo Energy (LSE:ECHO)
過去 株価チャート
から 12 2023 まで 12 2024 Echo Energyのチャートをもっと見るにはこちらをクリック