NYBob
3年前
Gold Will EXPLODE When This Happens... Mark Bristow | Inflation & Latest Price Prediction
https://www.youtube.com/watch?v=KknCO9OA38I
$i-80 Gold Intersects High-Grade Gold in Underground Drilling at Granite Creek English
i-80 Gold Corp Logo (CNW Group/i-80 Gold Corp)
NEWS PROVIDED BY
i-80 Gold Corp
Oct 28, 2021, 06:00 ET
$Including 41.3 g/t Au over 7.1 m & 16.0 g/t Au over 7.3 m
RENO, Nev., Oct. 28, 2021 /PRNewswire/ -
$i-80 GOLD CORP. (TSX: IAU) (OTCQX: IAUCF) ("i-80", or the "Company")
is pleased to announce positive initial assay results from the ongoing
underground drill program at the Company's Granite Creek Property
("Granite Creek" or "the Property") located in Humboldt County, Nevada.
https://www.prnewswire.com/news-releases/i-80-gold-intersects-high-grade-gold-in-underground-drilling-at-granite-creek-301410644.html
$i-80 Gold Corp closes acquisition of Ruby Hill after Lone Tree and Buffalo Mountain transactions
Oct 19, 2021
https://www.youtube.com/watch?v=ZW2eRUs8MiA
$i-80 Gold Corp begins test mining program at its Granite Creek property in Nevada
Sep 15, 2021
Proactive
I-80 Gold Corp CEO Ewan Downie tells Proactive the Reno-based group is
hoping to advance underground drilling and test mining on the Granite Creek property, which he says is one of the highest-grade gold deposits in North America with resource grades of over 10 grams per ton (g/t) gold.
Downie says the test mining program will verify the appropriate methods, cycles and sequences for mining, and will include both mechanical cutting and conventional mining methods. He says four surface and underground drills will prepare the project -
https://www.youtube.com/watch?v=0LP1Po2ApiA
i-80 Gold Initiates Underground Test Mining Program at Granite Creek, Nevada
T.IAU | 2 days ago
RENO, Nev., Sept.14, 2021 /PRNewswire/ - i-80 GOLD CORP. (TSX: IAU) (OTCQX: IAUCF) ("i-80", or the "Company") is pleased to announce that initial rehabilitation of the underground workings has been completed at the Company's Granite Creek Mine ("Granite Creek" or "the Property") property located in Humboldt County, Nevada and an underground test mining program is now underway.
Granite Creek hosts both open pit and underground resources and is located proximal to Nevada Gold Mines' ("NGM") Twin Creeks and Turquoise Ridge mines at the north end of the Battle Mountain-Eureka Trend at its intersection with the Getchell gold belt in Nevada. The underground deposit at Granite Creek represents one of the highest-grade gold deposits in North America with resource grades in excess of 10 grams per tonne gold (see Table 1 below).
$I-80 TO ACQUIRE LONE TREE/PROCESSING FACILITIES, BUFFALO MTN & RUBY HILL TO CREATE NEVADA MINING COMPLEX
$I-80 TO ACQUIRE LONE TREE/PROCESSING FACILITIES, BUFFALO MTN & RUBY HILL TO CREATE NEVADA MINING COMPLEX
https://www.i80gold.com/
Conference Call Replay
A recording of the call can be accessed until September 14, 2021.
North American Toll-free Replay: 1-888-203-1112
Replay Code: 8375917
https://www.i80gold.com/i-80-to-acquire-lone-tree-processing-facilities-buffalo-mtn-ruby-hill-to-create-nevada-mining-complex/
$I-80 GOLD INTERSECTS HIGH-GRADE GOLD IN OPEN PIT DRILLING AT GRANITE CREEK
6.80 g/t Au over 51.1 Metres – Oxide Mineralization below CX-Pit
Reno, Nevada, August 30, 2021 – i-80 GOLD CORP. (TSX:IAU) (OTCQX:IAUCF)
(“i-80”, or the “Company”) is pleased to announce that assay results
for the first hole drilled at the Company’s Granite Creek Property
(“Granite Creek” or “the Property”) located in Humboldt County, Nevada
has returned high-grade results that confirm the high-grade open pit
opportunity.
Hole iGM21-01, drilled from the bottom of the historic CX-Pit
intersected two zones of mineralization grading
3.17 g/t Au over 7.5 m and
6.80 g/t Au over 51.1 m (see Table 1).
The hole was drilled for metallurgical purposes into the main structure
below the pit (true widths unknown) and returned exceptional grades
that appear to be oxide mineralization based on an average cyanide
soluble to fire assay ratio of 0.94 over both intervals.
The surface drill program targeting open pit mineralization at Granite
Creek is complete (see Figure 2 below) and multiple assays remain
pending.
The drill program was focused on intersecting material to be used for
metallurgical and geotechnical purposes in advance of initiating
permitting for an open pit mine and on-site processing.
https://www.i80gold.com/i-80-gold-intersects-high-grade-gold-in-open-pit-drilling-at-granite-creek/
$SOUTH ARTURO GOLD MINE: Located along the northern section of the
productive Carlin Trend,
i-80 holds a 40% interest in the South Arturo Property in partnership with
Nevada Gold Mines, a joint venture between Barrick Gold Corporation and
Newmont Corporation, that owns the remaining 60% interest.
$The South Arturo Mine in Nevada is a joint venture, operated by Nevada Gold Mines LLC, with Barrick Gold Corporation (“Barrick”).
Several opportunities exist on the property including the recently
developed El Nino underground mine.
El Nino is the second mine to be developed at South Arturo and as with
the Phase 2 open pit it has delivered consistent results.
visit our website at
http://www.i80gold.com
Replay Code: 3652970
https://www.i80gold.com/i-80-gold-to-announce-second-quarter-financial-results-on-august-11-2021/
About i-80 Gold Corp.
i-80 Gold Corp is a Nevada-focused mining company aimed on achieving
mid-tier gold producer status through the development of the Company’s
advanced-stage project portfolio.
In addition to its producing mine, El Nino at South Arturo,
i-80 is advancing economic studies and test mining at
the Granite Creek Project, and planning for advanced
underground exploration at the McCoy-Cove Property.
For further information, please contact:
Ewan Downie – CEO
Matthew Gollat – EVP Business & Corporate Development
1.866.525.6450
Info@i80gold.com
http://www.i80gold.com
$i-80 Gold is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
$i-80 Gold Corp. (TSX: IAU): Newest Gold Producer in the Market. a Nevada-
Focused Mining Company, Goal of Achieving Mid-Tier Gold Producer Status;
Ewan Downie, CEO Interviewed
By Dr. Allen Alper, PhD Economic Geology and Petrology, Columbia
University, NYC, USA
on 4/25/2021
We spoke with Ewan Downie, CEO and Director of i-80 Gold Corp. (TSX: IAU),
the newest gold producer in the market. i-80 Gold Corp is a Nevada-focused
mining company, with a goal of achieving mid-tier gold producer status.
$The Company is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
The Company is also advancing the development of its 100% owned,
feasibility-stage McCoy-Cove projects, located proximal
to Nevada Gold Mines’ Phoenix operation, and
its past producing Getchell project that is located immediately
south of Nevada Gold Mines’ Turquoise Ridge operation.
The PEA of the Getchell project is expected to be completed in H1 2021,
followed by the commissioning of a Preliminary Feasibility or
Feasibility Study, immediately after.
http://www.metalsnews.com/Metals+News/MetalsNews/Dr.+Allen+Alper,+PhD+Economic+Geology+and+Petrology,+Columbia+University,+NYC,+USA/FEATURED1353150/i80+Gold+Corp+(TSX+IAU)+Newest+Gold+Producer+in+the+Market+a+NevadaFocused+Mining+Company+Goal+of+Achieving+Mid.htm
About i-80 Gold Corp.
i-80 Gold Corp. is a Nevada-focused mining company with a goal of achieving mid-tier gold producer status. In addition to its producing mine, El Nino at South Arturo, i-80 is beginning to plan for future production growth through the potential addition of the Phases 1 & 3 projects at South Arturo and advancing the development of the Company’s Getchell and McCoy-Cove Projects.
Qualified Person
Tim George, PE, Manager of Engineering Services, is the Qualified Person
for the information contained in this press release and is a Qualified
Person within the meaning of National Instrument 43-101.
The primary assay laboratories for the South Arturo Mine are ALS
Minerals and American Assay Labs in Reno, Nevada. For a complete
description of sample preparation, analytical methods and QA/QC
procedures, refer to the technical report dated January 25, 2021
(effective date December 1, 2020), titled “Preliminary Feasibility
Study for the South Arturo Mine, Elko County, NV” located on i-80’s
website
https://i80gold.com
and at www.sedar.com.
Abbreviations used in this press release are available by following this link (click here).
https://i80gold.com/investors/#presentation
For further information, please contact:
Ewan Downie, CEO
1.888.346.1390
Info@i80gold.com
http://www.i80gold.com
https://i80gold.com/south-arturo/
In GOD We Trust - Real Money -
https://www.kitco.com/images/live/silver.gif?0.8344882022363285
http://www.kitconet.com/images/live/au0001wb.gif
Gold & Silver is the only REAL Legal Tender -
by The Founding Fathers for your -
Rights, Liberty and Freedom -
http://www.biblebelievers.org.au/monie.htm
God Bless America
Ps.
opinion appreciated
NYBob
3年前
$i-80 Gold Corp closes acquisition of Ruby Hill after Lone Tree and Buffalo Mountain transactions
54 viewsOct 19, 2021
https://www.youtube.com/watch?v=ZW2eRUs8MiA
$i-80 Gold Corp begins test mining program at its Granite Creek property in Nevada
66 views Sep 15, 2021
Proactive
I-80 Gold Corp CEO Ewan Downie tells Proactive the Reno-based group is
hoping to advance underground drilling and test mining on the Granite Creek property, which he says is one of the highest-grade gold deposits in North America with resource grades of over 10 grams per ton (g/t) gold.
Downie says the test mining program will verify the appropriate methods, cycles and sequences for mining, and will include both mechanical cutting and conventional mining methods. He says four surface and underground drills will prepare the project -
https://www.youtube.com/watch?v=0LP1Po2ApiA
i-80 Gold Initiates Underground Test Mining Program at Granite Creek, Nevada
T.IAU | 2 days ago
RENO, Nev., Sept.14, 2021 /PRNewswire/ - i-80 GOLD CORP. (TSX: IAU) (OTCQX: IAUCF) ("i-80", or the "Company") is pleased to announce that initial rehabilitation of the underground workings has been completed at the Company's Granite Creek Mine ("Granite Creek" or "the Property") property located in Humboldt County, Nevada and an underground test mining program is now underway.
Granite Creek hosts both open pit and underground resources and is located proximal to Nevada Gold Mines' ("NGM") Twin Creeks and Turquoise Ridge mines at the north end of the Battle Mountain-Eureka Trend at its intersection with the Getchell gold belt in Nevada. The underground deposit at Granite Creek represents one of the highest-grade gold deposits in North America with resource grades in excess of 10 grams per tonne gold (see Table 1 below).
$I-80 TO ACQUIRE LONE TREE/PROCESSING FACILITIES, BUFFALO MTN & RUBY HILL TO CREATE NEVADA MINING COMPLEX
$I-80 TO ACQUIRE LONE TREE/PROCESSING FACILITIES, BUFFALO MTN & RUBY HILL TO CREATE NEVADA MINING COMPLEX
https://www.i80gold.com/
Conference Call Replay
A recording of the call can be accessed until September 14, 2021.
North American Toll-free Replay: 1-888-203-1112
Replay Code: 8375917
https://www.i80gold.com/i-80-to-acquire-lone-tree-processing-facilities-buffalo-mtn-ruby-hill-to-create-nevada-mining-complex/
$I-80 GOLD INTERSECTS HIGH-GRADE GOLD IN OPEN PIT DRILLING AT GRANITE CREEK
6.80 g/t Au over 51.1 Metres – Oxide Mineralization below CX-Pit
Reno, Nevada, August 30, 2021 – i-80 GOLD CORP. (TSX:IAU) (OTCQX:IAUCF)
(“i-80”, or the “Company”) is pleased to announce that assay results
for the first hole drilled at the Company’s Granite Creek Property
(“Granite Creek” or “the Property”) located in Humboldt County, Nevada
has returned high-grade results that confirm the high-grade open pit
opportunity.
Hole iGM21-01, drilled from the bottom of the historic CX-Pit
intersected two zones of mineralization grading
3.17 g/t Au over 7.5 m and
6.80 g/t Au over 51.1 m (see Table 1).
The hole was drilled for metallurgical purposes into the main structure
below the pit (true widths unknown) and returned exceptional grades
that appear to be oxide mineralization based on an average cyanide
soluble to fire assay ratio of 0.94 over both intervals.
The surface drill program targeting open pit mineralization at Granite
Creek is complete (see Figure 2 below) and multiple assays remain
pending.
The drill program was focused on intersecting material to be used for
metallurgical and geotechnical purposes in advance of initiating
permitting for an open pit mine and on-site processing.
https://www.i80gold.com/i-80-gold-intersects-high-grade-gold-in-open-pit-drilling-at-granite-creek/
$SOUTH ARTURO GOLD MINE: Located along the northern section of the
productive Carlin Trend,
i-80 holds a 40% interest in the South Arturo Property in partnership with
Nevada Gold Mines, a joint venture between Barrick Gold Corporation and
Newmont Corporation, that owns the remaining 60% interest.
$The South Arturo Mine in Nevada is a joint venture, operated by Nevada Gold Mines LLC, with Barrick Gold Corporation (“Barrick”).
Several opportunities exist on the property including the recently
developed El Nino underground mine.
El Nino is the second mine to be developed at South Arturo and as with
the Phase 2 open pit it has delivered consistent results.
visit our website at
http://www.i80gold.com
Replay Code: 3652970
https://www.i80gold.com/i-80-gold-to-announce-second-quarter-financial-results-on-august-11-2021/
About i-80 Gold Corp.
i-80 Gold Corp is a Nevada-focused mining company aimed on achieving
mid-tier gold producer status through the development of the Company’s
advanced-stage project portfolio.
In addition to its producing mine, El Nino at South Arturo,
i-80 is advancing economic studies and test mining at
the Granite Creek Project, and planning for advanced
underground exploration at the McCoy-Cove Property.
For further information, please contact:
Ewan Downie – CEO
Matthew Gollat – EVP Business & Corporate Development
1.866.525.6450
Info@i80gold.com
http://www.i80gold.com
$i-80 Gold is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
$i-80 Gold Corp. (TSX: IAU): Newest Gold Producer in the Market. a Nevada-
Focused Mining Company, Goal of Achieving Mid-Tier Gold Producer Status;
Ewan Downie, CEO Interviewed
By Dr. Allen Alper, PhD Economic Geology and Petrology, Columbia
University, NYC, USA
on 4/25/2021
We spoke with Ewan Downie, CEO and Director of i-80 Gold Corp. (TSX: IAU),
the newest gold producer in the market. i-80 Gold Corp is a Nevada-focused
mining company, with a goal of achieving mid-tier gold producer status.
$The Company is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
The Company is also advancing the development of its 100% owned,
feasibility-stage McCoy-Cove projects, located proximal
to Nevada Gold Mines’ Phoenix operation, and
its past producing Getchell project that is located immediately
south of Nevada Gold Mines’ Turquoise Ridge operation.
The PEA of the Getchell project is expected to be completed in H1 2021,
followed by the commissioning of a Preliminary Feasibility or
Feasibility Study, immediately after.
http://www.metalsnews.com/Metals+News/MetalsNews/Dr.+Allen+Alper,+PhD+Economic+Geology+and+Petrology,+Columbia+University,+NYC,+USA/FEATURED1353150/i80+Gold+Corp+(TSX+IAU)+Newest+Gold+Producer+in+the+Market+a+NevadaFocused+Mining+Company+Goal+of+Achieving+Mid.htm
About i-80 Gold Corp.
i-80 Gold Corp. is a Nevada-focused mining company with a goal of achieving mid-tier gold producer status. In addition to its producing mine, El Nino at South Arturo, i-80 is beginning to plan for future production growth through the potential addition of the Phases 1 & 3 projects at South Arturo and advancing the development of the Company’s Getchell and McCoy-Cove Projects.
Qualified Person
Tim George, PE, Manager of Engineering Services, is the Qualified Person
for the information contained in this press release and is a Qualified
Person within the meaning of National Instrument 43-101.
The primary assay laboratories for the South Arturo Mine are ALS
Minerals and American Assay Labs in Reno, Nevada. For a complete
description of sample preparation, analytical methods and QA/QC
procedures, refer to the technical report dated January 25, 2021
(effective date December 1, 2020), titled “Preliminary Feasibility
Study for the South Arturo Mine, Elko County, NV” located on i-80’s
website
https://i80gold.com
and at www.sedar.com.
Abbreviations used in this press release are available by following this link (click here).
https://i80gold.com/investors/#presentation
For further information, please contact:
Ewan Downie, CEO
1.888.346.1390
Info@i80gold.com
http://www.i80gold.com
https://i80gold.com/south-arturo/
In GOD We Trust - Real Money -
https://www.kitco.com/images/live/silver.gif?0.8344882022363285
http://www.kitconet.com/images/live/au0001wb.gif
Gold & Silver is the only REAL Legal Tender -
by The Founding Fathers for your -
Rights, Liberty and Freedom -
http://www.biblebelievers.org.au/monie.htm
God Bless America
Ps.
opinion appreciated
TIA
NYBob
3年前
i-80 Gold Initiates Underground Test Mining Program at Granite Creek, Nevada
T.IAU i-80 held a 40% interest in the South Arturo Property in partnership with
Nevada Gold Mines, a joint venture between Barrick Gold Corporation and
Newmont Corporation, that owned the remaining 60% interest.
$The South Arturo Mine in Nevada; a joint venture was operated by Nevada Gold Mines LLC, with Barrick Gold Corporation (“Barrick”).
RENO, Nev., Sept.14, 2021 /PRNewswire/ - i-80 GOLD CORP. (TSX: IAU) (OTCQX: IAUCF) ("i-80", or the "Company") is pleased to announce that initial rehabilitation of the underground workings has been completed at the Company's Granite Creek Mine ("Granite Creek" or "the Property") property located in Humboldt County, Nevada and an underground test mining program is now underway.
Granite Creek hosts both open pit and underground resources and is located proximal to Nevada Gold Mines' ("NGM") Twin Creeks and Turquoise Ridge mines at the north end of the Battle Mountain-Eureka Trend at its intersection with the Getchell gold belt in Nevada. The underground deposit at Granite Creek represents one of the highest-grade gold deposits in North America with resource grades in excess of 10 grams per tonne gold (see Table 1 below).
$I-80 TO ACQUIRE LONE TREE/PROCESSING FACILITIES, BUFFALO MTN & RUBY HILL TO CREATE NEVADA MINING COMPLEX
$I-80 TO ACQUIRE LONE TREE/PROCESSING FACILITIES, BUFFALO MTN & RUBY HILL TO CREATE NEVADA MINING COMPLEX
https://www.i80gold.com/
Conference Call Replay
A recording of the call can be accessed until September 14, 2021.
North American Toll-free Replay: 1-888-203-1112
Replay Code: 8375917
https://www.i80gold.com/i-80-to-acquire-lone-tree-processing-facilities-buffalo-mtn-ruby-hill-to-create-nevada-mining-complex/
$I-80 GOLD INTERSECTS HIGH-GRADE GOLD IN OPEN PIT DRILLING AT GRANITE CREEK
6.80 g/t Au over 51.1 Metres – Oxide Mineralization below CX-Pit
Reno, Nevada, August 30, 2021 – i-80 GOLD CORP. (TSX:IAU) (OTCQX:IAUCF)
(“i-80”, or the “Company”) is pleased to announce that assay results
for the first hole drilled at the Company’s Granite Creek Property
(“Granite Creek” or “the Property”) located in Humboldt County, Nevada
has returned high-grade results that confirm the high-grade open pit
opportunity.
Hole iGM21-01, drilled from the bottom of the historic CX-Pit
intersected two zones of mineralization grading
3.17 g/t Au over 7.5 m and
6.80 g/t Au over 51.1 m (see Table 1).
The hole was drilled for metallurgical purposes into the main structure
below the pit (true widths unknown) and returned exceptional grades
that appear to be oxide mineralization based on an average cyanide
soluble to fire assay ratio of 0.94 over both intervals.
The surface drill program targeting open pit mineralization at Granite
Creek is complete (see Figure 2 below) and multiple assays remain
pending.
The drill program was focused on intersecting material to be used for
metallurgical and geotechnical purposes in advance of initiating
permitting for an open pit mine and on-site processing.
https://www.i80gold.com/i-80-gold-intersects-high-grade-gold-in-open-pit-drilling-at-granite-creek/
$SOUTH ARTURO GOLD MINE: Located along the northern section of the
productive Carlin Trend,
i-80 holds a 40% interest in the South Arturo Property in partnership with
Nevada Gold Mines, a joint venture between Barrick Gold Corporation and
Newmont Corporation, that owns the remaining 60% interest.
$The South Arturo Mine in Nevada is a joint venture, operated by Nevada Gold Mines LLC, with Barrick Gold Corporation (“Barrick”).
Several opportunities exist on the property including the recently
developed El Nino underground mine.
El Nino is the second mine to be developed at South Arturo and as with
the Phase 2 open pit it has delivered consistent results.
visit our website at
http://www.i80gold.com
Replay Code: 3652970
https://www.i80gold.com/i-80-gold-to-announce-second-quarter-financial-results-on-august-11-2021/
About i-80 Gold Corp.
i-80 Gold Corp is a Nevada-focused mining company aimed on achieving
mid-tier gold producer status through the development of the Company’s
advanced-stage project portfolio.
In addition to its producing mine, El Nino at South Arturo,
i-80 is advancing economic studies and test mining at
the Granite Creek Project, and planning for advanced
underground exploration at the McCoy-Cove Property.
For further information, please contact:
Ewan Downie – CEO
Matthew Gollat – EVP Business & Corporate Development
1.866.525.6450
Info@i80gold.com
http://www.i80gold.com
$i-80 Gold is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
$i-80 Gold Corp. (TSX: IAU): Newest Gold Producer in the Market. a Nevada-
Focused Mining Company, Goal of Achieving Mid-Tier Gold Producer Status;
Ewan Downie, CEO Interviewed
By Dr. Allen Alper, PhD Economic Geology and Petrology, Columbia
University, NYC, USA
on 4/25/2021
We spoke with Ewan Downie, CEO and Director of i-80 Gold Corp. (TSX: IAU),
the newest gold producer in the market. i-80 Gold Corp is a Nevada-focused
mining company, with a goal of achieving mid-tier gold producer status.
$The Company is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
The Company is also advancing the development of its 100% owned,
feasibility-stage McCoy-Cove projects, located proximal
to Nevada Gold Mines’ Phoenix operation, and
its past producing Getchell project that is located immediately
south of Nevada Gold Mines’ Turquoise Ridge operation.
The PEA of the Getchell project is expected to be completed in H1 2021,
followed by the commissioning of a Preliminary Feasibility or
Feasibility Study, immediately after.
http://www.metalsnews.com/Metals+News/MetalsNews/Dr.+Allen+Alper,+PhD+Economic+Geology+and+Petrology,+Columbia+University,+NYC,+USA/FEATURED1353150/i80+Gold+Corp+(TSX+IAU)+Newest+Gold+Producer+in+the+Market+a+NevadaFocused+Mining+Company+Goal+of+Achieving+Mid.htm
About i-80 Gold Corp.
i-80 Gold Corp. is a Nevada-focused mining company with a goal of achieving mid-tier gold producer status. In addition to its producing mine, El Nino at South Arturo, i-80 is beginning to plan for future production growth through the potential addition of the Phases 1 & 3 projects at South Arturo and advancing the development of the Company’s Getchell and McCoy-Cove Projects.
Qualified Person
Tim George, PE, Manager of Engineering Services, is the Qualified Person
for the information contained in this press release and is a Qualified
Person within the meaning of National Instrument 43-101.
The primary assay laboratories for the South Arturo Mine are ALS
Minerals and American Assay Labs in Reno, Nevada. For a complete
description of sample preparation, analytical methods and QA/QC
procedures, refer to the technical report dated January 25, 2021
(effective date December 1, 2020), titled “Preliminary Feasibility
Study for the South Arturo Mine, Elko County, NV” located on i-80’s
website
https://i80gold.com
and at www.sedar.com.
Abbreviations used in this press release are available by following this link (click here).
https://i80gold.com/investors/#presentation
For further information, please contact:
Ewan Downie, CEO
1.888.346.1390
Info@i80gold.com
http://www.i80gold.com
https://i80gold.com/south-arturo/
In GOD We Trust - Real Money -
https://www.kitco.com/images/live/silver.gif?0.8344882022363285
http://www.kitconet.com/images/live/au0001wb.gif
Gold & Silver is the only REAL Legal Tender -
by The Founding Fathers for your -
Rights, Liberty and Freedom -
http://www.biblebelievers.org.au/monie.htm
God Bless America
Ps.
opinion appreciated
TIA
NYBob
3年前
$Japan Gold Provides Update on Barrick Alliance Activities
V.JG |
Japan Gold (TSXV:JG) intersects high-grade veins in first drill holes at the Ryuo Prospect
Mining
TSXV:JG $70.84M
Julia Kennedy
julia.kennedy@themarketherald.ca
14 September 2021 11:15 (EDT)
Japan Gold Corp. (JG) has received initial results from its drill program at the Ryuo Prospect, located within the Ikutahara Project in Japan
Highlights from the scout holes include 12.1 g/t gold over 4.9 metres, including 125.0 g/t gold over 0.25 metres
The company plans to complete up to five additional drill holes at the Ryuo Prospect by the end of November
Japan Gold Corp. is a Canadian mineral exploration company focused solely on gold exploration across the three largest islands of Japan
Japan Gold Corp. (JG) is currently up 3.08 per cent, trading at $0.335 per share
Japan Gold Corp. (JG) has received initial results from its drill program at the Ryuo Prospect, located within the Ikutahara Project in Japan.
The Ryuo Prospect hosts five areas of workings along an open trend of alteration and mineralization.
Japan Gold drilled three scout holes totalling 828.3 metres between May and July 2021. Highlights from the scout holes include 12.1 g/t gold over 4.9 metres, including 125.0 g/t gold over 0.25 metres.
Andrew Rowe, Japan Gold’s VP of Exploration, commented on the results.
“The initial drill holes at Ryuo have confirmed wide, high-grade vein mineralization is continuous below the historical workings closed in 1943,” he said. “The Ryuo prospect has never been drilled and these initial results provide strong encouragement to continue drilling at Ryuo, and the other similarly under-explored Ikutahara prospects.”
On September 6, the company recommenced drilling to test the lateral strike extensions of the drill intercept at the Jinja Vein. A second drill rig is targeting a vertical anomaly that lies below the Taisei workings.
The company plans to complete up to five additional drill holes at the Ryuo Prospect by the end of November.
Japan Gold Corp. is a Canadian mineral exploration company focused solely on gold exploration across the three largest islands of Japan: Hokkaido, Honshu and Kyushu.
The company has a country-wide alliance with Barrick Gold Corporation to jointly explore, develop and mine certain gold mineral properties and mining projects.
The Ikutahara Project is wholly owned by Japan Gold and is not included in the Barrick Alliance.
Japan Gold Corp. (JG) is currently up 3.08 per cent, trading at $0.335 per share as of 9:47 am ET.
Latest News
Japan Gold Intersects High-Grade Veins in First Drill Holes at the Ryuo Prospect
Newsfile 1 day ago
Japan Gold Appoints Dr Tim Sharp as Chief Geologist
Newsfile 1 week ago
Japan Gold Expands the Togi Project Following High-Grade Results from the Barrick Alliance Work Program
Newsfile August 4, 2021
https://investorshub.advfn.com/boards/read_msg.aspx?message_id=163480455
https://themarketherald.ca/japan-gold-intersects-high-grade-veins-in-first-drill-holes-at-the-ryuo-prospect-2021-09-14/?utm_source=stockhouse.com&utm_medium=widget&utm_campaign=stockhouse.com%7Cwebpart_news%7Cquote_tab
NYBob
3年前
$SOUTH ARTURO GOLD MINE: Located along the northern section of the
productive Carlin Trend,
i-80 holds a 40% interest in the South Arturo Property in partnership with
Nevada Gold Mines, a joint venture between Barrick Gold Corporation and
Newmont Corporation, that owns the remaining 60% interest.
$The South Arturo Mine in Nevada is a joint venture, operated by Nevada Gold Mines LLC, with Barrick Gold Corporation (“Barrick”).
Several opportunities exist on the property including the recently
developed El Nino underground mine.
El Nino is the second mine to be developed at South Arturo and as with
the Phase 2 open pit it has delivered consistent results.
$I-80 GOLD INTERSECTS HIGH-GRADE GOLD IN OPEN PIT DRILLING AT GRANITE CREEK
6.80 g/t Au over 51.1 Metres – Oxide Mineralization below CX-Pit
Reno, Nevada, August 30, 2021 – i-80 GOLD CORP. (TSX:IAU) (OTCQX:IAUCF)
(“i-80”, or the “Company”) is pleased to announce that assay results
for the first hole drilled at the Company’s Granite Creek Property
(“Granite Creek” or “the Property”) located in Humboldt County, Nevada
has returned high-grade results that confirm the high-grade open pit
opportunity.
Hole iGM21-01, drilled from the bottom of the historic CX-Pit
intersected two zones of mineralization grading
3.17 g/t Au over 7.5 m and
6.80 g/t Au over 51.1 m (see Table 1).
The hole was drilled for metallurgical purposes into the main structure
below the pit (true widths unknown) and returned exceptional grades
that appear to be oxide mineralization based on an average cyanide
soluble to fire assay ratio of 0.94 over both intervals.
The surface drill program targeting open pit mineralization at Granite
Creek is complete (see Figure 2 below) and multiple assays remain
pending.
The drill program was focused on intersecting material to be used for
metallurgical and geotechnical purposes in advance of initiating
permitting for an open pit mine and on-site processing.
https://www.i80gold.com/i-80-gold-intersects-high-grade-gold-in-open-pit-drilling-at-granite-creek/
$SOUTH ARTURO GOLD MINE: Located along the northern section of the
productive Carlin Trend,
i-80 holds a 40% interest in the South Arturo Property in partnership with
Nevada Gold Mines, a joint venture between Barrick Gold Corporation and
Newmont Corporation, that owns the remaining 60% interest.
$The South Arturo Mine in Nevada is a joint venture, operated by Nevada Gold Mines LLC, with Barrick Gold Corporation (“Barrick”).
Several opportunities exist on the property including the recently
developed El Nino underground mine.
El Nino is the second mine to be developed at South Arturo and as with
the Phase 2 open pit it has delivered consistent results.
visit our website at
http://www.i80gold.com
Replay Code: 3652970
https://www.i80gold.com/i-80-gold-to-announce-second-quarter-financial-results-on-august-11-2021/
About i-80 Gold Corp.
i-80 Gold Corp is a Nevada-focused mining company aimed on achieving
mid-tier gold producer status through the development of the Company’s
advanced-stage project portfolio.
In addition to its producing mine, El Nino at South Arturo,
i-80 is advancing economic studies and test mining at
the Granite Creek Project, and planning for advanced
underground exploration at the McCoy-Cove Property.
For further information, please contact:
Ewan Downie – CEO
Matthew Gollat – EVP Business & Corporate Development
1.866.525.6450
Info@i80gold.com
http://www.i80gold.com
$i-80 Gold is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
$i-80 Gold Corp. (TSX: IAU): Newest Gold Producer in the Market. a Nevada-
Focused Mining Company, Goal of Achieving Mid-Tier Gold Producer Status;
Ewan Downie, CEO Interviewed
By Dr. Allen Alper, PhD Economic Geology and Petrology, Columbia
University, NYC, USA
on 4/25/2021
We spoke with Ewan Downie, CEO and Director of i-80 Gold Corp. (TSX: IAU),
the newest gold producer in the market. i-80 Gold Corp is a Nevada-focused
mining company, with a goal of achieving mid-tier gold producer status.
$The Company is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
The Company is also advancing the development of its 100% owned,
feasibility-stage McCoy-Cove projects, located proximal
to Nevada Gold Mines’ Phoenix operation, and
its past producing Getchell project that is located immediately
south of Nevada Gold Mines’ Turquoise Ridge operation.
The PEA of the Getchell project is expected to be completed in H1 2021,
followed by the commissioning of a Preliminary Feasibility or
Feasibility Study, immediately after.
http://www.metalsnews.com/Metals+News/MetalsNews/Dr.+Allen+Alper,+PhD+Economic+Geology+and+Petrology,+Columbia+University,+NYC,+USA/FEATURED1353150/i80+Gold+Corp+(TSX+IAU)+Newest+Gold+Producer+in+the+Market+a+NevadaFocused+Mining+Company+Goal+of+Achieving+Mid.htm
About i-80 Gold Corp.
i-80 Gold Corp. is a Nevada-focused mining company with a goal of achieving mid-tier gold producer status. In addition to its producing mine, El Nino at South Arturo, i-80 is beginning to plan for future production growth through the potential addition of the Phases 1 & 3 projects at South Arturo and advancing the development of the Company’s Getchell and McCoy-Cove Projects.
Qualified Person
Tim George, PE, Manager of Engineering Services, is the Qualified Person
for the information contained in this press release and is a Qualified
Person within the meaning of National Instrument 43-101.
The primary assay laboratories for the South Arturo Mine are ALS
Minerals and American Assay Labs in Reno, Nevada. For a complete
description of sample preparation, analytical methods and QA/QC
procedures, refer to the technical report dated January 25, 2021
(effective date December 1, 2020), titled “Preliminary Feasibility
Study for the South Arturo Mine, Elko County, NV” located on i-80’s
website
https://i80gold.com
and at www.sedar.com.
Abbreviations used in this press release are available by following this link (click here).
https://i80gold.com/investors/#presentation
For further information, please contact:
Ewan Downie, CEO
1.888.346.1390
Info@i80gold.com
http://www.i80gold.com
https://i80gold.com/south-arturo/
In GOD We Trust - Real Money -
https://www.kitco.com/images/live/silver.gif?0.8344882022363285
http://www.kitconet.com/images/live/au0001wb.gif
Gold & Silver is the only REAL Legal Tender -
by The Founding Fathers for your -
Rights, Liberty and Freedom -
http://www.biblebelievers.org.au/monie.htm
God Bless America
Ps.
opinion appreciated
TIA
NYBob
3年前
$I-80 GOLD INTERSECTS HIGH-GRADE GOLD IN OPEN PIT DRILLING AT GRANITE CREEK
6.80 g/t Au over 51.1 Metres – Oxide Mineralization below CX-Pit
Reno, Nevada, August 30, 2021 – i-80 GOLD CORP. (TSX:IAU) (OTCQX:IAUCF)
(“i-80”, or the “Company”) is pleased to announce that assay results
for the first hole drilled at the Company’s Granite Creek Property
(“Granite Creek” or “the Property”) located in Humboldt County, Nevada
has returned high-grade results that confirm the high-grade open pit
opportunity.
Hole iGM21-01, drilled from the bottom of the historic CX-Pit
intersected two zones of mineralization grading
3.17 g/t Au over 7.5 m and
6.80 g/t Au over 51.1 m (see Table 1).
The hole was drilled for metallurgical purposes into the main structure
below the pit (true widths unknown) and returned exceptional grades
that appear to be oxide mineralization based on an average cyanide
soluble to fire assay ratio of 0.94 over both intervals.
The surface drill program targeting open pit mineralization at Granite
Creek is complete (see Figure 2 below) and multiple assays remain
pending.
The drill program was focused on intersecting material to be used for
metallurgical and geotechnical purposes in advance of initiating
permitting for an open pit mine and on-site processing.
https://www.i80gold.com/i-80-gold-intersects-high-grade-gold-in-open-pit-drilling-at-granite-creek/
$SOUTH ARTURO GOLD MINE: Located along the northern section of the
productive Carlin Trend,
i-80 holds a 40% interest in the South Arturo Property in partnership with
Nevada Gold Mines, a joint venture between Barrick Gold Corporation and
Newmont Corporation, that owns the remaining 60% interest.
$The South Arturo Mine in Nevada is a joint venture, operated by Nevada Gold Mines LLC, with Barrick Gold Corporation (“Barrick”).
Several opportunities exist on the property including the recently
developed El Nino underground mine.
El Nino is the second mine to be developed at South Arturo and as with
the Phase 2 open pit it has delivered consistent results.
visit our website at
http://www.i80gold.com
Replay Code: 3652970
https://www.i80gold.com/i-80-gold-to-announce-second-quarter-financial-results-on-august-11-2021/
About i-80 Gold Corp.
i-80 Gold Corp is a Nevada-focused mining company aimed on achieving
mid-tier gold producer status through the development of the Company’s
advanced-stage project portfolio.
In addition to its producing mine, El Nino at South Arturo,
i-80 is advancing economic studies and test mining at
the Granite Creek Project, and planning for advanced
underground exploration at the McCoy-Cove Property.
For further information, please contact:
Ewan Downie – CEO
Matthew Gollat – EVP Business & Corporate Development
1.866.525.6450
Info@i80gold.com
http://www.i80gold.com
$i-80 Gold is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
$i-80 Gold Corp. (TSX: IAU): Newest Gold Producer in the Market. a Nevada-
Focused Mining Company, Goal of Achieving Mid-Tier Gold Producer Status;
Ewan Downie, CEO Interviewed
By Dr. Allen Alper, PhD Economic Geology and Petrology, Columbia
University, NYC, USA
on 4/25/2021
We spoke with Ewan Downie, CEO and Director of i-80 Gold Corp. (TSX: IAU),
the newest gold producer in the market. i-80 Gold Corp is a Nevada-focused
mining company, with a goal of achieving mid-tier gold producer status.
$The Company is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
The Company is also advancing the development of its 100% owned,
feasibility-stage McCoy-Cove projects, located proximal
to Nevada Gold Mines’ Phoenix operation, and
its past producing Getchell project that is located immediately
south of Nevada Gold Mines’ Turquoise Ridge operation.
The PEA of the Getchell project is expected to be completed in H1 2021,
followed by the commissioning of a Preliminary Feasibility or
Feasibility Study, immediately after.
http://www.metalsnews.com/Metals+News/MetalsNews/Dr.+Allen+Alper,+PhD+Economic+Geology+and+Petrology,+Columbia+University,+NYC,+USA/FEATURED1353150/i80+Gold+Corp+(TSX+IAU)+Newest+Gold+Producer+in+the+Market+a+NevadaFocused+Mining+Company+Goal+of+Achieving+Mid.htm
About i-80 Gold Corp.
i-80 Gold Corp. is a Nevada-focused mining company with a goal of achieving mid-tier gold producer status. In addition to its producing mine, El Nino at South Arturo, i-80 is beginning to plan for future production growth through the potential addition of the Phases 1 & 3 projects at South Arturo and advancing the development of the Company’s Getchell and McCoy-Cove Projects.
Qualified Person
Tim George, PE, Manager of Engineering Services, is the Qualified Person
for the information contained in this press release and is a Qualified
Person within the meaning of National Instrument 43-101.
The primary assay laboratories for the South Arturo Mine are ALS
Minerals and American Assay Labs in Reno, Nevada. For a complete
description of sample preparation, analytical methods and QA/QC
procedures, refer to the technical report dated January 25, 2021
(effective date December 1, 2020), titled “Preliminary Feasibility
Study for the South Arturo Mine, Elko County, NV” located on i-80’s
website
https://i80gold.com
and at www.sedar.com.
Abbreviations used in this press release are available by following this link (click here).
https://i80gold.com/investors/#presentation
For further information, please contact:
Ewan Downie, CEO
1.888.346.1390
Info@i80gold.com
http://www.i80gold.com
https://i80gold.com/south-arturo/
In GOD We Trust - Real Money -
https://www.kitco.com/images/live/silver.gif?0.8344882022363285
http://www.kitconet.com/images/live/au0001wb.gif
Gold & Silver is the only REAL Legal Tender -
by The Founding Fathers for your -
Rights, Liberty and Freedom -
http://www.biblebelievers.org.au/monie.htm
God Bless America
Ps.
opinion appreciated
TIA
NYBob
3年前
$SOUTH ARTURO GOLD MINE: Located along the northern section of the
productive Carlin Trend,
i-80 holds a 40% interest in the South Arturo Property in partnership with
Nevada Gold Mines, a joint venture between Barrick Gold Corporation and
Newmont Corporation, that owns the remaining 60% interest.
$The South Arturo Mine in Nevada is a joint venture, operated by Nevada Gold Mines LLC, with Barrick Gold Corporation (“Barrick”).
Several opportunities exist on the property including the recently
developed El Nino underground mine.
El Nino is the second mine to be developed at South Arturo and as with
the Phase 2 open pit it has delivered consistent results.
Second Quarter Financial Results Webcast
The Company will host a live conference call and webcast on August 11, 2021, commencing at 10:00 am ET, providing the opportunity for analysts and investors to ask questions of i-80 Gold’s executive team.
Conference Call
North American Toll-free: 1-866-248-8441
Webcast Link
Click HERE to access the webcast or visit our website at
http://www.i80gold.com
Replay Code: 3652970
https://www.i80gold.com/i-80-gold-to-announce-second-quarter-financial-results-on-august-11-2021/
About i-80 Gold Corp.
i-80 Gold Corp is a Nevada-focused mining company aimed on achieving
mid-tier gold producer status through the development of the Company’s
advanced-stage project portfolio.
In addition to its producing mine, El Nino at South Arturo,
i-80 is advancing economic studies and test mining at
the Granite Creek Project, and planning for advanced
underground exploration at the McCoy-Cove Property.
For further information, please contact:
Ewan Downie – CEO
Matthew Gollat – EVP Business & Corporate Development
1.866.525.6450
Info@i80gold.com
http://www.i80gold.com
$i-80 Gold is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
$i-80 Gold Corp. (TSX: IAU): Newest Gold Producer in the Market. a Nevada-
Focused Mining Company, Goal of Achieving Mid-Tier Gold Producer Status;
Ewan Downie, CEO Interviewed
By Dr. Allen Alper, PhD Economic Geology and Petrology, Columbia
University, NYC, USA
on 4/25/2021
We spoke with Ewan Downie, CEO and Director of i-80 Gold Corp. (TSX: IAU),
the newest gold producer in the market. i-80 Gold Corp is a Nevada-focused
mining company, with a goal of achieving mid-tier gold producer status.
$The Company is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
The Company is also advancing the development of its 100% owned,
feasibility-stage McCoy-Cove projects, located proximal
to Nevada Gold Mines’ Phoenix operation, and
its past producing Getchell project that is located immediately
south of Nevada Gold Mines’ Turquoise Ridge operation.
The PEA of the Getchell project is expected to be completed in H1 2021,
followed by the commissioning of a Preliminary Feasibility or
Feasibility Study, immediately after.
http://www.metalsnews.com/Metals+News/MetalsNews/Dr.+Allen+Alper,+PhD+Economic+Geology+and+Petrology,+Columbia+University,+NYC,+USA/FEATURED1353150/i80+Gold+Corp+(TSX+IAU)+Newest+Gold+Producer+in+the+Market+a+NevadaFocused+Mining+Company+Goal+of+Achieving+Mid.htm
About i-80 Gold Corp.
i-80 Gold Corp. is a Nevada-focused mining company with a goal of achieving mid-tier gold producer status. In addition to its producing mine, El Nino at South Arturo, i-80 is beginning to plan for future production growth through the potential addition of the Phases 1 & 3 projects at South Arturo and advancing the development of the Company’s Getchell and McCoy-Cove Projects.
Qualified Person
Tim George, PE, Manager of Engineering Services, is the Qualified Person
for the information contained in this press release and is a Qualified
Person within the meaning of National Instrument 43-101.
The primary assay laboratories for the South Arturo Mine are ALS
Minerals and American Assay Labs in Reno, Nevada. For a complete
description of sample preparation, analytical methods and QA/QC
procedures, refer to the technical report dated January 25, 2021
(effective date December 1, 2020), titled “Preliminary Feasibility
Study for the South Arturo Mine, Elko County, NV” located on i-80’s
website
https://i80gold.com
and at www.sedar.com.
Abbreviations used in this press release are available by following this link (click here).
https://i80gold.com/investors/#presentation
For further information, please contact:
Ewan Downie, CEO
1.888.346.1390
Info@i80gold.com
http://www.i80gold.com
https://i80gold.com/south-arturo/
In GOD We Trust - Real Money -
https://www.kitco.com/images/live/silver.gif?0.8344882022363285
http://www.kitconet.com/images/live/au0001wb.gif
Gold & Silver is the only REAL Legal Tender -
by The Founding Fathers for your -
Rights, Liberty and Freedom -
http://www.biblebelievers.org.au/monie.htm
God Bless America
Ps.
opinion appreciated
TIA
NYBob
3年前
I-80 Gold Corp is joint venture partner with ABX @ Nevada Gold;
$i-80 GOLD CORP. (TSX:IAU) (IAUCF:OTC) (“i-80”, or the “Company) will
announce its unaudited financial and operating results for the three
and six months ended June 30, 2021 before market open
Wednesday, August 11, 2021.
The Company will host a live conference call and webcast on that same
day, commencing at 10:00 am ET, providing the opportunity for analysts
and investors to ask questions of i-80 Gold’s executive team.
Reno, Nevada, July 29, 2021 –
Conference Call
North American Toll-free: 1-866-248-8441
Webcast Link
Click HERE to access the webcast or visit our website at
http://www.i80gold.com
Conference Call Replay
A recording of the call can be accessed until August 18, 2021.
North American Toll-free Replay: 1-888-203-1112
Replay Code: 3652970
https://www.i80gold.com/i-80-gold-to-announce-second-quarter-financial-results-on-august-11-2021/
About i-80 Gold Corp.
i-80 Gold Corp is a Nevada-focused mining company aimed on achieving
mid-tier gold producer status through the development of the Company’s
advanced-stage project portfolio.
In addition to its producing mine, El Nino at South Arturo,
i-80 is advancing economic studies and test mining at
the Granite Creek Project, and planning for advanced
underground exploration at the McCoy-Cove Property.
For further information, please contact:
Ewan Downie – CEO
Matthew Gollat – EVP Business & Corporate Development
1.866.525.6450
Info@i80gold.com
http://www.i80gold.com
$i-80 Gold is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
$i-80 Gold Corp. (TSX: IAU): Newest Gold Producer in the Market. a Nevada-
Focused Mining Company, Goal of Achieving Mid-Tier Gold Producer Status;
Ewan Downie, CEO Interviewed
By Dr. Allen Alper, PhD Economic Geology and Petrology, Columbia
University, NYC, USA
on 4/25/2021
We spoke with Ewan Downie, CEO and Director of i-80 Gold Corp. (TSX: IAU),
the newest gold producer in the market. i-80 Gold Corp is a Nevada-focused
mining company, with a goal of achieving mid-tier gold producer status.
$The Company is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
The Company is also advancing the development of its 100% owned,
feasibility-stage McCoy-Cove projects, located proximal
to Nevada Gold Mines’ Phoenix operation, and
its past producing Getchell project that is located immediately
south of Nevada Gold Mines’ Turquoise Ridge operation.
The PEA of the Getchell project is expected to be completed in H1 2021,
followed by the commissioning of a Preliminary Feasibility or
Feasibility Study, immediately after.
http://www.metalsnews.com/Metals+News/MetalsNews/Dr.+Allen+Alper,+PhD+Economic+Geology+and+Petrology,+Columbia+University,+NYC,+USA/FEATURED1353150/i80+Gold+Corp+(TSX+IAU)+Newest+Gold+Producer+in+the+Market+a+NevadaFocused+Mining+Company+Goal+of+Achieving+Mid.htm
About i-80 Gold Corp.
i-80 Gold Corp. is a Nevada-focused mining company with a goal of achieving mid-tier gold producer status. In addition to its producing mine, El Nino at South Arturo, i-80 is beginning to plan for future production growth through the potential addition of the Phases 1 & 3 projects at South Arturo and advancing the development of the Company’s Getchell and McCoy-Cove Projects.
Qualified Person
Tim George, PE, Manager of Engineering Services, is the Qualified Person
for the information contained in this press release and is a Qualified
Person within the meaning of National Instrument 43-101.
The primary assay laboratories for the South Arturo Mine are ALS
Minerals and American Assay Labs in Reno, Nevada. For a complete
description of sample preparation, analytical methods and QA/QC
procedures, refer to the technical report dated January 25, 2021
(effective date December 1, 2020), titled “Preliminary Feasibility
Study for the South Arturo Mine, Elko County, NV” located on i-80’s
website
https://i80gold.com
and at www.sedar.com.
Abbreviations used in this press release are available by following this link (click here).
https://i80gold.com/investors/#presentation
For further information, please contact:
Ewan Downie, CEO
1.888.346.1390
Info@i80gold.com
http://www.i80gold.com
https://i80gold.com/south-arturo/
In GOD We Trust - Real Money -
https://www.kitco.com/images/live/silver.gif?0.8344882022363285
http://www.kitconet.com/images/live/au0001wb.gif
Gold & Silver is the only REAL Legal Tender -
by The Founding Fathers for your -
Rights, Liberty and Freedom -
http://www.biblebelievers.org.au/monie.htm
God Bless America
Ps.
opinion appreciated
TIA
NYBob
3年前
$Monroe1 thank; BTV New Listing Alert Video: i-80 Gold Corp. - Nevada's Newest Gold Producer
T.IAU | 21 hours ago
Vancouver, British Columbia--(Newsfile Corp. - June 28, 2021) -
i-80 Gold Corp. (TSX: IAU) - The Nevada-focused mining companyis
pleased to be listed on the Toronto Stock Exchange under the symbol
IAU.
If you cannot view the video above, please visit:
https://b-tv.com/i-80-gold-nevadas-newest-gold-producer-new-listing-alert-30sec/.
i-80 Gold is being featured on BNN Bloomberg on Jun 29th to July 12th, 2021.
i-80 Gold Corp.
http://www.i80gold.com
$i-80 Gold is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
$i-80 Gold Corp. (TSX: IAU): Newest Gold Producer in the Market. a Nevada-
Focused Mining Company, Goal of Achieving Mid-Tier Gold Producer Status;
Ewan Downie, CEO Interviewed
By Dr. Allen Alper, PhD Economic Geology and Petrology, Columbia
University, NYC, USA
on 4/25/2021
We spoke with Ewan Downie, CEO and Director of i-80 Gold Corp. (TSX: IAU),
the newest gold producer in the market. i-80 Gold Corp is a Nevada-focused
mining company, with a goal of achieving mid-tier gold producer status.
$The Company is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
The Company is also advancing the development of its 100% owned,
feasibility-stage McCoy-Cove projects, located proximal
to Nevada Gold Mines’ Phoenix operation, and
its past producing Getchell project that is located immediately
south of Nevada Gold Mines’ Turquoise Ridge operation.
The PEA of the Getchell project is expected to be completed in H1 2021,
followed by the commissioning of a Preliminary Feasibility or
Feasibility Study, immediately after.
http://www.metalsnews.com/Metals+News/MetalsNews/Dr.+Allen+Alper,+PhD+Economic+Geology+and+Petrology,+Columbia+University,+NYC,+USA/FEATURED1353150/i80+Gold+Corp+(TSX+IAU)+Newest+Gold+Producer+in+the+Market+a+NevadaFocused+Mining+Company+Goal+of+Achieving+Mid.htm
About i-80 Gold Corp.
i-80 Gold Corp. is a Nevada-focused mining company with a goal of achieving mid-tier gold producer status. In addition to its producing mine, El Nino at South Arturo, i-80 is beginning to plan for future production growth through the potential addition of the Phases 1 & 3 projects at South Arturo and advancing the development of the Company’s Getchell and McCoy-Cove Projects.
Qualified Person
Tim George, PE, Manager of Engineering Services, is the Qualified Person
for the information contained in this press release and is a Qualified
Person within the meaning of National Instrument 43-101.
The primary assay laboratories for the South Arturo Mine are ALS
Minerals and American Assay Labs in Reno, Nevada. For a complete
description of sample preparation, analytical methods and QA/QC
procedures, refer to the technical report dated January 25, 2021
(effective date December 1, 2020), titled “Preliminary Feasibility
Study for the South Arturo Mine, Elko County, NV” located on i-80’s
website
https://i80gold.com
and at www.sedar.com.
Abbreviations used in this press release are available by following this link (click here).
https://i80gold.com/investors/#presentation
For further information, please contact:
Ewan Downie, CEO
1.888.346.1390
Info@i80gold.com
http://www.i80gold.com
https://i80gold.com/south-arturo/
In GOD We Trust - Real Money -
https://www.kitco.com/images/live/silver.gif?0.8344882022363285
http://www.kitconet.com/images/live/au0001wb.gif
Gold & Silver is the only REAL Legal Tender -
by The Founding Fathers for your -
Rights, Liberty and Freedom -
http://www.biblebelievers.org.au/monie.htm
God Bless America
Ps.
opinion appreciated
TIA
NYBob
3年前
$i-80 Gold is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
$i-80 Gold Corp. (TSX: IAU): Newest Gold Producer in the Market. a Nevada-
Focused Mining Company, Goal of Achieving Mid-Tier Gold Producer Status;
Ewan Downie, CEO Interviewed
By Dr. Allen Alper, PhD Economic Geology and Petrology, Columbia
University, NYC, USA
on 4/25/2021
We spoke with Ewan Downie, CEO and Director of i-80 Gold Corp. (TSX: IAU),
the newest gold producer in the market. i-80 Gold Corp is a Nevada-focused
mining company, with a goal of achieving mid-tier gold producer status.
$The Company is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
The Company is also advancing the development of its 100% owned,
feasibility-stage McCoy-Cove projects, located proximal
to Nevada Gold Mines’ Phoenix operation, and
its past producing Getchell project that is located immediately
south of Nevada Gold Mines’ Turquoise Ridge operation.
The PEA of the Getchell project is expected to be completed in H1 2021,
followed by the commissioning of a Preliminary Feasibility or
Feasibility Study, immediately after.
http://www.metalsnews.com/Metals+News/MetalsNews/Dr.+Allen+Alper,+PhD+Economic+Geology+and+Petrology,+Columbia+University,+NYC,+USA/FEATURED1353150/i80+Gold+Corp+(TSX+IAU)+Newest+Gold+Producer+in+the+Market+a+NevadaFocused+Mining+Company+Goal+of+Achieving+Mid.htm
About i-80 Gold Corp.
i-80 Gold Corp. is a Nevada-focused mining company with a goal of achieving mid-tier gold producer status. In addition to its producing mine, El Nino at South Arturo, i-80 is beginning to plan for future production growth through the potential addition of the Phases 1 & 3 projects at South Arturo and advancing the development of the Company’s Getchell and McCoy-Cove Projects.
Qualified Person
Tim George, PE, Manager of Engineering Services, is the Qualified Person
for the information contained in this press release and is a Qualified
Person within the meaning of National Instrument 43-101.
The primary assay laboratories for the South Arturo Mine are ALS
Minerals and American Assay Labs in Reno, Nevada. For a complete
description of sample preparation, analytical methods and QA/QC
procedures, refer to the technical report dated January 25, 2021
(effective date December 1, 2020), titled “Preliminary Feasibility
Study for the South Arturo Mine, Elko County, NV” located on i-80’s
website
https://i80gold.com
and at www.sedar.com.
Abbreviations used in this press release are available by following this link (click here).
https://i80gold.com/investors/#presentation
For further information, please contact:
Ewan Downie, CEO
1.888.346.1390
Info@i80gold.com
http://www.i80gold.com
https://i80gold.com/south-arturo/
In GOD We Trust - Real Money -
https://www.kitco.com/images/live/silver.gif?0.8344882022363285
http://www.kitconet.com/images/live/au0001wb.gif
Gold & Silver is the only REAL Legal Tender -
by The Founding Fathers for your -
Rights, Liberty and Freedom -
http://www.biblebelievers.org.au/monie.htm
God Bless America
Ps.
opinion appreciated
TIA
NYBob
3年前
i-80 Gold Begins Underground Drill Program At Granite Creek
i-80 Gold today reported that the overhauling of underground drill bays
has been completed, and underground drilling activities have begun at
the Granite Creek property situated in Humbolt County, Nevada.
https://thedeepdive.ca/i-80-gold-begins-underground-drill-program-at-granite-creek/
i-80 Gold Begins Underground Drill Program At Granite Creek
June 16, 2021 7:49 AM Christopher Messmer 0 Comments Gold, i-80 Gold Corp
$i-80 GOLD CORP. (TSX: IAU) today reported that the overhauling of underground drill bays has been completed, and underground drilling activities have begun at the Granite Creek property situated in Humbolt County, Nevada.
Granite Creek hosts open pit and underground resources on the property. The firms 22,000 metre drill program has begun, which focuses on both surface and underground drilling. The primary objective of the current program is to advance the project to production.
Underground drilling will be focusing on the delineating of sufficient resources for the development of a near–term mining and development plan. Surface drilling meanwhile will test mineralization for open pit definition and metallurgical purposes.
I-80 also declared that the Getchell Property is to be addressed as the Granite Creek property from this point onward. The decision was made to avoid confusion with the open pit at Getchell that’s situated at the nearby Turquoise Ridge mine property.
i-80 GOLD CORP. last traded on the TSX at $2.68.
About i-80 Gold Corp.
i-80 Gold Corp. is a Nevada-focused mining company with a goal of achieving mid-tier gold producer status. In addition to its producing mine, El Nino at South Arturo, i-80 is beginning to plan for future production growth through the potential addition of the Phases 1 & 3 projects at South Arturo and advancing the development of the Company’s Getchell and McCoy-Cove Projects.
Qualified Person
Tim George, PE, Manager of Engineering Services, is the Qualified Person
for the information contained in this press release and is a Qualified
Person within the meaning of National Instrument 43-101.
The primary assay laboratories for the South Arturo Mine are ALS
Minerals and American Assay Labs in Reno, Nevada. For a complete
description of sample preparation, analytical methods and QA/QC
procedures, refer to the technical report dated January 25, 2021
(effective date December 1, 2020), titled “Preliminary Feasibility
Study for the South Arturo Mine, Elko County, NV” located on i-80’s
website
https://i80gold.com
and at www.sedar.com.
Abbreviations used in this press release are available by following this link (click here).
https://i80gold.com/investors/#presentation
For further information, please contact:
Ewan Downie, CEO
1.888.346.1390
Info@i80gold.com
http://www.i80gold.com
https://i80gold.com/south-arturo/
In GOD We Trust - Real Money -
https://www.kitco.com/images/live/silver.gif?0.8344882022363285
http://www.kitconet.com/images/live/au0001wb.gif
Gold & Silver is the only REAL Legal Tender -
by The Founding Fathers for your -
Rights, Liberty and Freedom -
http://www.biblebelievers.org.au/monie.htm
God Bless America
Ps.
opinion appreciated
TIA
NYBob
4年前
$Is there a buyers on the horizon )
It’s a perfect setup...
The reality is that the future looks pretty bright for
Nevada Copper Corp (NEVDF) or Hudbay with large copper properties
beside each other =
Likely profitable going forward and holding some excellent properties
in stable jurisdictions.
It is a perfect time for Barrick or ? to make a play for Nevada Copper
or/and Hudbay.
Ex...
Barrick has publicly stated that they are looking for a copper play.
Maybe soon to moon )
Russia elite billionaire taken large position with great future
foresight -
$China, Peru, and the copper bull market
12,351 views•May 8, 2021
https://www.youtube.com/watch?v=NGDmrKktevg
$Lucky NCU is only now bringing up High-Grade ore
We will now be selling high grade at these kind of prices
instead of the $2.75 or something that the original hedging
was done at.
)
$4.7570 +0.0398 +0.84%
21:44:03 - Real-time derived data. Currency in USD ( Disclaimer )
$Remember 65,000,000 pounds of copper per year soon to be burbing up
from the underground mine alone... U can do the math.
by Notgnu
$What’s Behind Surging Copper Prices?
3,186 views•May 11, 2021
https://www.youtube.com/watch?v=Uc9KfIPzp5A
Record High Metal Prices - Copper and Steel Demand Surge
417 views•May 9, 2021
https://www.youtube.com/watch?v=7qXSHwcUYQc
$Nevada Copper Corp (NEVDF) Analyst; Copper to surge at
least seven-fold before this bull market is
over ..... )
https://www.kitco.com/news/2021-05-11/Copper-to-surge-at-least-seven-fold-before-this-bull-market-is-over-Goehring-Rozencwajg.html
$Copper price hits 10-year highs; where is it headed from here? –
Gary Wagner
21,717 views•Apr 26, 2021
https://www.youtube.com/watch?v=VOhe4hQmGrE
$Nevada Copper Corp (NEVDF) First New Source of Copper Supply in the US in a Decade Comes Online
Contributed Opinion - New Mill 5000 t/d it would take 10-20yrs for
someone else to get permits , construction development etc. -
NCU got it, made it and its a Mother Lode Cu-Au-Ag bargain today -
for fiat peanuts- slave currency IMO!
$nowwhat2 thanks; Copper outlook just became even stronger >>> maybe $20,000 !
https://www.cnbc.com/2021/05/06/copper-is-the-new-oil-and-could-hit-20000-per-ton-analysts-say.html
$Copper's supply crunch will drive prices to $13,000 or even $20K - Bank of America
https://www.kitco.com/news/2021-05-05/Copper-s-supply-crunch-will-drive-prices-to-13-000-or-even-20K-Bank-of-America.html
$nw2 well it's long overdue for NEVDF to move to the Cu-BULL TOP -
to Ccpycat Ex...EXMGF's BULL-RUN - NEVDF MOVE UP ROCKET TO GOOOOOO )
$Nevada Copper Corp. starting Cu-Bull Run - TO ROCKET Back UP $6/sh++++ BLAST IT )
$Why has silver price not yet spiked from demand, but copper has? Lobo Tiggre
65,199 views•Apr 28, 2021
https://www.youtube.com/watch?v=6mgOPnZ1Vbc
$Nevada Copper Corp (NEVDF) RE: Converted to Canadian = $1.66 to $3.30 per share......
At $4.50 copper, 2.3 billion fully diluted shares and 70,000 TPD open
pit:
70,000 tpd X .005 copper equivalent X 88% recovery X 2000 pounds per ton
X 365 days per year = 225 million pounds plus 65 million pounds from
underground = 290 million pounds X ~ $2.50 profit = $725,000,000 free
cash-flow per year.
$0.725 billion p/year cash flow X5 multiple = $3.63 billion / 2.3 billion shares = $1.58 USD p/s
$0.725 billion p/year cash flow X6 multiple = $4.35 billion / 2.3 billion shares = $1.89 USD p/s
$0.725 billion p/year cash flow X7 multiple = $5.08 billion / 2.3 billion shares = $2.21 USD p/s
$0.725 billion p/year cash flow X8 multiple = $5.80 billion / 2.3 billion shares = $2.52 USD p/s
$0.725 billion p/year cash flow X9 multiple = $6.53 billion / 2.3 billion shares = $2.84 USD p/s
$0.725 billion p/year cash flow X10multiple =$7.25 billion / 2.3 billion shares = $3.15 USD p/s
$1.96 CAD to $3.91 CAD per share
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
$At $5.00 copper, 2.3 billion fully diluted shares and 70,000 TPD
70,000 tpd X .005 copper equivalent X 88% recovery X 2000 pounds per ton
X 365 days per year = 225 million pounds, plus 65 million pounds from
underground = 290 million pounds X ~ $3.00 profit = $870,000,000 free
cash-flow per year.
$0.87 billion p/year cash flow X5 multiple = $4.35 billion / 2.3 billion shares = $1.89 USD p/s
$0.87 billion p/year cash flow X6 multiple = $5.22 billion / 2.3 billion shares = $2.27 USD p/s
$0.87 billion p/year cash flow X7 multiple = $6.09 billion / 2.3 billion shares = $2.65 USD p/s
$0.87 billion p/year cash flow X8 multiple = $6.96 billion / 2.3 billion shares = $3.03 USD p/s
$0.87 billion p/year cash flow X9 multiple = $7.83 billion / 2.3 billion shares = $3.40 USD p/s
$0.87 billion p/year cash flow X10multiple =$8.70 billion / 2.3 billion shares = $3.78 USD p/s
$2.36 CAD to $4.72 CAD per share
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
$Current underground mine as a stand alone after ramp up:
65 million pounds per year x $2.44 ($4.30 - $1.86 = $2.44)
Free cash-flow of about $159 million USD per year at a conservative, low 5 X cash-flow multiple =
$793 million, divided by 1.8 billion shares = $0.44 USD = $0.55 CAD
by nozzpack
$Joecanada13 EnjoY Nevada Copper Mine; Ya big block buys going through - The new golden oil - Looks primed for another bull run ^^^^^ )
https://www.msn.com/en-us/money/markets/copper-is-the-new-oil-and-could-reach-15000-by-2025-as-the-world-transitions-to-clean-energy-goldman-sachs-says/ar-BB1fE8bx
https://www.cnbc.com/2021/04/14/goldman-says-copper-is-the-new-oil-raises-price-forecast.html
$Nevada Copper - Pumpkin Hollow Project Extract - will be the great new
copper, silver, gold mine - )
$Nevada Copper Provides Operations Update
April 21, 2021
View PDF
April 21, 2021 –
$Nevada Copper Corp. (TSX: NCU) (OTC: NEVDF)
(“Nevada Copper” or the “Company”) provides a project update for the
underground mine at its Pumpkin Hollow project (the “Underground
Project”).
https://nevadacopper.com/news/nevada-copper-provides-operations-update/
Performance Highlights
First Stopes to Be Mined
The first stope will be mined in the East South Alphabets zone this week.
$The Alphabets zone is expected to carry copper equivalent grade of
approximately 2.5%.
Ventilation Expansion
The electrical upgrades have been completed and the fan bulkhead is in
the final stages of construction for installation of the remaining
underground ventilation fans.
Two additional underground ventilation fans, as previously announced,
are on schedule for installation in May, which should enable further
increases in underground development rates.
The surface ventilation fans remain on schedule for installation in the
third quarter of 2021.
Lateral Development
Lateral development in March increased 69% from February after the
previously announced electrical upgrades were completed.
Lateral development early in the first quarter 2021 was slower than
anticipated due to cautious progress through a water bearing dike.
Progress continues with penetration through the dike.
$Continuing to Increase Mill Throughput Rates
While we are still batch processing ore through the mill, we achieved a
weekly average of 4,700 tons per day (“tpd”) and maximum daily milling
throughput of 5,000 tpd during March.
Concentrate grade continues to be achieved that comply with off-take
specifications.
Concentrate grade has continued to rise, with an average grade of 26%
achieved in March compared to 24% during January and February.
The Company is on schedule to reach steady-state production of
approximately 5,000 tpd in the third quarter of 2021.
“We are pleased with the progress achieved in Q1 despite the challenges
with lateral development and we look forward to the imminent blasting
of our first high grade stopes,” stated Mike Ciricillo, Chief Executive
Officer of Nevada Copper.
“As well as advancing our stope development, we look forward to further
increases in underground development rates as we move closer to steady-
state production in Q3 this year.”
Qualified Persons
The information and data in this news release was reviewed by
Greg French, C.P.G., and Norm Bisson, P. Eng.,
for Nevada Copper, who are non-independent Qualified Persons
within the meaning of NI 43-101.
About Nevada Copper
Nevada Copper (TSX: NCU) is a copper producer and owner of
The Pumpkin Hollow Copper Mine project -
Located in Nevada, USA,
$Pumpkin Hollow Mine has substantial reserves and
resources including copper, gold and silver.
Its two fully permitted projects include the high-grade underground mine
and processing facility, which is now in the production stage, and
a large-scale open pit project, which is advancing towards
feasibility status.
NEVADA COPPER CORP.
http://www.nevadacopper.com
Mike Ciricillo, President and CEO
For further information contact:
Rich Matthews, Investor Relations
Integrous Communications
rmatthews@integcom.us
+1 604 757 7179
https://nevadacopper.com/news/nevada-copper-provides-operations-update/
https://nevadacopper.com/
$COPPER PRICE TECHNICAL ANALYSIS: DAILY CHART (MARCH 2020 TO APRIL 2021) (CHART 1)
$Copper prices have indeed found bullish resolution, with copper prices in
the past two days rising to their highest level since February 25 –
the day that the yearly high was established.
With a strong fundamental backdrop, the technical picture looks promising
as well.
Copper prices are above their daily 5-, 8-, 13-, and 21-EMA envelope,
which is in bullish sequential order. Daily MACD
$Nevada copper very Undervalued, oversold @ a bargain -
the Cu investors have not discovered Nevada Copper yet -
its a great opportunity, imo! )
Ex....
$Interview with Stephen Gill, chairman of Nevada Copper
Maurice Jackson of Proven and Probable talks with
Stephen Gill, chairman
of Nevada Copper, who discusses his company's copper project,
where the underground mine is ramping up production and
the open pit is fully permitted.
https://www.streetwisereports.com/article/2021/04/13/first-new-source-of-copper-supply-in-a-decade-comes-online-in-us.html
https://www.mining.com/goldman-doubles-down-record-high-copper-price-within-a-year/
https://nevadacopper.com/news
https://investorshub.advfn.com/Nevada-Copper-Corp-NEVDF-32771/
http://ow.ly/Ir5Z50EnREY
Iorich, Vladimir
Ex...
https://www.celebritynetworth.com/richest-businessmen/richest-billionaires/vladimir-iorich-net-worth/
Ex. Iorich Vladimir bought in NCU for a much higher price and I am sure
he still will be doing very well on the LT longer term
Imo!
$Nevada Copper - Pumpkin Hollow Project Extract -
https://www.youtube.com/watch?v=fMZC65A7GPk
https://www.youtube.com/watch?v=rFw0OFaTHKs
https://nevadacopper.com/news
In GOD We Trust - Real Money -
https://www.kitco.com/images/live/silver.gif?0.8344882022363285
http://www.kitconet.com/images/live/au0001wb.gif
Gold & Silver is the only REAL Legal Tender -
by The Founding Fathers for your -
Rights, Liberty and Freedom -
http://www.biblebelievers.org.au/monie.htm
God Bless America
Ps.
opinion appreciated
TIA
NYBob
4年前
$i-80 Gold Corp. (TSX: IAU): Newest Gold Producer in the Market. a Nevada-
Focused Mining Company, Goal of Achieving Mid-Tier Gold Producer Status;
Ewan Downie, CEO Interviewed
By Dr. Allen Alper, PhD Economic Geology and Petrology, Columbia
University, NYC, USA
on 4/25/2021
We spoke with Ewan Downie, CEO and Director of i-80 Gold Corp. (TSX: IAU),
the newest gold producer in the market. i-80 Gold Corp is a Nevada-focused
mining company, with a goal of achieving mid-tier gold producer status.
$The Company is currently producing gold at its El Nino mine at
South Arturo (joint venture with Nevada Gold Mines –
a joint venture between Barrick Gold Corporation and Newmont
Corporation).
The Company is also advancing the development of its 100% owned,
feasibility-stage McCoy-Cove projects, located proximal
to Nevada Gold Mines’ Phoenix operation, and
its past producing Getchell project that is located immediately
south of Nevada Gold Mines’ Turquoise Ridge operation.
The PEA of the Getchell project is expected to be completed in H1 2021,
followed by the commissioning of a Preliminary Feasibility or
Feasibility Study, immediately after.
http://www.metalsnews.com/Metals+News/MetalsNews/Dr.+Allen+Alper,+PhD+Economic+Geology+and+Petrology,+Columbia+University,+NYC,+USA/FEATURED1353150/i80+Gold+Corp+(TSX+IAU)+Newest+Gold+Producer+in+the+Market+a+NevadaFocused+Mining+Company+Goal+of+Achieving+Mid.htm
https://i80gold.com/investors/#presentation
For further information, please contact:
Ewan Downie, CEO
1.888.346.1390
Info@i80gold.com
http://www.i80gold.com
https://i80gold.com/south-arturo/
In GOD We Trust - Real Money -
https://www.kitco.com/images/live/silver.gif?0.8344882022363285
http://www.kitconet.com/images/live/au0001wb.gif
Gold & Silver is the only REAL Legal Tender -
by The Founding Fathers for your -
Rights, Liberty and Freedom -
http://www.biblebelievers.org.au/monie.htm
God Bless America
Ps.
opinion appreciated
TIA
NYBob
4年前
$i-80 GOLD CORP. (TSX:IAU) Own 40% & Barrick Gold own 30% & Newmount 30% of the 60% in Nevada Gold Corp.
(“i-80”, or the “Company”) is pleased to
provide an update for its 40%-owned South Arturo Property located in
the Carlin Trend of Nevada.
Reno, Nevada, April 21, 2021 –
https://i80gold.com/i-80-gold-provides-south-arturo-update-in-nevada/
$South Arturo is a joint venture with Nevada Gold Mines (“NGM”) and
includes the high-grade El Nino underground mine, which is in
production.
Work completed in 2020 included a successful expansion drill program at
El Nino as well as work targeting the advancement of two additional
development opportunities on the property; the Phase 1 open pit and the
Phase 3 project.
El Nino
The 3,800 metre drill campaign completed in 2020 from underground drilling stations demonstrated the ability to extend mine life at depth with numerous high grade intercepts (previously released) including 26.76 g/t Au across 18.3 m, 17.11 g/t Au across 39.6 m and 5.73 g/t Au across 100.6 m. Additional highlight results from new results received from the 2020 program are provided below. Following up on the success of this drill program, more than 8,000 meters of exploration drilling are planned in 2021 focused on extending mineralization further down dip at the Lower El Nino and Cloud Nine targets.
Highlight assay results for previously unreleased intercepts from the 2020 drill program include:
19.8 m of 12.20 g/t Au (SEC20012)
29.0 m of 6.20 g/t Au (SEC20014)
25.9 m of 14.05 g/t Au (SEC20015)
Development of a ramp to access the deeper mineralization is under way and is expected to be completed in Q1 2023. Production of orebodies accessed from the ramp is expected to begin in Q2 2022.
Phase 1
More than 3,500 metres of drilling was completed on the near surface portion of the planned Phase 1 open pit to increase confidence in the ore reserves and upgrade mineral resources. This drilling returned higher than expected grade-thicknesses and Barrick has moved heap leach material from Phase 1 into their year-end 2020 mineral reserves. In 2021, the joint venture plans to complete further metallurgical work in advance of mine construction.
Phase 3
2020 drilling completed in the Phase 3 project area also returned favorable results and the joint venture partners have commenced trade-off studies to optimize the economics of the project as an underground versus open pit project, or a combination scenario. Initial work on the underground option has been encouraging and 3,500 metres of exploration drilling is planned to test the Hendrix target located between the El Nino and Phase 3 deposits.
“El Nino continues to deliver excellent results as demonstrated by the latest intercepts of our 2020 drill campaign. Multiple holes intersected zones of impressive grade over a mineable width”, stated Matt Gili, President and COO of i-80 Gold. “We expect to see these results incorporated into an updated mineral resource model expected later in 2021. The deposit remains open at depth and along strike”.
Figure 1 – El Nino isometric view – Drilling from underground platforms
https://i80gold.com/i-80-gold-provides-south-arturo-update-in-nevada/
About i-80 Gold Corp.
i-80 Gold Corp. is a Nevada-focused mining company with a goal of achieving mid-tier gold producer status. In addition to its producing mine, El Nino at South Arturo, i-80 is beginning to plan for future production growth through the potential addition of the Phases 1 & 3 projects at South Arturo and advancing the development of the Company’s Getchell and McCoy-Cove Projects.
Qualified Person
Tim George, PE, Manager of Engineering Services, is the Qualified Person for the information contained in this press release and is a Qualified Person within the meaning of National Instrument 43-101. The primary assay laboratories for the South Arturo Mine are ALS Minerals and American Assay Labs in Reno, Nevada. For a complete description of sample preparation, analytical methods and QA/QC procedures, refer to the technical report dated January 25, 2021 (effective date December 1, 2020), titled “Preliminary Feasibility Study for the South Arturo Mine, Elko County, NV” located on i-80’s website and at www.sedar.com.
Abbreviations used in this press release are available by following this link (click here).
https://i80gold.com/investors/#presentation
For further information, please contact:
Ewan Downie, CEO
1.888.346.1390
Info@i80gold.com
http://www.i80gold.com
https://i80gold.com/south-arturo/
Ps.
Barrick should buy IAU & MMY bpth are bargain producer of gold & silver -
Ex....
$Monument Mining Limited (MMY.VN) -
$MMY- $70 mil in assets and only a $42 mil market cap? NO DEBT! smile)
https://www.barchart.com/stocks/quotes/MMY.VN/opinion
$Way undervalued and oversold - 5 bagger + + + + ? or more -
IMO!
https://investorshub.advfn.com/boards/read_msg.aspx?message_id=161590519
In GOD We Trust - Real Money -
https://www.kitco.com/images/live/silver.gif?0.8344882022363285
http://www.kitconet.com/images/live/au0001wb.gif
Gold & Silver is the only REAL Legal Tender -
by The Founding Fathers for your -
Rights, Liberty and Freedom -
http://www.biblebelievers.org.au/monie.htm
God Bless America
Ps.
opinion appreciated
TIA
NYBob
4年前
$i-80 Gold Corp. (TSX:IAU) SOUTH ARTURO Gold Mine;
https://i80gold.com/south-arturo/
Located along the northern section of the productive Carlin Trend,
i-80 holds a 40% interest in the South Arturo Property
in partnership with Nevada Gold Mines, a joint venture
between Barrick Gold Corporation and Newmont Corporation,
that owns the remaining 60% interest.
QUICK FACTS
OWNERSHIP
40% i-80 Gold, 60% Nevada Gold Mines
LOCATION
Carlin Trend – Northern Nevada
MINE LIFE
2 years (UG) 7 years (OP)
MINING STYLE
Open-pit & Underground
PRODUCTION
23,488oz (2020)
OPERATING COSTS (2020)
Cash Costs – $1,023/oz
AISC – $1,122/oz
P+P RESERVES (ATTRIBUTABLE TO I-80)
3,800 kt @ 2.87 g/t for 350.5 koz
M&I RESOURCES (ATTRIBUTABLE TO I-80)
19,992 kt @ 1.20 g/t Au for 768.3 kozs
INFERRED RESOURCES (ATTRIBUTABLE TO I-80)
10,177 kt @ 0.99 g/t for 322.4 oz
TECHNICAL REPORTS
South Arturo, Elko County, Nevada (Jan 25, 2021)
https://i80gold.com/investors/
https://i80gold.com/
Celtic Heart (PBS Special) "Kid ar an Sliabh" -
https://www.youtube.com/watch?v=sEMR16gOXLM
In GOD We Trust -
https://www.kitco.com/images/live/silver.gif?0.8344882022363285
http://www.kitconet.com/images/live/au0001wb.gif
Gold & Silver is the only REAL Legal Tender -
by The Founding Fathers for your -
Rights, Liberty and Freedom -
http://www.biblebelievers.org.au/monie.htm
God Bless America
Ps.
opinion appreciated
TIA
NYBob
4年前
Japan Gold Reports Results of Scout Drilling at Ohra-Takamine
Epithermal Gold Project in Southern Kyushu
https://www.japangold.com/index.php/news/2021/536-apanoldeportsesultsofcoutrillingathraakami20210316083000
Vancouver, British Columbia--(Newsfile Corp. - March 16, 2021) -
Japan Gold Corp. (the "Company") (TSXV: JG) (OTCQB: JGLDF) is pleased
to announce the results of the three scout drill holes completed at its
Ohra-Takamine Project in southern Kyushu.
Drilling encountered narrow high-grade gold vein intercepts below the
Urushi Mine, and multiple gold-anomalous sheeted quartz vein zones
below the Ohra Mine workings.
Ohra-Takamine Central Mine Corridor Scout Drill Program
Three scout holes were drilled (total 1624.0 metres (m)) along the central 3.5 kilometres (km) corridor of alteration and epithermal-gold mineralization defined by the Ohra, Takamine and Urushi historic mines, (Figure 1). Production records prior to the government-imposed closure of these mines in 1943, include high-grade vein shoots with grades greater than 20 g/t gold at the Ohra Mine, and between 50 to 100 g/t1 at the Urushi Mine, (Figure 2). Drilling targeted below these high-grade shoots, which lie coincident with surface soil geochemical anomalies (Figure 3) and CSAMT geophysical anomalies (Figure 4).
Drilling Results
Drillhole OTDD20-001, targeting the down dip extension of the Urushi Mine workings, intersected 7 narrow, gold-anomalous quartz veins (Figure 5) including highlight intercepts of:
0.35 m @ 21.7 g/t Au & 13 g/t Ag from 233.95 m
4.15 m @ 1.6 g/t Au & 2.4 g/t Ag from 222.6 m
(inc. 0.55 m @ 3.5 g/t Au & 4.5 g/t Ag from 225.7 m)
(and. 0.25 m @ 6.5 g/t Au & 7.5 g/t Ag from 226.0 m)
1.2 m @ 1.5g/t Au & 31 g/t Ag from 114. 4m
(inc. 0.4 m @ 3.2 g/t Au & 84 g/t Ag from 115.2 m)
Drill hole OTDD19-001, drilled from the north side of the Ohra Mine, intersected a 4.5 m wide (down-hole width) quartz vein from 227 m down hole. A 0.35 m wide portion of the vein returned 1.7 g/t Au and 5.0 g/t Ag.
Drillhole OTDD20-002, targeting beneath the Ohra Mine workings (Figure 6) intersected numerous broad intervals of intense alteration and quartz veining from a downhole depth of 206 m to end of hole (584 m). These zones range from 4 to 40 m in downhole length.
Drill intersections include the following significant mineralized intervals:
Table 1: Anomalous drill hole intercepts.
Hole ID Azimuth (degrees) Inclination (degrees) Total Depth From (m) To (m) Interval (m) Au (ppm) Ag (ppm)
OTDD19-001 195 45 455.00 231.15 231.50 0.35 1.7 5.0
OTDD20-001 335 50 602.00 114.40 115.60 1.20 1.5 31.0
Incl. 115.20 115.60 0.40 3.2 84.0
166.95 167.20 0.25 1.1 1.8
222.60 226.75 4.15 1.6 2.4
Incl. 225.70 226.25 0.55 3.5 4.5
Incl. 226.00 226.25 0.25 6.5 7.6
233.95 234.30 0.35 21.7 13.3
326.90 327.70 0.80 1.3 3.0
329.10 329.35 0.25 1.5 4.0
383.50 383.90 0.40 2.9 4.0
OTDD20-002 330 40 584.00 No significant result
Urushi Mine
The mineralization intersected in the upper half of drill hole OTDD20-001, is separate and parallel to the veins mined in the Urushi workings, Figure 5. The up-dip extension of these veins is untested at the elevation of the Urushi Mine workings and may represent en echelon (parallel) repetitions of the high-grade veins mined at Urushi. The mineralized veins intersected below 326.9 m downhole appear to represent the down dip extension of vein structures mined historically in the Urushi workings.
Within the mine alteration corridor, 8 drill holes were completed as part of government funded geological survey work by the Metal Mining Agency of Japan (MMAJ) during the 1980's. Two drill holes located north of the Urushi Mine encountered narrow high-grade mineralization and indicate the potential for mineralized extensions along the north side of the mine workings, refer to Figure 5. The other MMAJ drill holes failed to reach the interpreted depth projection of the Ohra-Takamine vein system hence did not encounter significant mineralization.
Ohra Mine
Drill hole OTDD20-002 targeted the depth extent of three, wide, banded epithermal veins mined from surface over a ~140 m vertical extension at the Ohra Mine. Surface outcrops of the three Ohra veins are up to 4.6 m wide and vary in width between 0.3 and 8 m underground2, (Figure 2 & 6). Eight discrete zones of intense sheeted to stockwork veining were intersected, varying in downhole length between 4 and 40 m. These zones contain numerous banded and single-phase, fine-grained quartz and quartz-carbonate veins and veinlets up to 30 centimetres (cm) wide.
The five vein zones intersected between 228 and 360 m, immediately below the Ohra workings contain anomalously elevated gold values and are interpreted to represent the feeder structures to the Ohra veins mined in historical workings. Three vein network zones intersected deeper in the drill hole, between 420 to 523 m, could represent the feeder system to a separate, parallel vein system, (Figure 6). The lower three vein zones show limited exposure at surface, ~250 m above, but their surface expression is characterised by strong, pervasive clay alteration and elevated gold and pathfinder element geochemistry in soils. Sinter sub-crops, and coincident CSAMT, soil and alteration anomalism are traceable along the mine corridor for 1.5 km from the Ohra Mine towards the Takamine Mine representing the strike extension the Ohra Mine veins.
Conclusions and Next Steps
Information gained from these scout drill holes has been assessed along with coincident anomalies of CSAMT, soil geochemistry, alteration and geological mapping. These results have defined a series of un-tested targets that lie both along strike of, and parallel to the historic mines. The combined strike length of these more coherent geophysical-geochemical-alteration anomalies represents a series of priority drill target areas with a cumulative strike length of over 5 km, (Figures 1, 3 & 4). A separate, coincident soil geochemical - alteration anomaly extends the Ohra alteration system another 2.5 km along strike to the northeast. Geophysical surveys are planned to further define this large anomaly, (Figure 3).
The discovery of new vein zones with limited or weak surface outcrop in the vicinity of the Urushi Mine as well as between the Ohra and Takamine Mines, gives encouragement for the exploration potential both along the trend and below cover further along strike to the southwest, where coincident soil and CSAMT anomalies are partly concealed by younger post-mineral geology.
The Company has 11 additional drill pad locations permitted for drilling along the central mine corridor. With the definition of these new target zones, further drill pads will be permitted to properly test and advance the Ohra-Takamine Project.
References:
1 Gold Mines of Japan, 1989. The Mining & Materials Processing Institute of Japan.
2 Kim S., (1938) The Geology and Deposits in the Ohra Mine. The Mining Magazine, vol. 15, no. 3, p. 15-19.
Sampling Techniques and Assaying
The drilling results discussed in this news release are from drill core samples obtained by PQ, HQ and NQ-size triple-tube diamond core drilling using a Longyear 38, and PMC700 man-portable drill rigs owned and operated by the Company. The drilling program was fully supervised by Company senior geologists at the drilling site.
Drill core was collected in plastic core-trays at the drill site and transported by road in Company vehicles to its core shed storage facility in the nearby Urushi Village, located centrally within the project area. The drill core was carefully logged, photographed and sample intervals marked-up along predicted mineralized and selected unmineralized intervals by Japan Gold KK senior project geologists.
Sample lengths varied from 0.2 to 1.0 m; depending on the positions of geological contacts and variations in vein texture and composition. The core was split by diamond rock saw supervised by project geologists. Half-core sample was collected from the entire length of each designated sample interval and placed into individual-labelled, self-sealing calico bags for secure packaging and transport to the laboratory. The half-core samples weighed between 1 to 8 kg depending on the sample length and core size. A Chain-of-Custody was established between the Company and receiving laboratory to ensure the integrity of the samples during transportation from site to the lab. The samples were sent in batches to ALS Laboratories in Vancouver, Canada for sample preparation and assaying.
Samples were crushed, pulverised and assayed for gold 50 g charge Fire Assay/ AAS Finish (Au-AA24; 0.005 ppm lower detection limit) and a 48 multi-element by 4-acid digest with ICP-MS determination (ME-MS61L; Ag 0.002 ppm lower detection limit).
Certified Reference Materials (CRMs) were inserted by Japan Gold KK at every 20th sample to assess repeatability and assaying precision of the laboratory. In addition, the laboratory applied its own internal Quality Control procedure that includes sample duplicates, blanks & geochemical standards. They report these results with the certified Assay Report. Laboratory procedures and QAQC protocols adopted are considered appropriate. The CRMs and internal QC-QA results fall within acceptable levels of accuracy & precision and are considered to lack any bias.
Qualified Person
The technical information in this news release has been reviewed and approved by Japan Gold's Vice President of Exploration and Country Manager, Andrew Rowe, BAppSc, FAusIMM, FSEG, who is a Qualified Person as defined by National Instrument 43-101.
On behalf of the Board of Japan Gold Corp.
"John Proust"
Chairman & CEO
About Japan Gold Corp.
Japan Gold Corp. is a Canadian mineral exploration company focused solely on gold exploration across the three largest islands of Japan: Hokkaido, Honshu and Kyushu. The Company has a country-wide alliance with Barrick Gold Corporation to jointly explore, develop and mine certain gold mineral properties and mining projects. The Company holds a portfolio of 31 gold projects which cover areas with known gold occurrences, a history of mining and are prospective for high-grade epithermal gold mineralization. Japan Gold's leadership team represent decades of resource industry and business experience, and the Company has recruited geologists, drillers and technical advisors with experience exploring and operating in Japan. More information is available at www.japangold.com or by email at info@japangold.com.
John Proust
Chairman & CEO
Phone: +1 778 725-1491
Email: info@japangold.com
Cautionary Note
Neither the TSX Venture Exchange nor its Regulation Services Provider (as such term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release contains forward-looking statements relating to the Private Placement. These statements are forward-looking in nature and, as a result, are subject to certain risks and uncertainties that include, but are not limited to, general economic, market and business conditions; receipt and timing of regulatory approvals; new legislation; potential delays or changes in plans; and the Company's ability to execute and implement future plans. These forward-looking statements include completion of the Private Placement and the use of proceeds from that financing. Actual results achieved may differ from the information provided herein and, consequently, readers are advised not to place undue reliance on forward-looking information. The forward-looking information contained herein speaks only as of the date of this news release. The Company disclaims any intention or obligation to update or revise forward-looking information or to explain any material difference between such and subsequent actual events, except as required by applicable law.
Cannot view this image? Visit: https://orders.newsfilecorp.com/files/5665/77406_b22f205924403ad9_001.jpg
Figure 1: Ohra-Takamine Central Mine Corridor, simplified geology and historic mines, alteration, drilling and combined anomalous zones
To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/5665/77406_b22f205924403ad9_001full.jpg
Cannot view this image? Visit: https://orders.newsfilecorp.com/files/5665/77406_b22f205924403ad9_002.jpg
Figure 2: Ohra-Takamine central mine corridor long-section with historic workings and drill holes.
To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/5665/77406_b22f205924403ad9_002full.jpg
Cannot view this image? Visit: https://orders.newsfilecorp.com/files/5665/77406_b22f205924403ad9_003.jpg
Figure 3: Ohra-Takamine central mine corridor with gold and antimony soil anomalies and alteration interpretation
To view an enhanced version of Figure 3, please visit:
https://orders.newsfilecorp.com/files/5665/77406_b22f205924403ad9_003full.jpg
Cannot view this image? Visit: https://orders.newsfilecorp.com/files/5665/77406_b22f205924403ad9_004.jpg
Figure 4: Ohra-Takamine central mine corridor with CSAMT pseudo-sections, gold-antimony soil anomalies and combined anomalous zones
To view an enhanced version of Figure 4, please visit:
https://orders.newsfilecorp.com/files/5665/77406_b22f205924403ad9_004full.jpg
Cannot view this image? Visit: https://orders.newsfilecorp.com/files/5665/77406_b22f205924403ad9_005.jpg
Figure 5: Urushi Mine cross-section with Japan Gold and MMAJ drill intersections
To view an enhanced version of Figure 5, please visit:
https://orders.newsfilecorp.com/files/5665/77406_b22f205924403ad9_005full.jpg
Cannot view this image? Visit: https://orders.newsfilecorp.com/files/5665/77406_b22f205924403ad9_006.jpg
Figure 6: Ohra Mine cross-section with Japan Gold and MMAJ drilling
To view an enhanced version of Figure 6, please visit:
https://orders.newsfilecorp.com/files/5665/77406_b22f205924403ad9_006full.jpg
Corporate Logo
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/77406
https://www.japangold.com/index.php/news/2021/536-apanoldeportsesultsofcoutrillingathraakami20210316083000
NYBob
4年前
Japan Gold Further Expands Barrick Alliance Projects in Southern Kyushu Following Positive Work Program Results
V.JG | 1 day ago
Vancouver, British Columbia--(Newsfile Corp. - January 26, 2021) -
Japan Gold Corp. (TSXV: JG) (OTCQB: JGLDF) (the "Company") is pleased to announce acceptance by the Japanese Ministry of Economy, Trade and Industry ("METI") of 18 new prospecting rights applications covering extensions to the Barrick Alliance, Mizobe and Onoyama-Yamagano Projects in the Hokusatsu Region of the Southern Kyushu Epithermal Gold Province.
Highlights:
The Hokusatsu Region of Southern Kyushu is Japan's largest gold producing area with low-sulphidation epithermal deposits recording a combined production of over 11 million ounces.
The 18 new prospecting rights applications accepted by METI bring the Company's total coverage in the Hokusatsu Region to a total of 100,452.8 hectares, approximately 84% of prospective and explorable ground within the region, Figure 1.
Epithermal vein deposits in the Hokusatsu Region are generally hosted on the western margins of gravity anomalies which form the basis for the new prospecting rights applications.
The Onoyama-Yamagano Project is located along the prospective Hokusatsu volcanic front, north of the Company's Ohra-Takamine Project and the Barrick Alliance Mizobe-Onoyama Project, and west of the historic Yamagano Gold Mine which produced in excess of 910,000 ounces of gold at a grade of 17.4g/t1
9 new applications on the western side of the Onoyama-Yamagano Project were lodged to cover the western flank of a gravity-high feature which has been further defined by the Barrick Alliance project scale geophysical surveys, Figure 2.
The Mizobe Project, which now incorporates the Mizobe 1st Extension Project, is located in the southeast corner of the Hokusatsu Region and covers an area of gold-antimony anomalism associated with an extensive gravity-high feature that runs through the Mizobe Project and into the northeast part of the Ohra-Takamine Project.
The 9 new Mizobe West Extension applications were similarly positioned to cover the southwest flanks of the gravity anomaly which coincident with highly anomalous quartz veins, breccia, and sinter floats sampled in drainages on the western side of the Mizobe Project and the southwest portion of the Mizobe-Onoyama Project, Figure 3.
The Company's portfolio now comprises of 202,926.2 hectares (2029.26 square kilometers) of prospective ground across Japan's 5 major epithermal gold provinces within the three main islands of Kyushu, Honshu and Hokkaido
Hokusatsu Region, Southern Kyushu Epithermal Gold Province
The Hokusatsu Region lies within the northern half of the Southern Kyushu Epithermal Gold Province and covers an area of approximately 120,000 hectares. Hokusatsu is Japan's largest gold producing region with low-sulphidation epithermal deposits recording a combined production in excess of 11 million ounces1,2,3.
Gold mineralization in the Hokusatsu Region is localised along an 80-kilometer long, arcuate, northeast to northerly trending volcanic front west of the Kagoshima graben, and bound by the Kushikino Mine in the west and the Fuke Mine in the north. Low-sulphidation epithermal deposits in the region are characterised by distinctive Bouguer gravity-high anomalies and gradients related to doming of the underlying Cretaceous basement. The Company has utilised this key feature, among others, to expand its comprehensive coverage over the highly prospective Hokusatsu Region.
Onoyama-Yamagano Project
The Onoyama-Yamagano Project is located along the Hokusatsu volcanic front north of the Company's Ohra-Takamine and Barrick Alliance Mizobe-Onoyama Projects, and south of the historic Yamagano Gold Mine which produced in excess of 910,000 ounces of gold at a grade of 17.4g/t1, Figure 1. The Yamagano vein system straddles a significant gravity-high feature and has an approximately 400 year history of underground mining. Project scale gravity surveying completed by the Barrick Alliance has defined an area of gravity anomalism approximately 5 kilometers west of the Yamagano Mine, Figure 2. The newly defined gravity anomaly is covered by volcanic rocks which are younger than the host rocks of the Yamagano veins and may therefore cover mineralization related to the gravity feature. The 9 new applications were positioned to fully cover the western flank of this gravity feature as epithermal vein deposits in the region are generally hosted on the western margins of gravity anomalies. With the inclusion of the 9 new applications the Onoyama-Yamagano Project now comprises a total 12,049.4 hectares.
Mizobe Project
The Mizobe Project which collectively includes the Mizobe, Mizobe 1st Extension applications, and the 9 newly accepted Mizobe West 2nd Extension applications now comprises a total area of 7,579.5 hectares. The Mizobe Project is located in the southeast corner of the Hokusatsu Region covering an area of gold and antimony anomalism associated with an extensive gravity-high feature that runs northwest through the Mizobe Project and into the northeast of the Ohra-Takamine Project, Figure 1 & 3. In the eastern part of the Mizobe Project historic mining activities were focused on antimony mineralization at the Semari and Chuzono Mines. Barrick Alliance results reported in a Company news release dated September 30, 2020 discussed strong gold anomalism associated with antimony bearing breccias and banded quartz veins in drainages across the project, indicating exposure of the upper portions of a potentially extensive epithermal system.
Project scale gravity surveying by the Barrick Alliance has further defined the shape of the extensive gravity feature that runs through the Mizobe and in the Mizobe-Onoyama Projects. Gold and pathfinder element anomalous rock float including sinter sampled in drainages on the west of Mizobe, and the southwest the Mizobe-Onoyama Project indicated the need to expand coverage over the southwestern margins of this gravity feature. This has now been achieved with the acceptance of these 9 new applications.
As the Barrick Alliance programs advance, we will continue to expand the portfolio based on the identification of key prospectivity indicators throughout the gold provinces of Japan.
References
1 Watanabe Y, 2005. Late Cenozoic evolution of epithermal gold metallogenic provinces in Kyushu, Japan. Mineralium Deposita (2005) 40: pp 307-323
2Sumitomo Metal Mining Co., LTD. website, production as of end of March 2020.
3Garwin, S.G. et al. 2005. Tectonic setting, Geology, and gold and copper mineralization in the Cenozoic magmatic arcs of Southeast Asia and the West Pacific. Economic Geology 100th Anniversary Vol. pp 891-930
Qualified Person
The technical information in this news release has been reviewed and approved by Japan Gold's Vice President of Exploration, Andrew Rowe, BAppSc, FAusIMM, FSEG, who is a Qualified Person as defined by National Instrument 43-101.
On behalf of the Board of Japan Gold Corp.
"John Proust"
Chairman & CEO
About Japan Gold Corp.
Japan Gold Corp. is a Canadian mineral exploration company focused solely on gold exploration across the three largest islands of Japan: Hokkaido, Honshu and Kyushu. The Company has a country-wide alliance with Barrick Gold Corporation to jointly explore, develop and mine certain gold mineral properties and mining projects. The Company holds a portfolio of 31 gold projects which cover areas with known gold occurrences, a history of mining and are prospective for high-grade epithermal gold mineralization. Japan Gold's leadership team represent decades of resource industry and business experience, and the Company has recruited geologists, drillers and technical advisors with experience exploring and operating in Japan. More information is available at www.japangold.com or by email at info@japangold.com.
For further information, please contact:
John Proust
Chairman & CEO
Phone: 778-725-1491
Email: info@japangold.com
Cautionary Note
Neither the TSX Venture Exchange nor its Regulation Services Provider (as such term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release contains forward-looking statements relating to expected or anticipated future events and anticipated results related to future partnerships and the Company's 2020 gold exploration program. These statements are forward-looking in nature and, as a result, are subject to certain risks and uncertainties that include, but are not limited to, general economic, market and business conditions; competition for qualified staff; the regulatory process and actions; technical issues; new legislation; potential delays or changes in plans; working in a new political jurisdiction; results of exploration; the timing and granting of prospecting rights; the Company's ability to execute and implement future plans, arrange or conclude a joint-venture or partnership; and the occurrence of unexpected events. Actual results achieved may differ from the information provided herein and, consequently, readers are advised not to place undue reliance on forward-looking information. The forward-looking information contained herein speaks only as of the date of this News Release. The Company disclaims any intention or obligation to update or revise forwardlooking information or to explain any material difference between such and subsequent actual events, except as required by applicable laws.
https://stockhouse.com/companies/bullboard?symbol=t.abx&postid=32398376