RNS Number : 6625D
Energean PLC
11 September 2024
 

 

Energean plc

("Energean" or the "Company")

 

Results for Half-Year Ended 30 June 2024

London, 11 September 2024 - Energean plc (LSE: ENOG TASE: אנאג) is pleased to announce its half-year results for the six months ended 30 June 2024 ("H1 2024").

Operational Highlights:

·      Record production to date in the period, with Group production in June 2024 averaging 177 kboed (84% gas), including 140 kboed (86% gas) from the continuing operations[1], reflecting the step-up in demand during the summer in Israel.

·      Group production during H1 2024 was 146 kboed (82% gas), a 38% increase year-on-year (H1 2023: 106 kboed).

Production from the continuing operations1 during H1 2024 was 106 kboed (84% gas), a 47% increase year-on-year (H1 2023: 72 kboed).

Group production for the eight-months to August 2024 was 154 kboed, of which 115 kboed was from the continuing operations1.

Day-to-day production in Israel continues to be unimpacted by the ongoing geopolitical developments. FPSO uptime[2] (excluding planned shutdowns) was 99% in H1 2024.

·      Strategic sale of Egypt, Italy and Croatia portfolio (the "Transaction") to an entity controlled by Carlyle International Energy Partners ("Carlyle") targeted to complete by year-end 2024, subject to customary regulatory and antitrust approvals. 

Anti-trust and government approvals submitted and progressing on schedule. Carlyle received unconditional clearance from the Italian Competition Authority in August and approval of the Italian Presidency of the Council of Ministers in September, in respect of the Italian Golden Power Law.

Energean continues to expect to have sufficient funds at closing to repay in full the $450 million PLC Corporate Bond in priority and facilitate a special dividend of up to $200 million.

·      Key projects brought online.

In Israel, Karish North first gas and the second gas export riser completion was achieved in February 2024. Second oil train heavy lift vessel contract signed, expected to be installed in the coming months.

In Italy, Cassiopea started-up in August 2024. The remaining three wells and associated facilities are expected to be brought online, tested and commissioned over the coming months.

In Egypt, Location B gas production was brought online in August 2024.

·      Core gas projects underway and decarbonisation business progressing to facilitate future growth.

Final Investment Decision ("FID") on Katlan (Israel) taken in July 2024; first gas is planned for H1 2027. Energean expects spending to accelerate reflecting progress so far and anticipated progress for the year.

Anchois (Morocco) drilling operations continue, with preliminary analysis indicating volumes found in the Anchois-3 well are lower than pre-drill estimates. Further updates to follow once Anchois-3 ST drilling operations and ongoing technical evaluation are complete.

Prinos carbon storage project: (1) Front-End Engineering Design ("FEED") activities progressing, including phase 2 that targets to establish a facility with a capacity of up to 3 million tons of CO2 per year; (2) storage permit for phase 1 (1 million tons of CO2 per year) anticipated to be received in the coming months.

 

Financial Highlights:

·      Record financial results for the 6-months to 30 June 2024, following the start-up of Karish North and the completion of the second gas export riser (Israel).

Revenues of $867 million, a 47% increase (H1 2023: $588 million), of which $643 million is associated with the continuing operations1.

Adjusted EBITDAX[3] of $568 million, a 65% increase (H1 2023: $345 million), of which $436 million is associated with the continuing operations1.

The Group recorded total impairments of $76 million during the period, $61 million of which was in relation to the Orion X1 exploration well in Egypt.

Profit after tax of $89 million, a 27% increase (H1 2023: $70 million), of which $116 million is associated with the continuing operations1.

·      Group leverage[4] (net debt/annualised Adjusted EBITDAX) reduced to 2.5x (FY 2023: 3.1x).

Group cash as of 30 June 2024 was $345 million, including restricted amounts of $86 million[5], and total liquidity was $511 million[6]. This includes cash for the continuing operations1 of $317 million, including restricted amounts of $86 million6, and total liquidity of $483 million.

 

Corporate Highlights:

·      Q2 2024 dividend of 30 US$ cents/share declared today, scheduled to be paid on 30 September 2024[7]

Including the Q2 2024 dividend, approximately $486 million will have been returned to shareholders since payments began.

Energean reiterates its commitment to the existing dividend policy, which targets to return $1 billion to shareholders by the end of 2025. The Group expects to redefine its dividend policy upon Transaction closing.

·      Group Scope 1 and 2 emissions intensity of 8.5 kgCO2e/boe, a 20% reduction versus H1 2023[8]. Scope 1 and 2 emissions intensity for the continuing operations1 was 6.2 kgCO2e/boe.

2024 guidance:

·      Group production guidance narrowed to 155 - 165 kboed (from 155-175 kboed) for 2024, to reflect year-to-date performance in Israel and the actual start-date and expected ramp-up to full production of Cassiopea (Italy). 115-125 kboed is associated with the continuing operations1.

·      Group cash cost of production (including royalties) reduced to $550-600 million (from $570-630 million), predominantly due to lower forecasted royalties in Israel. $375-405 million is associated with the continuing operations1.

·      Development and production capital expenditure increased to $600-700 million (from $500-600 million), $60 million of this increase is related to Israel and the remainder to the disposal group. The increase in Israel is due to expected completion of milestones on the Katlan project (Israel) in 2024 versus 2025, reflecting progress so far and anticipated progress for the year. $320-380 million is associated with the continuing operations1.

Financial Summary

 


H1 2024

Energean Group

H1 2023

Energean Group

Increase/ (Decrease) %

H1 2024

Continuing operations

H1 2023

Continuing operations

Increase/ (Decrease) %

Average daily working interest production (kboed)

146

106

38%

106

72

47%

Sales revenue ($m)

867

588

47%

643

376

71%

Cash cost of production per barrel ($/boe)

10

12

(17%)

10

11

(9%)

Cash G&A[9]

19

18

6%

10

9

11%

Adjusted EBITDAX3 ($m)

568

345

65%

436

230

90%

Profit after tax ($m)

89

70

27%

116

27

330%

Capital expenditure ($m)

393

291

35%

211

151

40%

Decommissioning expenditure ($m)

16

4

300%

5

0

100%

 


H1 2024

Energean Group

FY 2023

Energean Group

Net debt ($m) (including restricted cash)

2,902

2,849

Leverage4 (net debt / adjusted EBITDAX)

2.5x

3.1x

 

Mathios Rigas, Chief Executive of Energean, commented:

"I am pleased to report our highest ever set of half-year results, with double digit year-on-year growth in production, revenue and adjusted EBITDAX. In Israel, we achieved record monthly production, reflecting the step-up in demand during the summer and excellent uptime of the FPSO. Our operations remain resilient in the face of ongoing geopolitical developments and our day-to-day production has remained unimpacted.

 

"During this period, we also continued our track record of maximising value for our shareholders, announcing the divestment of our Egyptian, Italian and Croatian portfolio to Carlyle for more than 3x[10] the value that we paid for them. Good progress is being made towards completion, upon which we expect to reduce gross debt and return money to shareholders in line with previous announcements.

 

"Our strong operational and financial performance underpins our quarterly dividend, which we have consistently paid in line with our policy. As previously communicated, we expect to redefine our dividend policy upon Transaction closing.

 

"We have also made significant progress on our key strategic areas, from advancing our gas-focused growth projects through the Katlan FID and the start-up of Cassiopea and Location B, to progressing our decarbonisation business via the Prinos Carbon Storage project, where we anticipate receiving the storage permit for phase 1 (1 million tons of CO2 per year) in the coming months.

 

"This is only the start of a new chapter in the Energean story. The combination of operational excellence and entrepreneurial deal-making is the foundation on which a new Energean will continue to deliver for its shareholders. We continue to be committed to our objectives of consistent returns to shareholders, capital discipline and responsibly produced energy with outstanding Environmental, Social and Governance ("ESG") ratings."

 

Enquiries

 

For capital markets: ir@energean.com


Kyrah McKenzie, Investor Relations Manager 

Tel: +44 (0) 7921 210 862



For media: pblewer@energean.com


Paddy Blewer, Corporate Communications Director & Head of CSR

Tel: +44 (0) 7765 250 857

 

 

Conference call

A webcast will be held today at 08:30 BST / 10:30 Israel Time.

Webcast: https://brrmedia.news/ENOG_HY_24

Dial-In: +44 (0) 33 0551 0200

Dial-in (Israel only): +972 (0) 3 376 1321

Confirmation code (if prompted): Energean Half Year

The presentation slides will be made available on the website shortly www.energean.com.

 

 

 

 

 

Energean Operational Review

Production

Energean continued to deliver strong production levels in H1 2024. Group average working interest production was 146 kboed (82% gas), up 38% year-on-year, primarily as a result of the start up of Karish North and the completion of the second gas export riser in Israel.

 

H1 2024

Kboed

H1 2023

Kboed

H1 %

change

Eight-months to 31 August 2024

Kboed

Israel

104

(inc. 2.5 bcm of

sales gas)

70

(inc. 1.8 bcm of

sales gas)

49%

113

(inc. 3.7 bcm of sales gas)

Europe

2.1

1.6

31%

2.1

Total continuing operations

106

72

47%

115

Disposal Group

40 (inc. 31 in Egypt)

34 (inc. 25 in Egypt)

18%

39 (inc. 31 in Egypt)

Total Group production

146

106

38%

154

 

Israel

Production

In the 6-months to 30 June 2024, working interest production from Israel averaged 104 kboed (86% gas). Gas production increased by 44% year-on-year primarily due to the start-up of Karish North and the completion of the second gas export riser. Liquids production increased by 84% year-on-year. Day-to-day production in Israel continues to be unimpacted by the ongoing geopolitical developments. FPSO uptime (excluding planned shutdowns) was 99%[11] in H1 2024.

In May 2024, the FPSO successfully completed a scheduled 5-day turnaround for routine maintenance.

In June 2024, production during the period reached record levels, with output averaging 137 kboed, as a result of strong summer gas demand. Average production in August 2024 was 139 kboed.  

Energean continues to focus on optimising production from the FPSO, including the integration of Karish North, and looks forward to bringing on M10 to provide further flexibility in its liquids and gas handling capacity.

Commercial

In line with Energean's ongoing strategy to secure long-term reliable cash flows from long-term gas contracts, a Gas Sale and Purchase Agreement ("GSPA") with Eshkol Energies Generation LTD was signed in February 2024. The contract is for the supply of an initial 0.6 bcm/yr, which commenced in June 2024, rising to 1 bcm/yr from 2032 onwards and represents circa $2 billion in revenues over the life of the 15 year contract.

Energean has also signed two contracts with two peaker stations for the supply of 0.1 bcm/yr each, commencing in October 2024 and May 2025 respectively, representing around $400 million in revenues over the life of the contracts.

Development

Karish Growth Projects

In February 2024, Karish North first gas and the completion of the second gas export riser were safely achieved.

Energean has signed a contract for the heavy lift vessel to transport and lift the second oil train, which will increase the FPSO's liquids production capacity. This lift is expected to occur in the coming months and will utilise the scheduled shutdown of production from the FPSO for routine maintenance. Post-lift, installation and commissioning activities are expected to take up to 6-months to complete, with liquids production expected to increase to 20-25 kbbl/d in H2 2025.

 

Katlan

In July 2024, Energean took FID on its Katlan development project, following the grant of the associated 30-year lease from the Ministry of Energy and Infrastructure. Capital expenditure is expected to be approximately $1.2 billion and entails:

·      Drilling: re-entry and completion of the Athena and Zeus wells.

·      Facilities: (1) Installation, amongst others, of a four-well-slot tieback capacity to a single large ~30 kilometre production line that can be used by future phases, for which Energean has awarded the integrated engineering, procurement, construction and installation ("iEPCITM") contract to TechnipFMC through its subsidiary Technip UK Limited. (2) An upgrade of the FPSO topsides related to MEG treatment, injection and storage (which will benefit all future subsea tie-back developments).

First gas is planned for H1 2027.

 

Morocco

In April 2024, Energean completed the farm-in to Chariot Limited's ("Chariot", AIM:CHAR) acreage offshore Morocco.

 

In August 2024, Energean (W.I. 45%; operator), alongside its partners Chariot (30%) and ONHYM (25%), started drilling the Anchois-3 appraisal well using the Stena Forth drillship on the Lixus licence. Drilling operations on the licence continue, with preliminary analysis indicating volumes found in the Anchois-3 well are lower than pre-drill estimates. Further updates will follow once Anchois-3 ST drilling operations and ongoing technical evaluation are complete.

 

Greece

The Prinos Carbon Storage project (W.I. 100%), which has the potential to store up to 3 million tons of CO2 per year over 25 years, is one of the largest and most advanced carbon storage projects in Southern Europe.

 

Energean, through its subsidiary EnEarth, has made good progress during 2024, with the Storage Permit application and the Environmental Impact Assessment submitted for the project's first phase of 1 million tons of CO2 per year. Energean anticipates that it will receive the storage permit for phase 1 in the coming months. FEED activities for the second phase, which targets to establish a facility with a capacity of up to 3 million tons of CO2 per year, are progressing.

 

UK

Energean is focused on optimising production from its late life assets and effectively managing its decommissioning projects.

 

An infill well was drilled on the Scott field (W.I. 10%) in H1 2024 and is expected to be brought online later this year. In 2025, an injector well on the Scott field is expected to be drilled.

 

In July 2024, Energean UK Limited awarded a contract to Petrodec UK Limited ("Petrodec") for the decommissioning of the Tors (W.I. 68%; operator) and Wenlock (W.I. 80%; operator) assets. This contract includes: the plugging and abandoning of eight platform wells with optional scope for one E&A well, the removal of three platforms and the cleaning of inter-field pipelines. Total net decommissioning expenditure for Tors and Wenlock is expected to be around GBP 80 million over the next five years and includes expenditure outside of the Petrodec contract for, amongst others, operational and project management costs, regulatory fees and subsea remediation works.

 

Strategic sale of Egypt, Italy & Croatia portfolio targeted to complete by year-end 2024

In June 2024, Energean entered into a binding agreement for the sale of its portfolio in Egypt, Italy and Croatia to an entity controlled by Carlyle for an enterprise value ("EV") of up to $945 million, of which $820 million is firm. This represents more than a 3x[12] return since the portfolio was acquired for $284 million in 2020. The economic effective date of the Transaction is 31 December 2023.

This sale enables Energean to rationalise the portfolio and focus on its gas-weighted, gas-development strategy. It also optimises the portfolio by divesting later life assets, removing over 60% of the Group's decommissioning liabilities, and improving free cashflow generation in the short to medium-term.

Completion is targeted by year end-2024, with all regulatory and antitrust approvals having been submitted to the relevant authorities. Carlyle received unconditional clearance from the Italian Competition Authority in August and approval of the Italian Presidency of the Council of Ministers in September, in respect of the Italian Golden Power Law.

Disposal group - operational update

Working interest production from Egypt, Italy and Croatia in H1 2024 averaged 40 kboed (75% gas), up 18% year-on-year due to the completion of NEA/NI (Egypt) in December 2023 and the start-up of the NAQPII#2 infill well on the Abu Qir field in January 2024.

 

Egypt

In March 2024, the Orion X1 exploration well (W.I. 19%) reached the target reservoir. Post-drilling well analysis indicates no commercial hydrocarbons.

 

In August 2024, Energean (W.I. 100%) brought the Location B infill well on the Abu Qir licence in Egypt onstream.

 

Italy

In August 2024, initial test production began from one of the four subsea wells on the Cassiopea field, offshore Italy (W.I. 40%). The remainder of the wells and associated facilities are expected to be brought online, tested and commissioned over the coming months.

 

ESG and climate change

 

Energean is committed to net zero emissions by 2050 and industry-leading disclosure of its energy transition intentions.

 

Energean's scope 1 and 2 emissions intensity in H1 2024 was 8.5 kgCO2e/boe, a 20% reduction versus H1 2023. This year-on-year reduction was primarily driven by: (1) the growth of production in Israel which has a lower emissions intensity compared to the wider group and (2) reduced fugitive methane emissions in Egypt following Leak, Detection and Repair ("LDAR") campaigns. The Group's 2024 emissions intensity is expected between 8.5-9.0 kgCO2e/boe.     

Scope 1 and 2 emissions intensity for the continuing operations1 was 6.2 kgCO2e/boe. Post-close the Group's scope 1 and 2 emissions intensity will reduce by around 40% to ~5 kgCO2e/boe, accelerating its 2035 target of 4-6 kgCO2e/boe by 10 years.

ESG reporting and ratings

Energean is pleased to report, following Sustainalytics' May 2024 update, that it continues to be ranked in the top quartile of its sector, ranking 46 out of 307 oil and gas producers.

Financing

As announced in June 2024, Energean expects sufficient cash proceeds at closing of the Transaction to repay in full the $450 million PLC Corporate Bond.

Energean intends to refinance its 2026 Energean Israel Limited bond to maintain an efficient capital structure, freeing up liquidity for its Katlan development.

Full Year 2024 guidance

 


Group

Continuing operations

Total production (kboed)

155 - 165 (narrowed from 155 - 175)

115-125




Consolidated net debt ($ million)

2,900-3,000 (increased from 2,800 - 2,900)

-




Cash Cost of Production (operating costs plus royalties; $ million)

550-600 (reduced from 570-630)

375-405




Development & production capital expenditure ($ million)

600-700* (increased from 500-600)

320-380




Exploration expenditure ($ million)

115-150 (reduced from 120-155)

80-105


 

 

Decommissioning expenditure ($ million)

40-50 (unchanged)

15-20

 

*Energean's development and production capital expenditure guidance includes Katlan and Location B expenditure. However, under IFRS accounting standards, the H1 2024 results classifies this expenditure under exploration and appraisal expenditure.



 

Energean Financial Review

Financial results summary

 


H1 2024

Energean Group[13]

H1 2023

Energean Group1

Increase/ (Decrease) %

H1 2024

Continuing operations

H1 2023

Continuing operations

Increase/ (Decrease) %

Average daily working interest production (kboed)

146

106

38%

106

72

47%

Sales revenue ($m)

867

588

47%

643

376

71%

Realised weighted average liquid price ($/boe)

74.8

65.1

15%

79.8

71.0

12%

Realised weighted average gas ($/mcf)

4.6

5.2

-12%

4.3

4.4

-2%

Cash cost of production[14] ($m)

271

231

17%

189

139

36%

Cash cost of production per barrel ($/boe)

10

12

-17%

10

11

-9%

Cash G&A[15]

19

18

6%

10

9

11%

Adjusted EBITDAX[16] ($m)

568

345

65%

436

230

90%

Profit after tax ($m)

89

70

27%

116

27

330%

Earnings per share (cents per share)

$0.48

$0.39

23%

$0.63

$0.17

271%

Cash flow from operating activities ($m)

527

233

126%

447

141

217%

Capital expenditure ($m)

393

291

35%

211

151

40%

 


H1 2024

Energean Group

FY 2023

Energean Group

Total borrowings ($m)

3,247

3,221

Cash and cash equivalents and restricted cash ($m)

345

372

Net debt ($m) (including restricted cash)

2,902

2,849

Leverage Ratio (Net Debt/ Adjusted EBITDAX)

2.5x

3.1x

 

Revenue, production and commodity prices

Group

Group working interest production averaged 146 kboed with the Karish and Karish North fields contributing over 70% of total output. Increased production in Israel compared to the previous year, coupled with full-period production from NEA/NI, led to a 38% increase in group production output during H1 2024. However, this was partially offset by an 11% decrease in gas production in Italy, while oil production remained stable. Despite regional variations, the overall group production mix remained consistent at 82% gas and 18% liquids (H1 2023: 82% gas and 18% liquids).

H1 2024 revenue in Group level totalled $867 million, reflecting a 47% increase from the prior period (H1 2023: $588 million). This growth was primarily driven by sales from Israel, which accounted for 70% of Group total revenue (H1 2023: 59%).

The weighted average realised gas price for the Group was $4.6/mcf, 12% lower than in H1 2023 of $5.2/mcf leading to an 8% year-on-year decline in revenue. Gas prices in Italy were subdued at the beginning of 2024, leading to an average realised PSV price of $10.0/mcf (H1 2023: $16.7/mcf), resulting in a 7% decline in revenue year-on-year. Total gas sales increased by 25% to $504 million (H1 2023: $403 million), driven by higher sales volumes.

Total liquid, crude, and petroleum product sales reached $361 million for the period (H1 2023: $182 million) and a realised weighted average liquid price of $74.8/boe (H1 2023: $65.1/boe). The higher liquids prices realised in H1 2024 contributed to a 15% increase in total revenue compared to the prior period.

Adjusted EBITDAX for the period was $568 million (H1 2023: $345 million). The overall 65% increase was primarily driven by higher revenue, combined with a 17% reduction in cash production costs per boe, half of which was attributed to continuing operations.

Continuing operations

Working interest production from continuing operations averaged 106 kboed, with the Karish and Karish North fields contributing 98% of total output. Increased production in Israel compared to the previous year, led to a 47% increase in production output during H1 2024. The production mix was at 85% gas and 15% liquids (H1 2023: 89% gas and 11% liquids). Notably, production in Greece and the UK each grew by 31% compared to H1 2023.

Revenue from continuing operations rose to $643 million, a 71% increase compared to the previous period (H1 2023: $376 million). This growth was primarily driven by sales from Israel, which accounted for 94% of revenue from continuing operations (H1 2023: 93%).

Gas sales from continuing operations increased by 45% to $389 million (H1 2023: $268 million), due to higher sales volumes.

Liquid, crude, and petroleum product sales reached $252 million (H1 2023: $106 million), and a realised weighted average liquid price of $79.8/boe (H1 2023: $71.0/boe). The higher liquids prices realised in H1 2024 contributed to a 10% increase in total revenue compared to the prior period. During H1 2024, the average Brent oil price was $83.5/bbl (H1 2023: $79.6/bbl).

Adjusted EBITDAX for the period was $436 million (H1 2023: $230 million). The overall 90% increase primarily driven by higher revenue, combined with a 9% reduction in cash production costs per boe, half of which was attributed to continuing operations.

Underlying cash production costs

 

Group

Total cash production costs for the period were $271 million (H1 2023: $231 million) with 61% attributed to production in Israel. Cash production costs for the rest of the Group, excluding Israel, amounted to $107 million (H1 2023: $123 million). Unit costs for the period were $10/boe (H1 2023: $12/boe), primarily reflecting the impact of increased production on a largely fixed cost base. As detailed in note 5 of the financial statements, royalties-payable in Italy and Israel-are a significant component of production costs. Excluding royalties, production costs would be $155 million (H1 2023: $158 million) with a representative unit cost of $6/boe (H1 2023: $8/boe).

Continuing operations

Cash production costs for the period were $189 million (H1 2023: $139 million), with 87% attributed to production in Israel. Unit costs for the period were $10/boe (H1 2023: $11/boe), decreased by 9% from the previous period. As detailed in note 5 of the financial statements, royalties-payable in Israel-are a significant component of production costs. Excluding royalties, production costs would be $83 million (H1 2023: $76 million), with a representative unit cost of $4/boe (H1 2023: $6/boe).

 

Depreciation

 

Group

Depreciation charges on production and development assets rose to $184 million (H1 2023: $116 million). The growth was driven by increased production in Israel and Egypt. In Egypt, depreciation charges increased by 129% to $46 million (H1 2023: $20 million), while Israel's charges increased by 55% to $124 million (H1 2023: $80 million). On a per barrel of oil equivalent basis, this represented a 15% increase, rising to $7/boe (H1 2023: $6/boe).

Continuing operations

Depreciation charges on production and development assets rose to $132 million (H1 2023: $84 million) primarily due to the 55% increase in Israel's charges to $124 million (H1 2023: $80 million).

 

Exploration and evaluation expenditure and new ventures

 

Group

During the period, the Group expensed $79 million (H1 2023: $2 million) for exploration and new venture evaluation activities. Total impairment costs of $76 million were recognised during the period for projects that will not progress to development. In 2024, the Orion X1 exploration well in Egypt reached the target reservoir but indicated no commercial hydrocarbons, resulting in a full impairment of the related exploration asset valued at $61 million. Additionally, the exploration license for Ioannina expired on 2 April 2024, leading to a full impairment of the exploration asset valued at $15 million.

Continuing operations

During the period, $16 million (H1 2023: $1 million) were expensed for exploration and new venture evaluation activities. Impairment costs of $15 million were recognised during the period for Ioannina license which expired on 2 April 2024, leading to a full impairment of the exploration asset.

 

Other income and expenses

 

Group

Other expenses increased to $7 million (H1 2023: $2 million). The $7 million in other expenses primarily consists of $4 million in transaction costs related to ECL Group disposal and $1 million expected credit loss provision on trade receivables within the disposal group. Other income totalled $2 million (H1 2023: $7 million), mainly due to the reversal of prior period provisions, reassessed in the current year based on updated facts and circumstances.

 

Continuing operations

Other expenses from continuing operations increased to $4 million (H1 2023: $1 million). The $4 million in other expenses primarily consists of the $4 million in transaction costs related to ECL Group disposal. Other income from continuing operations totalled $1 million, unchanged from the prior period (H1 2023: $1 million).

 

Finance income / costs

 

Group

Total finance costs in H1 2024 amounted to $138 million (H1 2023: $114 million). Total financing costs before capitalisation were $143 million.  The finance costs included $100 million in interest expense on Senior Secured notes, $8 million on debt facilities, $1 million in interest expense related to long-term payables, $30 million from the unwinding of discounts on contingent consideration, long-term payables, and decommissioning provisions, and $4 million in commissions for guarantees and other bank charges. Net finance costs also reflect foreign exchange gains of $11 million and finance income of $5 million, which includes interest income from time deposits.

Continuing operations

Total finance costs in H1 2024 for continuing operations amounted to $122 million (H1 2023: $103 million). Total financing costs before capitalisation were $127 million.  The finance costs included $100 million in interest expense on Senior Secured notes, $8 million on debt facilities, $1 million in interest expense related to long-term payables, $14 million from the unwinding of discounts on contingent consideration, long-term payables, and decommissioning provisions, and $4 million in commissions for guarantees and other bank charges. Net finance costs also reflect finance income of $5 million, which includes interest income from time deposits.

 

Taxation

Group

The Group had a tax expense of $86 million in H1 2024 (H1 2023: $65 million), consisting of a current tax expense of $52 million and a deferred tax expense of $34 million, resulting in an effective tax rate of 49% (up from 48% in H1 2023). The increase in tax expense compared to the prior period is primarily due to higher taxable profits and changes in deferred tax, largely driven by the utilisation of tax losses in Israel and Italy.

Taxation charges in H1 2024 also included $19 million (H1 2023: $26 million) related to non-cash taxes deducted at source in Egypt and $12 million deferred tax expense related to changes in the decommissioning provision in Italy.

Continuing operations

Tax charges for continuing operations totalled $46 million (H1 2023: $20 million), including $30 million in corporation tax charges and $16 million in deferred tax charges.

 

Profit after tax

Group

Profit after tax was $89 million (H1 2023: $70 million). The increase in profit compared to the prior period is primarily due to higher taxable profits, despite an increased tax expense (H1 2024: $86 million versus H1 2023: $65 million). Profit before tax rose by 30% to $175 million (H1 2023: $135 million).

Continuing operations

Profit after tax from continuing operations was $116 million (H1 2023: $27 million). The increase in profit compared to the prior period is primarily due to higher taxable profits, despite an increased tax expense (H1 2024: $46 million versus H1 2023: $20 million). Profit before tax rose by 245% to $162 million (H1 2023: $47 million).

 

Earnings per share

Group

In H1 2024, earnings per share were $0.48 (H1 2023: $0.39), with diluted earnings per share remaining the same.

Continuing operations

Earnings per share from continuing operations were $0.63 (H1 2023: $0.17). The diluted earnings per share for continuing operations were also $0.63 (H1 2023: $0.16), reflecting mainly the impact of convertible loan notes in H1 2023.

Operating cash flow

 

Group

In H1 2024, the Group had a net cash inflow from operations of $527 million (H1 2023: $233 million). The significant increase in operating cash flow compared to the prior period was primarily driven by the significant growth in revenues from Israel.

Continuing operations

In H1 2024, Energean recorded a net cash inflow from operations of $447 million (H1 2023: $141 million).

 

Capital Expenditures

 

Group

During the period, the Group incurred capital expenditures of $393 million (H1 2023: $292 million). The expenditures were primarily focused on development activities, including $50 million for the Karish Main Field, Second Oil Train, and the riser, as well as the Karish North Field in Israel, and $105 million for the Cassiopea field in Italy. Exploration and appraisal expenditures were mainly directed towards the Katlan field in Israel ($130 million) and the North East Hap'y and Location B developments in Egypt ($49 million). Additionally, in April 2024, the Group invested $13 million to acquire licenses for the Anchois gas development in Morocco.

Continuing operations

During the period, capital expenditures of $211 million related to continuing operations (H1 2023: $151 million) were incurred. The expenditures were primarily focused on development and exploration activities in Israel as discussed above in addition to investment to acquire licenses in Morocco.

 

Decommissioning provision

A total change in the decommissioning provision of less than $1 million (H1 2023: $22 million) was expensed during the period. An impairment reversal of $3 million related to discontinued operations, resulting from a decrease in the decommissioning provision estimate in Italy due to increased discount rates, was partially offset by an additional impairment charge of $3 million in the UK (continuing operations). In H1 2024, the Group spent $16 million on decommissioning activities, including $5 million on the Tors and Wenlock decommissioning related to continuing operations, and $11 million in Italy related to discontinued operations. (H1 2023: $4 million).

 

Net Debt

As of 30 June 2024, net debt totalled $2,902 million (FY23: $2,849 million), comprising $2,625 million in Israeli senior secured notes, $450 million in corporate senior secured notes, and $105 million from the Greek Black Sea Trade Development Bank loan, offset by deferred amortized fees and cash, bank deposits, and restricted cash balances of $345 million (including $86 million of restricted cash). In the debt capital markets, Energean is only exposed to floating interest rates for the Greek loan and Revolving credit facility, while the Senior Secured Notes at both Energean Plc and Energean Israel carry fixed interest rates.

 

Shareholder Distributions

In line with the Group's dividend policy, Energean returned US$0.60 per share to shareholders in H1 2024, totalling $110 million, representing two-quarters of dividend payments. In H1 2023, Energean returned US$0.60 per share.



 

Non-IFRS measures

The Group uses certain measures of performance that are not specifically defined under IFRS or other generally accepted accounting principles. These non-IFRS measures include adjusted EBITDAX, underlying cash cost of production and G&A, capital expenditure, net debt and leveraging.

 

Adjusted EBITDAX

Adjusted EBITDAX is a non-IFRS measure used by the Group to measure business performance. It is calculated as profit or loss for the period, adjusted for discontinued operations, taxation, depreciation and amortisation, share-based payment charge, impairment of property, plant and equipment, other income and expenses, net finance costs and exploration costs. The Group presents adjusted EBITDAX as it is used in assessing the Group's growth and operational efficiencies because it illustrates the underlying performance of the Group's business by excluding items not considered by management to reflect the underlying operations of the Group.

 


H1 2024

Continuing operations

H1 2023

Continuing operations


$m

$m

Adjusted EBITDAX

436

230

Reconciliation to profit for the period:



Depreciation and amortisation

(132)

(84)

Share-based payment charge

(4)

(3)

Exploration and evaluation expense

(16)

(1)

Change in decommissioning provision

(3)

7

Expected credit loss

-

(1)

Other (expenses)/income

(2)

2

Finance income

5

3

Finance cost

(122)

(103)

Net foreign exchange loss

-

(3)

Taxation expense

(46)

(20)

Profit for the period

116

27

 

While adjusted EBITDAX excludes the financial results of discontinued operations by definition, the Group has chosen to present equivalent non-IFRS financial metrics for the entire Energean Group, including discontinued operations, for comparison purposes.


H1 2024

Energean Group

H1 2023

Energean Group


$m

$m

Adjusted EBITDAX

568

345

Reconciliation to profit for the period:



Depreciation and amortisation

(184)

(116)

Share-based payment charge

(4)

(3)

Exploration and evaluation expense

(79)

(2)

Change in decommissioning provision

-

22

Expected credit loss

(1)

(1)

Other (expenses)/income

(3)

6

Finance income

5

7

Finance cost

(138)

(114)

Net foreign exchange loss

11

(9)

Taxation income / (expense)

(86)

(65)

Profit for the period

89

70

 

Cash Cost of Production

Cash Cost of Production is a non-IFRS measure that is used by the Group as a useful indicator of the Group's underlying cash costs to produce hydrocarbons. The Group uses the measure to compare operational performance period-to-period, to monitor cost and assess operational efficiency. Cash cost of production is calculated as cost of sales, adjusted for depreciation and hydrocarbon inventory movements.

 

 


H1 2024

Energean Group

H1 2023

Energean Group

H1 2024

Continuing operations

H1 2023

Continuing operations


$m

$m

$m

$m

Cost of sales

461

338

327

221

Adjusted for:





Depreciation

(181)

(113)

(131)

(83)

Change in inventory

(9)

6

(7)

1

Cost of production

271

231

189

139

Total production for the period (MMboe)

26,650

19,173

19,364

13,050

Cost of production per boe ($/boe)

10.2

12.0

9.8

10.6

 

Cash General & Administrative Expense (G&A)

Cash G&A excludes certain non-cash accounting items from the Group's reported G&A. Cash G&A is calculated as follows: administrative and distribution expenses, excluding depletion and amortisation of assets and share-based payment charge that are included in G&A.

 


H1 2024 Energean Group

H1 2023

Energean Group

H1 2024

Continuing operations

H1 2023

Continuing operations


$m

$m

$m

$m

Administrative expenses

26

23

15

12

Less:





Depreciation

(3)

(3)

(1)

(1)

Share-based payment charge included in G&A

(4)

(3)

(3)

(2)

Cash G&A

19

18

10

9

 

The Group's total cash G&A expenses for H1 2024 amounted to $19 million, with $10 million attributed to continuing operations. This reflects a 6% overall increase from the previous period, and a 11% increase specifically for continuing operations. The rise in costs is primarily driven by an increase in staff expenses in Israel due to ram-up of operations.

Capital Expenditure

Capital expenditure is a useful indicator of the Group's organic expenditure on oil and gas assets and exploration and appraisal assets incurred during a period. Capital expenditure is defined as additions to property, plant and equipment and intangible exploration and evaluation assets less decommissioning asset additions, right-of-use asset additions, capitalised share-based payment charge and capitalised borrowing costs:

 

 

H1 2024

Energean Group

H1 2023

Energean Group

H1 2024

Continuing operations

H1 2023

Continuing operations

 

$m

$m

$m

$m

Additions to property, plant and equipment

172

274

59

147

Additions to intangible exploration and evaluation assets

193

19

142

16

Less:





Capitalised borrowing costs

5

4

5

4

Leased assets additions and modifications

1

41

-  

13

Lease payments related to capital activities

(10)

(8)

(5)

(2)

Change in decommissioning provision

(25)

(35)

(9)

-

Total capital expenditures

393

292

211

151

Movement in working capital

(51)

(8)

16

69

Cash capital expenditures per the cash flow statement

342

284

227

220

 

Net Debt

Net debt is defined as the Group's total borrowings less cash and cash equivalents. Management believes that net debt serves as a valuable indicator of the Group's indebtedness, financial flexibility, and capital structure because it reflects the level of borrowings after accounting for any cash and cash equivalents that could be utilised to reduce borrowings.

 

 

Net debt reconciliation

H1 2024

Energean Group

FY 2023

Energean Group


$m

$m

Current borrowings

105

80

Non-current borrowings

3,142

3,141

Total borrowings

3,247

3,221

Less: Cash and cash equivalents

 (259)

 (347)

Less: Restricted cash held for loan repayment

 (86)

 (25)

Net Debt[17]

2,902

2,849

Net Debt Excluding Israel4

604

569

 

Going Concern

The Directors assessed the Group's ability to continue as a going concern over a going concern assessment period to 31 December 2025. As a result of this assessment, the Directors are satisfied that the Group has sufficient financial resources to continue in operation for the foreseeable future and for this reason they continue to adopt the going concern basis in preparing the condensed consolidated interim financial statements. Detail of the Group's going concern assessment for the period can be found within note 2.2 of the condensed consolidated interim financial statements.

 

Subsequent Events

In July 2024, management made a final investment decision for the Katlan development project in Israel. The carrying value of the exploration asset at 30 June 2024 was $207 million. The Katlan area will be developed in a phased approach through a subsea tieback to the existing Energean Power FPSO, which currently serves the Karish and Karish North fields. The first gas production is expected in the first half of 2027.

 

In August 2024, first gas production was achieved at the Cassiopea field, located offshore in Italy.

 

In August 2024, the prospective buyer of the ECL Group obtained unconditional clearance from the Italian Competition Authority followed by approval of the Italian Presidency of the Council of Ministers in respect of the Italian Golden Power Law in September 2024.

 

 

Principal risks at half-year 2024 and key developments since the 2023 Annual Report

Effective risk management is fundamental to achieving Energean's strategic objectives and protecting its personnel, assets, shareholder value and reputation. The Board has overall responsibility for determining the nature and extent of the risks it is willing to take in achieving the strategic objectives of the Group and ensuring that such risks are managed effectively.

Key developments in relation to Energean's risks

On 19 June 2024, the Company entered into a sale and purchase agreement with CIEP Spin BidCo Limited (the "Buyer"), an entity controlled by Carlyle, regarding the strategic sale of the Company's Egyptian, Italian and Croatian portfolio. On the basis that the Transaction amounts to a significant transaction, its implementation is expected to have an impact on Energean, either as a result of the Transaction, or related to the Transaction in the sense that material risk factors will be affected by the Transaction. These material risks are described in section 3.1 as announced on 29 August 2024 pursuant to the UK Listing Rule 7.3. As the Transaction is subject to conditions being satisfied by a longstop date of 20 March 2025 (or such other date as may be agreed by Energean and Carlyle), there can be no certainty that the Transaction will complete. As a result, other than the risk of the Transaction not completing, the Board has made no changes to the Group's principal risks as a result of the Transaction at this time.     

Looking to the second half of 2024, Energean highlights the following developments as important in relation to its principal risks. Since 7 October 2023 and the ongoing conflict in Israel, the magnitude of regional geopolitical risk remains elevated. Growing concerns of escalations in the Middle East have intensified the security risk in the region, as essential infrastructure systems (such as the Energean Power FPSO offshore Israel) may be targets for missile fire and sabotage operations. While the Karish field has continued to produce in line with guidance and with no disruption to its production since the start of the conflict, any event that impacts production from this field could have a material adverse impact on the business, results of operations, cash flows, financial condition and prospects of the Group. In the first half of 2024, Energean has ensured that all measures are in place to continue business operations, maintain the mobility of our people and make certain that the security of information is unaffected.

Despite these challenges, Energean has achieved a number of positive milestones during the first half of 2024, including: (i) the start-up of Karish North and the second gas export riser installation, which enables Energean to utilise the FPSO's maximum capacity; (ii) FID on Katlan with first gas planned for H1 2027; (iii) good progress on the Cassiopea gas development, with initial test production from one of the four subsea wells started in August 2024 and; (iv) success at the Abu Qir infill well drilling campaign in Egypt, with first gas achieved in August 2024.

Principal risks and uncertainties

Energean has closely monitored its risks and uncertainties throughout the year and has identified one new principal risk, which is detailed below. All other principal risks that the Group will be exposed to in the second half of 2024, alongside the trends and developments as highlighted above, are the same as those described in the principal risks section in Energean's 2023 Annual Report (pages 85-96) and are summarised below.

Overview of key risks and principal uncertainties since 31 December 2023

1.     Strategic risk: Regional and domestic geopolitical and security risks in Israel

2.     Operational risk: Delayed delivery of further growth projects

3.     Strategic risk: Lack of new commercial discoveries and reserves replacement

4.     Operational risk: Production uptime reliability and operating efficiency (including reliability of the production systems, i.e. FPSO and subsea)

5.     Financial risk: Maintaining liquidity and solvency

6.     Macro-economic risk (including inflation, interest rates and commodity price fluctuations)

7.     Organisational & HR risk: Failure to attract, retain and develop staff

8.     Deterioration or misalignment of JV relationships risk

9.     Recoverability of production cost and receivables in Egypt risk

10.  Significant IT and OT cyber risk, including a security breach of internal systems or a cyber attack

11.  Ethics and Business Conduct. Fraud, Bribery and corruption risk

12.  Health Safety and Environment (HSE) risk

13.  Failure to manage the risk of climate change and to adapt to the energy transition

14.  Climate Change risk: Physical risks

15.  Strategic risk: Geopolitical conflicts outside of Israel in areas of operation affecting production and distribution (including fiscal uncertainties)

16.  New: Risk of the Transaction not proceeding

The Transaction is conditional upon the satisfaction or, where applicable, waiver of the following conditions: (1) regulatory approvals in Italy and Egypt; (2) anti-trust approvals in Italy, Egypt and COMESA; and (3) transfer of the North Sea Assets from Energean Capital Limited to a member of the Group. Progress is ongoing to satisfy or, where permitted, waiver these conditions by the long stop date of 20 March 2025. Although Energean is optimistic about achieving these conditions by the long stop date, the Group recognises that there is a residual risk that the conditions may not be met. Failure to satisfy or obtain waiver of any condition may result in the Transaction not being completed. The Sale and Purchase Agreement may also be terminated for any breach of certain fundamental warranties and the occurrence of certain material adverse events affecting the Target Group following signing, subject to customary rights to remedy.

 If the Transaction is not completed, or the Sale and Purchase Agreement is terminated, the Group will not receive any of the consideration payable in respect of it. This would prejudice its ability to create shareholder value by being unable to repay the 2027 PLC Notes in full prior to their scheduled maturity and facilitate a special dividend of up to $200 million.

If Completion does not occur, or the Sale and Purchase Agreement is terminated, the Company will also have incurred significant costs and management time in connection with the Transaction, which it will not be able to recover (other than through the Non-Completion Payment, to the extent applicable). It will also not realise the anticipated benefits of the Transaction and its ability to implement its stated strategy may be prejudiced.



 

Statement of Directors' responsibilities

The Directors confirm that, to the best of their knowledge:

·      The condensed consolidated interim financial statements have been prepared in accordance with IAS 34 'Interim Financial Reporting' as adopted in the United Kingdom.

·      The interim management report includes a fair review of the information required by the Disclosure Transparency Rules (DTR) 4.2.7R, namely an indication of important events during the six months ended 30 June 2024 and a description of the principal risks and uncertainties for the remaining six months of the financial year.

·      The interim management report includes a true and fair view of the information required by the DTR 4.2.8R, including disclosure of related party transactions and any changes therein during the reporting period.

 

 


 

Mathios Rigas

Chief Executive Officer

Panos Benos

Chief Financial Officer

10 September 2024

10 September 2024

 

Forward looking statements

This announcement contains statements that are, or are deemed to be, forward-looking statements. In some instances, forward-looking statements can be identified by the use of terms such as "projects", "forecasts", "on track", "anticipates", "expects", "believes", "intends", "may", "will", or "should" or, in each case, their negative or other variations or comparable terminology. Forward-looking statements are subject to a number of known and unknown risks and uncertainties that may cause actual results and events to differ materially from those expressed in or implied by such forward-looking statements, including, but not limited to: general economic and business conditions; demand for the Company's products and services; competitive factors in the industries in which the Company operates; exchange rate fluctuations; legislative, fiscal and regulatory developments; political risks; terrorism, acts of war and pandemics; changes in law and legal interpretations; and the impact of technological change. Forward-looking statements speak only as of the date of such statements and, except as required by applicable law, the Company undertakes no obligation to update or revise publicly any forward-looking statements, whether as a result of new information, future events or otherwise. The information contained in this announcement is subject to change without notice.

Numbers outside of the unaudited consolidated interim financial statements, where applicable, are rounded to the nearest  million US$ and therefore may differ in the order of a million US$.


 

INDEPENDENT REVIEW REPORT TO ENERGEAN PLC

 

Conclusion

We have been engaged by the Company to review the condensed set of financial statements in the half-yearly financial report for the six months ended 30 June 2024 which comprises the interim consolidated income statement, the interim consolidated statement of comprehensive income, the interim consolidated statement of financial position, interim consolidated statement of changes in equity, the interim consolidated statement of cash flows and the related explanatory notes 1 to 29. We have read the other information contained in the half-yearly financial report and considered whether it contains any apparent misstatements or material inconsistencies with the information in the condensed set of financial statements.

Based on our review, nothing has come to our attention that causes us to believe that the condensed set of financial statements in the half-yearly financial report for the six months ended 30 June 2024 is not prepared, in all material respects, in accordance with UK adopted International Accounting Standard 34 and the Disclosure Guidance and Transparency Rules of the United Kingdom's Financial Conduct Authority.

Basis for Conclusion

We conducted our review in accordance with International Standard on Review Engagements 2410 (UK) "Review of Interim Financial Information Performed by the Independent Auditor of the Entity" (ISRE) issued by the Financial Reporting Council. A review of interim financial information consists of making enquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and other review procedures. A review is substantially less in scope than an audit conducted in accordance with International Standards on Auditing (UK) and consequently does not enable us to obtain assurance that we would become aware of all significant matters that might be identified in an audit. Accordingly, we do not express an audit opinion.

As disclosed in note 2, the annual financial statements of the group are prepared in accordance with UK adopted international accounting standards. The condensed set of financial statements included in this half-yearly financial report has been prepared in accordance with UK adopted International Accounting Standard 34, "Interim Financial Reporting".

Conclusions Relating to Going Concern

Based on our review procedures, which are less extensive than those performed in an audit as described in the Basis for Conclusion section of this report, nothing has come to our attention to suggest that management have inappropriately adopted the going concern basis of accounting or that management have identified material uncertainties relating to going concern that are not appropriately disclosed.

This conclusion is based on the review procedures performed in accordance with this ISRE, however future events or conditions may cause the entity to cease to continue as a going concern.

Responsibilities of the directors

The directors are responsible for preparing the half-yearly financial report in accordance with the Disclosure Guidance and Transparency Rules of the United Kingdom's Financial Conduct Authority.

In preparing the half-yearly financial report, the directors are responsible for assessing the company's ability to continue as a going concern, disclosing, as applicable, matters related to going concern and using the going concern basis of accounting unless the directors either intend to liquidate the company or to cease operations, or have no realistic alternative but to do so.

 

 

Auditor's Responsibilities for the review of the financial information

In reviewing the half-yearly report, we are responsible for expressing to the Company a conclusion on the condensed set of financial statements in the half-yearly financial report. Our conclusion, including our Conclusions Relating to Going Concern, are based on procedures that are less extensive than audit procedures, as described in the Basis for Conclusion paragraph of this report.

Use of our report

This report is made solely to the company in accordance with guidance contained in International Standard on Review Engagements 2410 (UK) "Review of Interim Financial Information Performed by the Independent Auditor of the Entity" issued by the Financial Reporting Council. To the fullest extent permitted by law, we do not accept or assume responsibility to anyone other than the company, for our work, for this report, or for the conclusions we have formed.

 

 

 

 

Ernst & Young LLP

London

10 September 2024

 

 

 

 


 

 

 

 

Interim Consolidated Income Statement

Six months ended 30 June 2024

 

 

 

30 June 2024 (Unaudited)

 

30 June 2023 (Unaudited/Restated *)

 

 

 

$'000

 

$'000

 

 

Note

 



 

Continuing operations:





 

Revenue

4

642,413


375,891

 

Cost of Sales

5(a)

(326,572)


(220,730)

 

Gross profit

 

315,841

 

155,161

 

Administration expenses

5(b)

(15,848)


(12,259)

 

Change in decommissioning provision

21

(2,638)


7,297

 

Exploration and evaluation expenses

5(c)

(15,898)


(680)

 

Expected credit loss

5(d)

-


(871)

 

Other expenses

5(e)

(3,960)


(577)

 

Other income

5(f)

1,088


1,118

 

Operating profit

 

278,585

 

149,189

 

Finance Income

6

5,003


3,196

 

Finance Costs

6

(121,757)


(102,732)

 

Unrealised loss on derivatives

7

(7)


-

 

Net foreign exchange loss

6

(60)


(2,567)

 

Profit before tax from continuing operations

 

161,764

 

47,086

 

Taxation expense

8

(45,895)


(19,762)

 

Profit for the period from continuing operations

 

115,869

 

27,324

 

Discontinued operations:





 

(Loss)/Profit for the period from discontinued operations

24

(27,332)


42,434

 

Profit for the period


88,537

 

69,758

 

 





 

Attributable to:





 

Owners of the parent


88,537


69,758

 



88,537

 

69,758

 

 





 

Basic and diluted earnings per share (cents per share)

 

Basic


$0.48


$0.39

 

Diluted


$0.48


$0.39

 

Basic and diluted earnings per share for continuing operations (cents per share)


 


 

 

Basic

9

$0.63


$0.17

 

Diluted

9

$0.63


$0.16

 

 

 

*Restated for discontinued operations, refer to Note 24 for further detail.

Interim Consolidated Statement of Comprehensive Income

Six months ended 30 June 2024

 

 

 

 


30 June 2024 (Unaudited)

 

30 June 2023 (Unaudited/Restated *)

 



$'000

 

$'000

 

Profit / (Loss) for the period from:

 





Continuing operations

 

115,869


27,324


Discontinued operations

 

(27,332)


42,434


Profit for the period

 

88,537

 

69,758


Other comprehensive income:

 




 

Items that may be reclassified subsequently to profit or loss





 

Cash Flow hedges:





 

Loss arising in the period


(407)


-

 

Income tax relating to items that may be reclassified to profit or loss


94


-

 

Exchange difference on the translation of foreign operations, net of tax


(14,701)


489

 

Items that will not be reclassified subsequently to profit or loss





 

Remeasurement of defined benefit plan


13


(107)

 

Income taxes on items that will not be reclassified to profit and loss


(3)


26

 

Other comprehensive (loss) / profit after tax

 

(15,004)

 

408

 






 

Total comprehensive profit for the period

 

73,533

 

70,166

 

 





 

Total comprehensive profit attributable to:

 




 

Owners of the parent


73,533


70,166

 

 

 

73,533

 

70,166

 

 

 

*Restated for discontinued operations, refer to Note 24 for further detail.

 

 


 

Interim Consolidated Statement of Financial Position

As at 30 June 2024

 


 

 

30 June 2024 (Unaudited)

 

31 December 2023

(Audited)

 

Note

$'000

 

$'000

ASSETS





Non-current assets

 




Property, plant and equipment

10

3,290,323


4,371,325

Intangible assets

11

397,418


325,389

Equity-accounted investments


-


4

Other receivables

16

32,315


33,682

Deferred tax asset

12

87,121


217,504

Restricted cash

14

3,036


3,124



3,810,213


4,951,028

Current assets

 




Inventories

15

36,944


110,126

Trade and other receivables

16

149,885


353,257

Restricted cash

14

82,538


22,482

Cash and cash equivalents

13

230,779


346,772

Assets held for sale

24

1,557,816


-



2,057,962


832,637

Total assets

 

5,868,175

 

5,783,665

 





EQUITY AND LIABILITIES

 




Equity attributable to owners of the parent

 




Share capital

17

2,449


2,449

Share premium

17

465,331


465,331

Merger reserve


139,903


139,903

Other reserves


5,672


5,975

Foreign currency translation reserve


(13,065)


1,636

Share-based payment reserve


37,027


32,917

Retained earnings


16,606


37,904

Total equity

 

653,923

 

686,115

Non-current liabilities

 




Borrowings

19

3,141,525


3,141,197

Deferred tax liabilities

12

141,748


122,785

Retirement benefit liability

20

448


1,595

Provisions

21

262,398


786,362

Trade and other payables

22

102,043


166,923



3,648,162


4,218,862

Current liabilities

 




Trade and other payables

22

342,478


737,603

Current portion of borrowings

19

105,000


80,000

Current tax Liability


29,702


9,261

Derivative financial instruments

7

406


-

Provisions

21

44,898


51,824

Liabilities held for sale

24

1,043,606


-



1,566,090


878,688

Total liabilities

 

5,214,252

 

5,097,550

Total equity and liabilities

 

5,868,175

 

5,783,665

 

 

 

 

 

 

 

 

 

Mathios Rigas

Chief Executive Officer

Panos Benos

Chief Financial Officer

10 September 2024

10 September 2024


Interim Consolidated Statement of Changes in Equity

Six months ended 30 June 2024

 

 


 

 

Share Capital

Share Premium21

Hedges and defined benefit plans reserve22

Equity

component

of convertible

bonds23

Share based payment reserve 24

Translation reserve25  

Retained earnings

Merger reserve

Total

 

$'000

$'000

$'000

$'000

$'000

$'000

$'000

$'000

$'000

At 1 January 2024

2,449

465,331

5,975

-

32,917

1,636

37,904

139,903

686,115

Profit for the period

-

-

-

-

-

-

88,537

-

88,537

Remeasurement of defined benefit pension plan, net of tax

-

-

10

-

-

-

-

-

10

Cashflow hedge, net of tax

-

-

(313)

-

-

-

-

-

(313)

Exchange difference on the translation of foreign operations

-

-

-

-

-

(14,701)

-

-

(14,701)

Total comprehensive income

-

-

(303)

-

-

(14,701)

88,537

-

73,533

Transactions with owners of the company




 





 

Share based payment charges (note 23)

-

-

-

-

4,110

-

-

-

4,110

Dividends (note 18)

-

-

-

-

-

-

(109,835)

-

(109,835)

At 30 June 2024 (Unaudited)

2,449

465,331

5,672

-

37,027

(13,065)

16,606

139,903

653,923

21 The share premium account represents the total net proceeds on issue of the Company's shares in excess of their nominal value of £0.01 per share less amounts transferred to any other reserves.

22 The reserve is used to recognise remeasurement gain or loss on cash flow hedges and actuarial gain or loss from the defined retirement benefit plan. In the Statement of Financial Position this reserve is combined with the Equity component of convertible bonds' within the caption 'Other reserves'.

23 Refers to the Equity component of $50 million of convertible loan notes, which were issued in February 2021 and converted into equity at maturity in December 2023. In the Statement of Financial Position this reserve is presented within the caption 'Other reserves'.

24 The share-based payment reserve is used to recognise the value of equity-settled share-based payments granted to parties including employees and key management personnel, as part of their remuneration.

25 The translation reserve is used to record unrealised exchange differences arising from the translation of the financial statements of entities within the Group that have a functional currency other than US dollar.



 

 

Interim Consolidated Statement of Changes in Equity

Six months ended 30 June 2023

 

 


Share Capital

Share Premium21

Hedges and defined benefit plans reserve22

Equity

component

of convertible

bonds23

Share based payment reserve 24

Translation reserve25  

Retained earnings

Merger reserve

Total


 

$'000

 

$'000

 

$'000

 

$'000

 

$'000

 

$'000

 

$'000

 

$'000

 

$'000

At 1 January 2023

2,380

415,388

6,098

10,459

25,589

(5,827)

56,208

139,903

650,198

 

Profit for the period

-

-

-

-

-

-

69,758

-

69,758

 

Remeasurement of defined benefit pension plan, net of tax

-

-

(81)

-

-

-

-

-

(81)

 

Exchange difference on the translation of foreign operations

-

-

-

-

-

489

-

-

489

 

Total comprehensive income

-

-

(81)

-

-

489

69,758

-

70,166

 

Transactions with owners of the company




 





 

 

Share based payment charges (note 23)

-

-

-

 

-

3,294

-

           

-

           -

3,294

 

Exercise of employment share options

13

-

-

-

(13)

-

-

-

-

 

Dividends (note 18)

-

-

-

-

-

      -

  (106,663)

-

(106,663)

 

At 30 June 2023 (Unaudited)

2,393

415,388

6,017

10,459

28,870

 (5,338)

19,303

139,903

616,995

 

 


Interim Consolidated Statement of Cash Flows

Six months ended 30 June 2024

 

 

 

 

30 June (Unaudited)

 

 

 

2024

 

2023 (Restated)*

 

 

Note

$'000

 

$'000

 

Operating activities

 




 

Profit before taxation from continuing operations

 

161,764

 

47,086

 

Profit before taxation from discontinuing operations

 

13,221

 

87,958

 

Profit before taxation

 

174,985

 

135,044

 

Adjustments to reconcile profit before taxation to net cash provided by operating activities:





 

Depreciation, depletion and amortisation

10, 11

183,917


115,953

 

Impairment loss on exploration and evaluation assets

10, 11

76,189


-

 

Change in decommissioning provision estimates

21

(16,129)


(25,712)

 

Loss from the sale of property, plant and equipment


27


-

 

Defined benefit loss


19


72

 

Movement in other provisions


1,767


(2,425)

 

ECL on trade receivables


961


1,281

 

Compensation to gas buyers

4

-


4,928

 

Finance income

6

(5,120)


(7,316)

 

Finance costs                                          

6

137,892


113,707

 

Non-cash revenues from Egypt26


(19,269)


(25,763)

 

Share-based payment charge

23

4,110


3,294

 

Net foreign exchange (income)/loss

6

(11,145)


9,344

 

Cash flow from operations before working capital adjustments


528,204


322,407

 

Increase in inventories


(198)


(3,471)

 

Increase in trade and other receivables


(62,801)


(22,255)

 

Increase/(Decrease) in trade and other payables


63,822


(58,749)

 

Cash inflow from operations


529,027


237,932

 

Income tax paid


(1,948)


(4,918)


Net cash inflow from operating activities


527,079


233,014

 

Investing activities

 




 

Payment for purchase of property, plant and equipment

10

(262,419)


(198,355)

 

Payment for exploration and evaluation, and other intangible assets

11

(79,798)


(85,255)

 

Payment for other non-current assets


(87)


-

 

Proceeds from disposal of exploration and evaluation and other intangible


1,464


-

 

Movement in restricted cash

14

(60,065)


63,297

 

Amounts received from INGL related to the transfer of property, plant and equipment


1,801


56,906

 

Interest received


5,647


7,777

 

Net cash outflow for investing activities


(393,457)


(155,630)

 

Financing activities

 




 

Drawdown of borrowings

19

65,000


44,265

 

Repayment of borrowings

19

(40,000)



 

Transaction costs related to Senior secured notes paid


-


(1,214)

 

Dividend Paid

18

(109,835)


(106,663)

 

Repayment of obligations under leases

19

(10,253)


(7,793)

 

Finance costs paid


(125,717)


(89,925)

 

Net cash outflow from financing activities


(220,805)


(161,330)

 

Net decrease in cash and cash equivalents


(87,183)


(83,946)

 

Cash and cash equivalents at beginning of the period


346,772


427,888

 

Effect of exchange rate fluctuations on cash held


(412)


2,427

 

Cash and cash equivalents at end of the period (including cash held in disposal group)

13

259,177


346,369

 

Cash and cash equivalents held in disposal group presented as held for sale at 30 June

24

28,398


-

 

26 Non-cash revenues from Egypt arise due to taxes being deducted at source from invoices, as such revenue and tax charges are grossed up to reflect this deduction but no cash inflow or outflow results.

*Restated for discontinued operations, refer to Note 24 for further detail.


1. Corporate Information 

Energean plc (the 'Company') was incorporated in England & Wales on 8 May 2017 as a public company limited by shares, under the Companies Act 2006. Its registered office is at 44 Baker Street, London W1U 7AL, United Kingdom. The Company and all subsidiaries controlled by the Company, are together referred to as 'the Group'.

The Group has been established with the objective of exploration, production and commercialisation of crude oil, hydrocarbon liquids and natural gas in Greece, Israel, Italy, North Africa, United Kingdom ('UK') and the wider Eastern Mediterranean.

The Group's subsidiaries and core assets, as of 30 June 2024, are presented in notes 28 and 29.

 

2. Basis of preparation

2.1 Basis of preparation

The unaudited condensed consolidated interim financial statements for the six months ended 30 June 2024 included in this interim report have been prepared in accordance with UK-adopted International Accounting Standard 34 'Interim Financial Reporting' ('IAS 34'), and, unless otherwise disclosed, have been prepared on the basis of the same accounting policies and methods of computation as applied in the Group's Annual Report for the year ended 31 December 2023 subject to the following:

A.     Accounting for non-current assets held for sale and discontinued operations

On 20 June 2024, the Group publicly announced its Board of Directors' decision to sell its portfolio in Egypt, Italy, and Croatia, collectively referred to as 'Energean Capital Limited Group' (ECL), which is fully owned and controlled by the Group. The sale of ECL is expected to be completed by the end of 2024. The Group has assessed whether ECL meets the definition of being held for sale and discontinued operations.

The Group classifies an operation as discontinued when it has disposed of or intends to dispose of a business component that represents a separate major line of business or geographical area of operations. Non-current assets and disposal groups classified as held for sale are measured at the lower of their carrying amount and fair value less costs to sell. Costs to sell are the incremental costs directly attributable to the disposal of an asset disposal group), excluding finance costs and income tax expense.

The criteria for held for sale classification is regarded as met only when the sale is highly probable, and the asset or disposal group is available for immediate sale in its present condition. Actions required to complete the sale should indicate that it is unlikely that significant changes to the sale will be made or that the decision to sell will be withdrawn. Management must be committed to the plan to sell the asset and the sale expected to be completed within one year from the date of the classification. Property, plant and equipment and intangible assets are not depreciated or amortised once classified as held for sale.

Assets and liabilities classified as held for sale are presented separately as current items in the statement of financial position. The comparative balance sheet and the related notes to the financial statements have not been restated to reflect this presentation, resulting in significant fluctuations between the two reporting periods. The post-tax profit or loss of the discontinued operations is shown as a single line on the face of the consolidated statement of profit or loss, separate from the continuing operating results of the Group. When an operation is classified as a discontinued operation, the comparative consolidated statement of profit or loss is represented as if the operation had been discontinued from the start of the comparative year. Expenses are presented as discontinued if they will cease to be incurred on disposal of the discontinued operation. Transactions between continuing and discontinued operations have been consistently eliminated as intragroup balances without any adjustments for both current and comparative reporting periods.

While the completion is contingent upon securing regulatory approvals in Italy and Egypt and antitrust approvals in Italy, Egypt and COMESA, the Group is confident that the transactions will likely be finalised within 12 months of the announcement date. The disposal group is ready for immediate sale in its current state, with the exception of the transfer of legal ownership of certain assets outside the disposal group to other parts of the Energean Group. This transfer is customary in transactions of this nature.

Additional disclosures are provided in Note 24. All other notes to the financial statements include amounts for continuing operations, unless indicated otherwise.

 

B.      Exploration and evaluation expenditures: Farm-in arrangements

Farm-in transactions typically occur during the exploration or development phase and involve the transferor (the farmor) giving up future economic benefits, such as reserves, in exchange for a permanent reduction in future funding obligations.

Under a carried interest arrangement, the carried party transfers a portion of the risks and rewards of a property in exchange for a funding commitment from the carrying party. In contrast, a farm-in arrangement involves the farmor transferring all risks and rewards of a proportion of a property in exchange for the farmee's commitment to fund specific expenditures. This effectively represents the complete disposal of a proportion of the property and is similar to purchase/sale-type carried interest arrangements.

In April 2024, the Group entered into a partnership with Chariot Limited in Morocco to invest in the Anchois gas development.

As the farmee, the Group recognises its expenditure under this arrangement in the same way as directly incurred expenditure. Since the carry of Chariot's costs is conditional upon the successful commencement of production, Energean accounts for 100% of the expenses related to appraisal and other exploration activities concerning the two licences. These costs are fully capitalised on the balance sheet until the start of production.

Refer to Note 11 for further details.

The unaudited condensed consolidated interim financial statements have been prepared on a historical cost basis and are presented in US Dollars, which is also the Company's functional currency, rounded to the nearest thousand dollars ($'000) except as otherwise indicated. The US dollar is the currency that mainly influences sales prices and revenue estimates, and also highly affects the Group's operations. The functional currencies of the Group's main subsidiaries are as follows: for Energean Oil & Gas S.A, Energean Sicilia S.r.l. and Energean Italy S.p.a. the functional currency is Euro; for Energean Group Services Ltd., Energean E&P Holdings Ltd., Energean International Limited, Energean Capital Ltd., Energean Egypt Ltd., and Energean Israel Ltd. the functional currency is US$; for Energean UK Ltd. and Energean Exploration Ltd. is GBP.

The unaudited condensed consolidated interim financial statements do not constitute statutory accounts of the Group within the meaning of Section 435 of the Companies Act 2006 and do not include all the information and disclosures required in the annual financial statements. These financial statements should be read in conjunction with the Group's Annual Report for the year ended 31 December 2023, which were prepared UK-adopted International Accounting Standards ('UK-adopted IAS'). The auditor's report on those financial statements was unqualified with no reference to matters to which the auditor drew attention by way of emphasis and no statement under s498(2) or s498(3) of the Companies Act 2006.

 

2.2 Going concern

 

The Group carefully manages the risk of a shortage of funds by closely monitoring its funding position and its liquidity risk. The Going Concern assessment covers the period up to 31 December 2025 'the forecast period'.

As of 30 June 2024, the Group's available liquidity was approximately $511 million including $28 million of cash related to the disposal group. In addition to $345 million of cash and cash equivalents held by the Group at 30 June 2024, this available liquidity figure includes: (i) c. $46 million available under the $300 million Revolving Credit Facility ("RCF") signed by the Group in September 2022 and as amended in May 2023 (with the remainder being utilised to issue Letters of Credit for the Group's operations) and (ii) c. $120 million under the $120 million Revolving Credit Facility signed up by the Group in October 2023.

The going concern assessment is founded on a cashflow forecast prepared by management, which is based on a number of assumptions, most notably the Group's latest life of field production forecasts, budgeted expenditure forecasts, estimated of future commodity prices (based on recent published forward curves) and available headroom under the Group's debt facilities. The going concern assessment contains a "Base Case" and a "Reasonable Worst Case" ("RWC") scenario. The base case scenario assumes the completion of the disposal of ECL by the end of 2024 followed by the receipt of the cash consideration in January 2025.

The Base Case scenario assumes Brent at $80/bbl in 2024 and 2025 and PSV (Italian gas price) at €30/MWH in 2024 assumed throughout the going concern assessment period, with prices for gas sold assumed at contractually agreed prices for Egypt (in 2024) and Israel (in 2024-2025). Under the Base Case, sufficient liquidity is maintained throughout the going concern period.

The Group also routinely performs sensitivity tests of its liquidity position to evaluate adverse impacts that may result from changes to the macro-economic environment, such as a reduction in commodity prices. These downsides are considered in the RWC scenario. The Group is not materially exposed to floating interest rate risk since the majority of its borrowings are fixed rate. The group also looks at the impact of changes or deferral of key projects and downside scenarios to budgeted production forecasts in the RWC.

The two primary downside sensitivities considered in the RWC are: (i) reduced commodity prices; (ii) reduced production - these downsides are applied to assess the robustness of the Group's liquidity position over the Assessment Period. Within this scenario the Group also assumes the non-completion of the disposal of ECL throughout the going concern period.  In a RWC downside case, there are appropriate and timely mitigation strategies, within the Group's control, to manage the risk of funding shortfalls and to ensure the Group's ability to continue as a going concern. Mitigation strategies, within management's control, modelled in the RWC include deferral of capital expenditure on operated assets and/or management of operating expenses to improve the liquidity. Under the RWC scenario, after considering mitigation strategies, liquidity is maintained throughout the going concern period.

Reverse stress testing was also performed to determine what production shortfall could need to occur for liquidity headroom to be eliminated. The conditions necessary for liquidity headroom to be eliminated are judged to have a remote possibility of occurring, given the diversified nature of the Group's portfolio and the "natural hedge" provided by virtue of the Group's fixed-price gas contracts in Israel. In the event a remote downside scenario occurred, prudent mitigating strategies, consistent with those described above, could also be executed in the necessary timeframe to preserve liquidity. There is no material impact of climate change within the Assessment Period and therefore, it does not form part of the reverse stress testing performed by management.

In forming its assessment of the Group's ability to continue as a going concern, including its review of the forecasted cashflow of the Group over the Forecast Period, the Board has made judgements about:

• Reasonable sensitivities appropriate for the current status of the business and the wider macro environment; and

• the Group's ability to implement the mitigating actions within the Group's control, in the event these actions were required.

After careful consideration, the Directors are satisfied that the Group has sufficient financial resources to continue in operation for the foreseeable future, for the Assessment Period from the date of approval of these unaudited condensed consolidated interim financial statements on 10 September 2024 to 31 December 2025. For this reason, they continue to adopt the going concern basis in preparing these condensed consolidated interim financial statements.

 

2.3 New and amended accounting standards and interpretations

The following amendments became effective as at 1 January 2024:

·      Amendments to IAS 1 - Classification of Liabilities as Current or Non-current and Non-current Liabilities with Covenants;

·      Amendments to IFRS 16 - Lease Liability in a Sale and Leaseback;

·      Amendments to IAS 7 and IFRS 7 - Disclosures: Supplier Finance Arrangements.

The adoption of the above amendments to UK-adopted IAS did not result in any material changes to the Group's accounting policies and did not have any material impact on the financial position or performance of the Group.

 

2.4 Approval of unaudited condensed consolidated interim financial statements by Directors

These unaudited condensed consolidated interim financial statements were approved by the Board of Directors on 10 September 2024.

 

3. Segmental Reporting

The information reported to the Group's Chief Executive Officer and Chief Financial Officer (together the Chief Operating Decision Makers) for the purposes of resource allocation and assessment of segment performance is focused on three continuing operating segments: Europe (including Greece and UK), Israel, and New Ventures. The Group's reportable segments under IFRS 8 Operating Segments are Europe and Israel. Segments that do not exceed the quantitative thresholds for reporting information about operating segments have been included in Other. 

Discontinued operations consist of the Egypt segment and Italy and Croatia operations previously included in the Europe reportable segment, which are expected to be disposed of in 2024 (refer to Note 24 for further detail).

Information regarding the results of each reportable segment is included below and prior periods are represented to reflect discontinued operations to provide comparability.

 

Segment revenues, results and reconciliation to profit before tax

 

The following is an analysis of the Group's revenue, results and reconciliation to profit/ (loss) before tax by reportable segment:

 

Six months ended 30 June 2024 (unaudited)

 

Europe

Israel

Other & inter-segment transactions

Continuing operations, total

Discontinued operations

Total

$'000

$'000 

$'000

$'000

$'000

$'000

Revenue from gas sales

 775

 388,459

 -  

 389,234

 114,327

 503,561

Revenue from hydrocarbon liquids sales

 145

 213,719

 -  

 213,864

 21,726

 235,590

Revenue from crude oil sales

 37,596

 -  

 -  

 37,596

 80,669

 118,265

Revenue from LPG sales

 227

 -  

 -  

 227

 7,241

 7,468

Other

 6,640

 -  

 (5,148)

 1,492

 215

 1,707

Total revenue

 45,383

 602,178

 (5,148)

 642,413

 224,178

 866,591

Adjusted EBITDAX27

6,460

429,977

(319)

436,118

131,741

567,859

Reconciliation to profit before tax:







Depreciation and amortisation expenses

 (8,701)

 (123,559)

 245

 (132,015)

 (51,902)

 (183,917)

Share-based payment charge

(675)

(518)

(2,917)

(4,110)

-

(4,110)

Exploration and evaluation expenses

 (15,282)

 -  

 (616)

 (15,898)

 (63,096)

 (78,994)

Change in decommissioning provision

 (2,638)

 -  

 -  

 (2,638)

 3,023

 385

Expected credit (loss)

 -  

 -  

 -  

 -  

 (961)

 (961)

Other expense

 (66)

 (4)

 (3,890)

 (3,960)

 (1,525)

 (5,485)

Other income

 1,005

 -

 83

 1,088

 754

 1,842

Finance income

 853

 4,485

 (335)

 5,003

 117

 5,120

Finance costs

 (10,481)

 (93,847)

 (17,429)

 (121,757)

 (16,135)

 (137,892)

Unrealised loss on derivatives

-

(7)

-

(7)

-

(7)

Net foreign exchange gain/(loss)

 (149)

 (290)

 379

 (60)

 11,205

 11,145

Profit/(loss) before income tax

(29,674)

216,237

(24,799)

161,764

13,221

174,985

Taxation expense

 3,311

 (48,981)

 (225)

 (45,895)

 (40,553)

 (86,448)

Profit/(loss) for the period

(26,363)

167,256

(25,024)

115,869

(27,332)

88,537

 



 

 Six months ended 30 June 2023 (unaudited) (Restated*)

 

Europe

Israel

Other & inter-segment transactions

Continuing operations, total

Discontinued operations

Total

$'000

$'000 

$'000

$'000

$'000

$'000

Revenue from gas sales

1,105

266,471

-

267,576

135,653

403,229

Revenue from hydrocarbon liquids sales

4

81,272

-

81,276

14,752

96,028

Revenue from crude oil sales

24,889

-

-

24,889

53,483

78,372

Revenue from LPG sales

250

-

-

250

7,534

7,784

Other

5,403

-

(3,503)

1,900

329

2,229

Total revenue

31,651

347,743

(3,503)

375,891

211,751

587,642

Adjusted EBITDAX26

(8,607)

235,303

2,868

229,564

115,289

344,853

Reconciliation to profit before tax:







Depreciation and amortisation expenses

(4,415)

(80,049)

375

(84,089)

(31,864)

(115,953)

Share-based payment charge

(152)

(312)

(2,109)

(2,573)

(368)

(2,941)

Exploration and evaluation expenses

(279)

(50)

(351)

(680)

(1,468)

(2,148)

Change in decommissioning provision

 7,297

 -  

 -  

 7,297

 14,633

 21,930

Expected credit (loss)

(871)

 -  

 -  

(871)

(409)

(1,280)

Other expense

(571)

 -  

(6)

(577)

(292)

(869)

Other income

 938

 2

 178

 1,118

 6,069

 7,187

Finance income

 972

 1,044

 1,180

 3,196

 4,120

 7,316

Finance costs

(12,341)

(67,569)

(22,822)

(102,732)

(10,975)

(113,707)

Net foreign exchange gain/(loss)

 2,117

(5,578)

 894

(2,567)

(6,777)

(9,344)

Profit/(loss) before income tax

(15,912)

 82,791

 (19,793)

 47,086

 87,958

 135,044

Taxation expense

(139)

(20,215)

 592  

(19,762)

(45,524)

(65,286)

Profit/(loss) for the period

(16,051)

 62,576

(19,201)

27,324 

42,434

 69,758

*Restated for discontinued operations, refer to Note 24 for further detail.

27Adjusted EBITDAX is a non-IFRS measure used by the Group to measure business performance. It is calculated as profit or loss for the period, adjusted for discontinued operations, taxation, depreciation and amortisation, share-based payment charge, impairment of property, plant and equipment, other income and expenses (including the impact of derivative financial instruments and foreign exchange), net finance costs and exploration and evaluation expenses.

 

Segment financial position

 

The following tables present assets and liabilities information for the Group's operating segments as at 30 June 2024 and 31 December 2023, respectively:

 Six months ended 30 June 2024 (unaudited)

Europe

Israel

Other & inter-segment transactions

Continuing operations, total

Discontinued operations

Total

 

$'000

$'000 

$'000

$'000

$'000

$'000

Oil & Gas properties

 247,687

 3,042,772

 (136)

 3,290,323

 -  

 3,290,323

Other fixed assets

 7,204

 11,650

 16,497

 35,351

 -  

 35,351

Intangible assets

 2,156

 374,406

 20,856

 397,418

 -  

 397,418

Trade and other receivables

 26,468

 136,025

 (12,608)

 149,885

 -  

 149,885

Deferred tax asset

 87,121

 -  

 -

 87,121

 -  

 87,121

Other assets

152,666

 232,490

 (34,895)

 350,261

 -  

 350,261

Assets held for sale

 -  

 -  

 -  

 -  

 1,557,816

 1,557,816

Total assets

523,302

 3,797,343

 (10,286)

 4,310,359

 1,557,816

5,868,175

Trade and other payables

113,136

 284,534

 (55,192)

 342,478

 -  

 342,478

Borrowings

105,317

 2,591,098

 550,110

 3,246,525

 -  

 3,246,525

Decommissioning provision

216,059

 91,237

 -  

 307,296

 -  

 307,296

Current tax payable

 -  

 29,702

 -  

 29,702

 -  

 29,702

Deferred tax liability

 -  

 141,748

-

 141,748

 -  

 141,748

Other liabilities

 60,340

 100,816

 (58,259)

 102,897

 -  

 102,897

Liabilities held for sale

 -  

 -  

 -  

 -  

 1,043,606

 1,043,606

Total liabilities

494,852

 3,239,135

 436,659

 4,170,646

 1,043,606

 5,214,252

Other segment information

 

 

 

 

 

 

Capital expenditure:

 

 

 

 

 

 

-       Property, plant and equipment

 14,590

 52,862

 62

 67,514

 131,362

 198,876

-       Intangible, exploration and evaluation assets

 9

 130,651

 13,194

 143,854

 50,311

 194,165

 

Year ended 31 December 2023

Europe

Israel

Egypt

Other & inter-segment transactions

Total

$'000

 $'000

$'000 

$'000

$'000

Oil & Gas properties

 734,265

 2,783,914

 473,628

 311,295

 4,303,102

Other fixed assets

 35,110

 13,918

 19,996

 (801)

 68,223

Intangible assets

 20,303

 243,965

 46,846

 14,275

 325,389

Trade and other receivables

 88,729

 130,135

 154,095

 (19,702)

 353,257

Deferred tax asset

 217,504

 -  

 -  

-

 217,504

Other assets

 849,649

 573,855

 47,601

 (954,915)

 516,190

Total assets

1,945,560

 3,745,787

 742,166

 (649,848)

 5,783,665

Trade and other payables

 375,390

 391,379

 74,893

 62,864

 904,526

Borrowings

 108,392

 2,588,491

 -  

 524,314

 3,221,197

Decommissioning provision

 738,063

 92,613

 -  

 6,819

 837,495

Current tax payable

 7,597

 -  

 -  

 1,664

 9,261

Deferred tax liability

 -

 122,785

 -  

 -

 122,785

Other liabilities

 7,502

 -  

 1,601

 (6,817)

 2,286

Total liabilities

1,236,944

 3,195,268

 76,494

 588,844

 5,097,550

Other segment information






Capital Expenditure:






-  Property, plant and equipment

220,461

138,490

130,099

(1,630)

487,420

-  Intangible, exploration and evaluation assets

4,152

24,959

26,253

1,288

56,652

Segment Cash flows

The following tables present cash flow information for the Group's operating segments for six months ended 30 June:

 

 

Europe

Israel

Other & inter-segment transactions

Continuing operations, total

Discontinued operations

Total

 

$'000

 $'000

$'000 

$'000

$'000

$'000

Six months ended 30 June 2024 (unaudited)

 




 

 

Net cash from / (used in) operating activities

 6,668

 430,651

 9,258

 446,577

 80,502

 527,079

Net cash (used in) investing activities

 (18,478)

 (253,309)

 (8,494)

 (280,281)

 (113,176)

 (393,457)

Net cash from financing activities

 5,960

 (254,326)

 (22,359)

 (270,725)

 49,920

 (220,805)

Net increase/(decrease) in cash and cash equivalents, and restricted cash

 (5,850)

 (76,984)

 (21,595)

 (104,429)

 17,246

 (87,183)

Cash and cash equivalents at beginning of the period

 17,884

 286,625

 30,414

 334,923

 11,849

 346,772

Effect of exchange rate fluctuations on cash held

 (211)

 1,025

 (529)

 285

 (697)

 (412)

Cash and cash equivalents at the end of the period

 11,823

 210,666

 8,290

 230,779

 28,398

 259,177

 

 

Six months ended 30 June 2023 (unaudited)

Europe

Israel

Egypt

Other & inter-segment transactions

Total

$'000

 $'000

$'000 

$'000

$'000

Net cash from / (used in) operating activities

56,014

172,217

19,987

(15,204)

233,014

Net cash (used in) investing activities

(79,573)

(62,694)

(17,324)

3,961

(155,630)

Net cash from financing activities

43,680

(68,823)

(1,465)

(134,722)

(161,330)

Net increase/(decrease) in cash and cash equivalents

20,121

40,700

1,198

(145,965)

(83,946)

At beginning of the year

58,229

24,825

26,825

318,009

427,888

Effect of exchange rate fluctuations on cash held

853

(837)

(2,238)

4,649

2,427

Cash and cash equivalents at end of the period

79,203

64,688

25,785

176,693

346,369

 

4. Revenue

 

 


30 June (Unaudited)


2024

 

2023 (Restated)*


$'000

 

$'000

Revenue from gas sales

389,234


272,504

Revenue from hydrocarbon liquids sales

213,864


81,276

Revenue from crude oil sales

37,596


24,889

Revenue from LPG sales

227


250

Compensation to gas buyers

-


(4,928)

Rendering of services

1,492


1,900

Total revenue from continuing operations

642,413

 

375,891

*Restated for discontinued operations, refer to note 24 for further detail.

 

Sales volumes for the six months to 30 June from continuing operations (kboe)

 

30 June (Unaudited)

 

2024

 

2023 (Restated)*


kboe

 

kboe

Israel

19,009


12,488

Gas

16,323

 

11,322

Hydrocarbon liquids

2,686

 

1,166

UK

265

 

149

Gas

17

 

15

Crude Oil

248

 

134

Greece

219

 

196

Crude Oil

219

 

196

Total sales volumes from continuing operations

19,493

 

12,833

*Restated for discontinued operations, refer to note 24 for further detail.

 

 

5. Operating profit before taxation from continuing operations

 


 


30 June (Unaudited)

 




2024

 

2023 (Restated)*

 




$'000

 

$'000

 

(a)

Cost of sales

 




 


Staff costs


12,307


10,296

 


Energy cost


6,417


7,216

 


Royalty payable


106,560


63,474

 


Other operating costs28


64,076


58,180

 


Depreciation and amortisation


130,638


82,524

 


Oil stock movement


1,919


(726)

 


Stock overlift / (underlift) movement


4,655


(234)

 

 

Total cost of sales

 

326,572

 

220,730

 




 

 


 

(b)

Administration expenses

 




 


Staff costs


7,539


7,431

 


Share-based payment charge included in administration expenses


4,110


2,573

 


Depreciation and amortisation


1,377


1,536

 


Audit fees


1,016


696

 


Other general & administration expenses


1,806


23

 

 

Total administration expenses

 

15,848

 

12,259

 


 

 




 

(c)

Exploration and evaluation expenses

 




 


Staff costs for Exploration and evaluation activities


321


64

 


Exploration costs written off29


14,961


-

 


Other exploration and evaluation expenses


616


616

 

 

Total exploration and evaluation expenses

 

15,898

 

680

 

(d)

Expected credit loss

 

 

 

 

 

Expected credit loss expense

 

-

 

871

 

 

Total expected credit loss

 

-

 

871

 


 

 




 

(e)

Other expenses

 




 


Restructuring costs


-


202

 


Transaction expenses 30


3,861


-


Loss from disposal of Property, plant & Equipment


28


-

 


Other expenses


71


375

 

 

Total other expenses

 

3,960

 

577

 


 



 


 

(f)

Other income



 


 

 

Other income

 

1,088


1,118

 

 

Total other income

 

1,088

 

1,118

 

*Restated for discontinued operations, refer to note 24 for further detail.

 

28 Other operating costs comprise of insurance costs, gas transportation and treatment fees, concession fees and planned maintenance costs.

29 Exploration expenses write-off pertains to the cessation of exploration activities in the Ioannina area in Greece by the Group during the reporting period. Refer to Note 11 for further details

30 Transaction expenses consist of costs associated with the anticipated sale of the Group's portfolio in Egypt, Italy, and Croatia. The decision to sell was announced in June 2024 (refer to note 24 for further details). Pre-sale activities have resulted in additional expenses recognized during the reporting period, including consulting ($1.4 million) and legal fees ($2.5 million).

6. Net finance cost from continuing operations


 

30 June (Unaudited)

 


 

2024

 

2023 (Restated)*

 


 

$'000

 

$'000

 






 

Interest on bank borrowings


7,589


2,664

 

Interest on Senior Secured Notes

100,236


82,326


Interest expense on long term payables

1,249


1,554


Less amounts included in the cost of qualifying assets

(4,655)


(7,592)


 

 

104,419

 

78,952

 

Finance and arrangement fees


1,677


6,831

 

Commission charges for bank guarantees

1,369


1,085


Other finance (income)/costs and bank charges

844


253


Unwinding of discount on right of use asset

483


148


Unwinding of discount on long-term trade payables

7,804


2,060


Unwinding of discount on provision for decommissioning

5,506


5,662


Unwinding of discount on deferred consideration

-


5,674


Unwinding of discount on convertible loan

-


2,155


Less amounts included in the cost of qualifying assets


(345)


(88)

 

Total finance costs

 

121,757

 

102,732

 

Interest income from time deposits

(5,003)


(3,196)


Total finance income

 

(5,003)

 

(3,196)

 

Net foreign exchange losses


60


2,567

 

Net financing costs

 

116,814

 

102,103

 

*Restated for discontinued operations, refer to note 24 for further detail.

 

7. Fair value measurements

Set out below is information about how the Group determines the fair values of various financial assets and liabilities.

 

Contingent consideration

The share purchase agreement (the "SPA") dated 4 July 2019 between Energean and Edison Spa provides for a contingent consideration of up to $100 million. The amount of the Cassiopea contingent payment varies between nil and $100 million, depending on future gas prices in Italy at the point at which first gas production is delivered from the field. The consideration is contingent on the basis of future gas prices (PSV) recorded at the time of the first gas, which was achieved on 19 August 2024. No payment will be due if the arithmetic average of the year one (i.e., the first year after first gas production) and year two (i.e., the second year after first gas production) Italian PSV Natural Gas Futures prices is less than €10/MWh when first gas production is delivered from the field. $100 million is payable if that average price exceeds €20/MWh, with a range of outcomes between $0 million and $100 million if the average price is between €10/MWh and €20/MWh. The Group's payment obligation is due 90 days after the later of the first day of the month following the first month in which production from the Cassiopea field has continued on a regular basis for at least 25 days or the date upon which formal notice of production from Cassiopea has been accepted by the relevant competent authority in Italy (or failing which once production has continued on a regular basis for 90 days). The fair value of the contingent consideration is estimated by reference to the terms of the SPA and the simulated PSV pricing by reference to the forecasted PSV pricing, historical volatility and a log normal distribution, discounted at a cost of debt.

As at 30 June 2024, the forward curve of PSV prices indicate an average price in excess of 20/MWh. Therefore, the Group's estimate at 30 June 2024 of the fair value of the contingent consideration payable in December 2024 is $95.4 million, based on a Monte Carlo simulation (31 December 2023: $91.1 million).

 

The fair value of the consideration payable has been recognized at level 3 in the fair value hierarchy.


 

 

 

 

2024

 

 Contingent consideration

$'000

 

1 January 2024

91,075

 

Discount unwinding

4,358

 

30 June 2024

95,433

 

 

Management believes there are no reasonably possible change to any key assumptions since 31 December 2023 that would materially impact the contingent consideration valuation.

 

Cash Flow Hedging

In February 2024, the Company entered into a forward transaction to hedge against foreign currency volatility risk associated with its deferred payment to Technip. The hedge relationship was deemed effective at inception, and in accordance with the Group's accounting policy, the transaction was subject to cash flow hedge accounting. Consequently, as of 30 June 2024, the Group recorded a derivative liability of $0.4 million, an other comprehensive loss of $0.4 million, and $0.07 million in finance income related to this transaction during the reporting period.

 

Fair values of financial instruments

The following financial instruments are measured at amortised cost and are considered to have fair values different to their book values:

 

30 June 2024 (Unaudited)

31 December 2023

$'000

Carrying value

Fair value

Carrying value

Fair value

Senior Secured notes

3,141,525

2,828,950

3,032,783

2,775,135

 

The fair value of the notes is within level 1 of the fair value hierarchy and has been determined by discounting future cash flows by the relevant market yield curve at the reporting date.

The fair value of other financial instruments not measured at fair value including cash and short - term deposits, trade receivables and other payables equate approximately to their carrying values. There were no transfers between the levels during the reporting period.

 

 

8. Taxation


30 June (Unaudited)

 

2024

 

2023 (Restated)*

 

$'000

 

$'000

Continuing operations:




Corporation tax - current period

(29,953)


(227)

Adjustments in respect of current income tax of previous year(s)

(29)


-

Total current tax charge

(29,982)

 

(227)

Deferred tax relating to origination and reversal of temporary differences

(15,913)


(19,535)

Income tax expense reported in the Income statement

(45,895)

 

(19,762)

*Restated for discontinued operations, refer to note 24 for further detail.

 

(b) Reconciliation of the total tax charge

The Group calculates its income tax expense as per IAS 34 by applying a weighted average tax rate calculated based on the statutory tax rates of Greece (25%), Cyprus (12.5%), Israel (23%), Italy (24%), United Kingdom (25%/75%) and Egypt (40.55%), weighted according to the profit before tax earned in each jurisdiction where deferred tax is recognised excluding fair value uplifts profits.

On the 29th July 2024, the UK Government announced changes in the Energy Profits Levy (EPL) with effective date 1st November 2024. Specifically, the EPL rate will increase to 38% from 1 November 2024,  bringing the headline rate of tax on upstream oil and gas activities to 78%. The government will also remove the investment allowances from the Energy Profits Levy, including by abolishing the levy's main 29% investment allowance for qualifying expenditure incurred on or after 1 November 2024. The Group is not expected to be materially affected as a result of the announced changes in the EPL.

 

Pillar Two legislation has been enacted or substantively enacted in certain jurisdictions in which the Group operates. However, this legislation does not currently apply to the Group as its consolidated revenue has not exceeded the threshold of €750 million in at least two of the four preceding fiscal years prior to the enactment of the legislation.

The effective tax rate for the period is 49% (30 June 2023: 48%). The tax (charge)/ credit of the period can be reconciled to the profit per the unaudited interim consolidated income statement as follows:


30 June (Unaudited)

 

2024

 

2023 (Restated)*


$'000

 

$'000

Accounting profit before tax from continuing operations

161,764


47,086

Profit before tax from discontinued operations

13,221


87,958

Accounting profit before tax

174,985

 

135,044

Tax calculated at 21.0% weighted average rate (2023: 28.3%)

 

(36,786)


(38,163)

Impact of different tax rates31

(1,822)


1,621

Non recognition of deferred tax on current year tax losses and other temporary differences

(11,712)


(25,937)

Derecognition of previously recognised deferred tax32

(10,987)


-

Permanent differences33

(27,946)


(2,616)

Foreign taxes

(29)


-

Tax effect of non-taxable income and allowances

936


1,187

Other adjustments

(169)


222

Prior year tax

2,067


(1,600)

Income tax expense reported in the statement of profit or loss

(45,895)

 

(19,762)

Income tax attributable to discontinued operations

(40,553)

 

(45,524)

Total taxation (expense)/income

(86,448)

 

(65,286)

* Restated for discontinued operations, refer to Note 24 for further detail.

31Impact of different tax rates mainly relates to the different tax rate applied in the reconciliation of non-taxable income (intragroup dividends) and the impairment loss in Egypt.

32 In 2024, the Group reassessed the recoverability of its deferred tax asset related to the decommissioning provision in Italy, resulting in an approximate tax charge of $11 million. This is attributable to the discontinued operations.

33 Permanent differences primarily consisted of a non-deductible impairment loss of exploration assets in Egypt ($26.8 million), non-deductible M&A costs ($1.0m), other non-deductible expenses ($1.1m) and foreign exchange income ($1.0 million).

 

 

9. Earnings per share

Basic earnings per ordinary share amounts are calculated by dividing net income for the year attributable to ordinary equity holders of the parent by the weighted average number of ordinary shares outstanding during the year.

Diluted income per ordinary share amounts is calculated by dividing net income for the year attributable to ordinary equity holders of the parent by the weighted average number of ordinary shares outstanding during the year plus the weighted average number of ordinary shares that would be issued if dilutive employee share options were converted into ordinary shares.

 

30 June (Unaudited)

 

2024

 

2023 (Restated)*

 

$'000

 

$'000





Total profit from continuing operations attributable to equity shareholders

115,869


27,324

Effect of dilutive potential ordinary shares

-


2,155


115,869


29,479

Number of shares

 



Basic weighted average number of shares

183,480,959


178,454,765

Dilutive potential ordinary shares

1,070,515


5,815,646

Diluted weighted average number of shares

184,551,474

 

184,270,411

Basic earnings per share, continuing operations

$0.63

 

$0.17

Diluted earnings per share, continuing operations

$0.63

 

$0.16

 

* Restated for discontinued operations, refer to Note 24 for further detail.

 

10. Property, plant and equipment


Oil and gas properties

Leased assets

Other property, plant and equipment

Total

Property, plant and equipment  

$'000

$'000

$'000

$'000

Cost

 

 

 

 

At 1 January 2023

4,739,424

58,712

60,118

4,858,254

Additions

469,023

38,278

2,203

509,504

Lease modification

-

8,706

-

8,706

Disposal of assets

(111,448)


-

(111,448)

Capitalised borrowing cost

17,658

-

-

17,658

Change in decommissioning provision

(2,504)

-

-

(2,504)

Other movements

(313)

-

(307)

(620)

Foreign exchange impact

89,811

2,582

2,090

94,483

At 31 December 2023

5,201,651

108,278

64,104

5,374,033

Additions

190,433

1,755

206

192,394

Lease modifications34

-

(998)

-

(998)

Disposal of assets

-

-

(28)

(28)

Capitalised borrowing cost

5,000

-

-

5,000

Change in decommissioning provision

(24,546)

-

-

(24,546)

Transfer to inventory

(448)

-

-

(448)

Transfer to assets held for sale

(1,277,911)

(71,939)

(1,001)

(1,350,851)

Foreign exchange impact

(86,507)

(2,331)

(1,880)

(90,718)

At 30 June 2024 (Unaudited)

4,007,672

34,765

61,401

4,103,838

 





Accumulated Depreciation

 




At 1 January 2023

542,894

29,298

54,158

626,350

Charge for the period

287,926

15,432

1,808

305,166

Impairment

342

-

-

342

Foreign exchange impact

67,387

1,607

1,856

70,850

At 31 December 2023

898,549

46,337

57,822

1,002,708

Charge for the period expensed

172,470

10,135

787

183,392

Impairment

159

-

-

159

Transfer to assets held for sale

(271,045)

(32,740)

(2,121)

(305,906)

Foreign exchange impact

(63,763)

(1,409)

(1,666)

(66,838)

At 30 June 2024 (Unaudited)

736,370

22,323

54,822

813,515

Net carrying amount

 

 

 

 

At 31 December 2023

4,303,102

61,941

6,282

4,371,325

At 30 June 2024 (Unaudited)

3,271,302

12,442

6,579

3,290,323

 

34 The lease modification pertains to the sublease of leased assets in Italy. A corresponding financial asset of $1.0 million for the sublet property has been recorded under Other Receivables on the balance sheet of the disposal group. For more details, refer to Note 24.

 

Included in the carrying amount of leased assets at 30 June 2024 are right of use assets related to Oil and gas properties and Other property, plant and equipment of $8.8 million and $3.6 million respectively (31 December 2023: $58.0 million and $3.9 million). The depreciation charged on these classes for the six-month ending 30 June 2024 were $8.3 million and $1.9 million respectively (six months ended 30 June 2023: $6.3 million and $0.3 million).

The additions to Oil & gas properties for the period of six months ended 30 June 2024 are mainly due to development costs of the Karish main, Karish North, second gas exporter riser costs and the second oil train in Israel at the amount of $49.5 million and the Cassiopea project in Italy at the amount of $105 million.

On 20 June 2024, property, plant, and equipment owned by the disposal group, with a carrying value of $1,045 million (primarily in Italy and Egypt; see note 24 for further details), were reclassified as assets held for sale. Depreciation on these assets ceased once they were classified as held for sale.

Borrowing costs capitalised for qualifying assets, included in oil & gas properties, for the six months ended 30 June 2024 amounted to $5.0 million (30 June 2023: $3.5 million). The weighted average interest rates used was 1.58% for the six months ended 30 June 2024 (30 June 2023: 5.42%).

There were no impairment indicators identified at 30 June 2024.



 

11. Intangible assets


Exploration and evaluation assets

Goodwill

Other Intangible assets

Total


$'000

$'000

$'000

$'000

Intangibles at Cost

 




At 1 January 2023

338,354

101,146

10,975

450,475

Additions

56,379

-

273

56,652

Other movements

313

-

307

620

Exchange differences

2,670

-

(12)

2,658

At 31 December 2023

397,716

101,146

11,543

510,405

Additions

192,538

-

401

192,939

 Transfer to assets held for sale

(99,069)

(4,860)

(6,978)

(110,907)

Exchange differences

(3,961)

-

(359)

(4,320)

At 30 June 2024 (Unaudited)

487,224

96,286

4,607

588,117

 





Accumulated amortisation and impairments

 




At 1 January 2023

130,448

18,310

5,339

154,097

Charge for the period

46

-

932

978

Impairment

26,583

2,175

-

28,758

Exchange differences

1,197

-

(14)

1,183

At 31 December 2023

158,274

20,485

6,257

185,016

Charge for the period

36

-

489

525

Impairment

76,030

-

-

76,030

Transfer to assets held for sale

(63,450)

-

(3,821)

(67,271)

Exchange differences

(3,297)

-

(304)

(3,601)

At 30 June 2024 (Unaudited)

167,593

20,485

2,621

190,699

 





Net Carrying Amount

 




At 31 December 2023

239,442

80,661

5,286

325,389

At 30 June 2024 (Unaudited)

319,631

75,801

1,986

397,418

 

Goodwill arises principally because of the requirement to recognise deferred tax assets and liabilities for the difference between the assigned values and the tax bases of assets acquired and liabilities assumed in a business combination.

During the period, the Group made significant additions to key ongoing projects, including $13 million for the Company's partnership with Chariot Limited in Morocco's Anchois gas development, $130 million mainly related to the Katlan project in Israel, and $49 million for the Location B project in Egypt and the Orion exploration (the latter has subsequently been impaired).

Total impairments of $76.0 million were recognised during the period for projects that will not progress to development. In 2024, the Orion X1 exploration well in Egypt reached the target reservoir but indicated no commercial hydrocarbons, resulting in a full impairment of the related exploration asset valued at $61.2 million. Additionally, the exploration license for Ioannina expired on 2 April 2024, leading to a full impairment of the exploration asset valued at $14.8 million.

The Group exited the Isabella license in December 2023, resulting in the full impairment of the related exploration asset valued at $26.6 million and goodwill of $2.2 million.

On 20 June 2024, intangible assets owned by the disposal group, with a carrying value of $ 43.6 million (primarily in Italy and Egypt; see note 24 for further details), were reclassified as assets held for sale. Amortisation on these assets ceased once they were classified as held for sale.

 

12. Net deferred tax (liability)/ asset

 

Deferred tax (liabilities)/assets

Property, plant and equipment

Right of use asset IFRS 16

Decommi-ssioning

Prepaid expenses and other receivables

Inventory

Tax losses

Deferred expenses for tax

Retire-ment benefit liability

Accrued expenses and other short‑term liabilities

Total

 

$'000

$'000

$'000

$'000

$'000

$'000

$'000

$'000

$'000

$'000

At 1 January 2023

(148,923)

(1,078)

126,246

186

440

197,008

6,208

165

5,860

186,112

Increase / (decrease) for the period through:











Profit or loss

(13,874)

(2,644)

(26,955)

(2,225)

(440)

(57,185)

(630)

163

3,958

(99,832)

Other comprehensive income

-

-

-

-

-

-

-

38

-

38

Exchange difference

(1,197)

(15)

4,269

(12)

6

5,043

-

3

304

8,401

At 31 December 2023

(163,994)

(3,737)

103,560

(2,051)

6

144,866

5,578

369

10,122

94,719

Increase / (decrease) for the period through:











Continuing operations:











Profit or loss

(11,213)

733

318

137

401

(5,576)

(316)

(35)

(363)

(15,914)

Other comprehensive income

-

-

-

-

-

-

-

94

-

94

Exchange difference

1,081

17

(47)

18

(4)

(3,368)

-

(3)

(204)

(2,510)

Discontinued operations:











Profit or loss

844

-

(12,159)

-

-

(7,092)

-

-

64

(18,343)

Other comprehensive income

-

-

-

-

-

-

-

-

(3)

(3)

Exchange difference

(532)

-

(2,834)

-

-

(541)

-

-

1

(3,906)

Transfer to assets / (liabilities) held for sale

(17,083)

-

(79,656)

-

-

(11,950)

-

10

(85)

(108,764)

At 30 June 2024 (Unaudited)

(190,897)

(2,987)

9,182

(1,896)

403

116,339

5,262

435

9,532

(54,627)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

30 June 2024 (Unaudited)

31 December 2023

 

 

 

$'000

$'000

 

Deferred tax liabilities


(141,748)

(122,785)

 

Deferred tax assets


87,121

217,504

 

Net deferred tax (liabilities)/ assets

 

(54,627)

94,719

 

 

The Group transferred to "Asset and Liabilities held for sale" deferred tax assets totally amounted to $108.8 million coming from Italy, as further described in Note 24.

As of 30 June 2024, the Group had gross unused tax losses of $838.2 million (as of 31 December 2023: $907.4 million), of which $101.6 million related to discontinued operations, available to offset against future profits and other temporary differences. The Group did not recognise deferred tax on tax losses and other differences of total amount of $690.9 million, of which $179.9 million related to discontinued operations. 

A deferred tax asset of $128.3 million (2023: $144.9 million) has been recognised on tax losses of $499.4 million, based on the forecasted profits. A deferred tax asset of $12.0 million recognised on Italian tax losses of $49.8 million, classified under discontinued operations, so as the deferred tax asset of $79.7 million recognised on Italian decommissioning costs. 

In Greece and the UK, the net DTA for carried forward losses recognised in excess of the other net taxable temporary differences was $78.8 million and $8.3 million (2023: $77.8 million and $8.7 million) respectively.

Greek tax losses (Prinos area) can be carried forward without limitation up until the relevant concession agreement expires (by 2039), whereas, the tax losses in Israel, Italy and the United Kingdom can be carried forward indefinitely. Based on the Prinos area forecasts (including the Epsilon development), the deferred tax asset is fully utilised by 2032. Finally, in the UK, decommissioning losses is expected to be tax relieved up until 2027 in accordance with the latest taxable profits forecasts.

 

13. Cash and cash equivalents


30 June

 

31 December


2024 (Unaudited)

 

2023


$'000

 

$'000

Cash and bank deposits

230,779


346,772


230,779

 

   346,772

Bank deposits comprise deposits and other short-term money market deposit accounts that are readily convertible into known amounts of cash. The annual average interest rate on short‑term bank deposits was 4.678% for the six months period ended 30 June 2024 (12 months ended 31 December 2023: 4.371%).

 

14. Restricted Cash

Restricted cash comprises cash retained under the Israel Senior Secured Notes and the Greek State Loan requirement as follows:

Current

The current portion of restricted cash at 30 June 2024 was $82.54 million (31 December 2023: $22.48 million). It mainly relates to the September 2024 coupon payment on Senior Secured Notes.

Non-Current

The cash restricted for more than 12 months after the reporting date was $3.0 million (31 December 2023: $3.1 million) mainly comprising $2.2 million (31 December 2023: $2.3 million) held on the Interest Service Reserve Account ('ISRA') in relation to the Greek Loan Notes and $0.8 million (31 December 2023: $0.8 million) for Prinos Guarantee.

 

15. Inventories

 


30 June 2024

(Unaudited)

 

31 December 2023


$'000

 

$'000

Crude oil

17,776


55,414

Hydrocarbon liquids

1,201


1,685

Gas

542


552

Raw materials and supplies

17,425


52,475

Total inventories

36,944

 

110,126

 

 

 

 

 

16. Trade and other receivables


30 June

 

31 December


2024 (Unaudited)

 

2023


$'000

 

$'000

Trade and other receivables - Current

 



Financial items:




Trade receivables

133,209


297,305

Receivables from partners under JOA

435


1,996

Other receivables

5,106


9,479

Government subsidies

79


82

Refundable VAT

1,364


19,273

Accrued interest income

399


1,016


140,592


329,151

Non-financial items:




Deposits and prepayments35

8,752


19,174

Other deferred expenses

541


4,932


9,293


24,106


149,885

 

353,257

Trade and other receivables - Non-Current

 

 


Financial items:




Other tax recoverable

15,462


15,544


15,462


15,544

Non-financial items:




Deposits and prepayments

16,208


17,612

Other non-current assets

645


526


16,853


18,138


32,315

 

33,682

 

35 Included in deposits and prepayments, are mainly prepayments for goods and services under the GSP Engineering, Procurement, Construction and Installation Contract (EPCIC) for Epsilon project.

 

17. Share capital

 

The below tables outline the share capital of the Company.


Equity share capital allotted and fully paid

Share capital

Share premium


Number

$'000

$'000

Issued and authorized

 



At 1 January 2023

178,040,505

2,380

415,388

Issued during the year




- New shares

4,422,013

57

49,943

- Share based payment

1,018,441

12

-

At 31 December 2023

183,480,959

2,449

465,331

Issued during the period




- Share based payment

-

-

-

At 30 June 2024 (Unaudited)

183,480,959

2,449

465,331

 

 

18. Dividends

In line with the Group's dividend policy, Energean returned $0.60/share to shareholders during the reporting period, representing two-quarters of dividend payments (6 months ended 30 June 2023: $0.60/ share).
 

 

$ cents per share

$' 000

Dividends announced and paid in cash

2024

2023

2024 

2023 

March

30

30

54,844

53,252

June

30

30

54,991

53,411

 

60

60

109,835

106,663

 

19. Borrowings

 

 

30 June

 

31 December

 

 

 

2024 (Unaudited)

 

2023

 

 

 

$'000

 

$'000

 

Non-current

 

 



 

Bank borrowings - after two years but within five years





 

4.875% Senior Secured notes due 2026 ($625 million)


621,013


619,932

 

Bank borrowings - more than five years

 

 

 


 

6.5% Senior Secured notes due 2027 ($450 million)

 

445,109


444,313

5.375% Senior Secured notes due 2028 ($625 million)


618,863


618,145

5.875% Senior Secured notes due 2031 ($625 million)


617,218


616,762

8.50% Senior Secured notes due 2033 ($750 million)

 

734,004

 

733,653

BSTDB Loan and Greek State Loan Notes

 

105,318

 

108,392

Carrying value of non-current borrowings

 

3,141,525

 

3,141,197

 






 

Current





 

Revolving credit facility


105,000


80,000

 

Carrying value of current borrowings


105,000


80,000

 






 

Carrying value of total borrowings

 

3,246,525

 

3,221,197

 

 

The Group has provided security in respect of certain borrowings in the form of share pledges, as well as fixed and floating charges over certain assets of the Group.

At 30 June 2024, the Group holds US$2.625 billion in aggregate principal amount of senior secured notes, issued in four series as follows:

·      US$625 million, issued on 24 March 2021, maturing on 30 March 2026, with a fixed annual interest rate of 4.875%.

·      US$625 million, issued on 24 March 2021, maturing on 30 March 2028, with a fixed annual interest rate of 5.375%.

·      US$625 million, issued on 24 March 2021, maturing on 30 March 2031, with a fixed annual interest rate of 5.875%.

·      US$750 million, issued on 11 July 2023, maturing on 30 September 2033, with a fixed annual interest rate of 8.5%.

The interest on each series is paid semi-annually on 30 March and 30 September. The notes are listed for trading on the TACT Institutional of the Tel Aviv Stock Exchange Ltd (TASE), and the TASE-UP for the 2023 issuance.

The Group has provided various collateral, including fixed charges over shares, leases, sales agreements, bank accounts, operating permits, insurance policies, exploration licenses, and the Energean Power FPSO. Floating charges cover present and future assets of relevant subsidiaries.

Additionally, the Group issued US$450 million in senior secured notes on 18 November 2021, maturing on 30 April 2027 with a fixed annual interest rate of 6.5%. These notes are listed on the Official List of the International Stock Exchange (TISE), with interest paid semi-annually on 30 April and 30 October.

Energean Oil and Gas SA entered into a loan agreement on 27 December 2021 with Black Sea Trade and Development Bank for €90.5 million for the development of the Epsilon Oil Field, with an interest rate of EURIBOR plus margins, and another agreement with the Greek State for €9.5 million maturing in 8 years with a fixed rate plus margin.

Finally, the Group signed a three-year $275 million Revolving Credit Facility (RCF) on 8 September 2022, increased to $300 million in May 2023, led by ING Bank N.V. The RCF provides additional liquidity for corporate needs, with an interest rate of 5% plus SOFR on drawn amounts. During the reporting period, the Company utilised $65 million from this facility at an average interest rate of 10.3%, with $30 million repaid subsequent to the reporting date.

 

Capital management

The Group defines capital as the total equity and net debt of the Group. Capital is managed in order to provide returns for shareholders and benefits to stakeholders and to safeguard the Group's ability to continue as a going concern.

Energean is not subject to any externally imposed capital requirements. To maintain or adjust the capital structure, the Group may put in place new debt facilities, issue new shares for cash, repay debt, engage in active portfolio management, adjust the dividend payment to shareholders, or undertake other such restructuring activities as appropriate.

 



30 June 2024 (Unaudited)

 

31 December 2023

 



$'000

 

$'000

 

Net Debt

 




 

Current borrowings


105,000


80,000

 

Non-current borrowings


3,141,525


3,141,197

 

Total borrowings 


3,246,525


3,221,197

 

Less: Cash and cash equivalents

(230,779)

(346,772)


 

Restricted cash

(85,574)

(25,606)



Net Debt

 

2,930,172

 

2,848,819


 

Total equity


653,923


686,115


 


 


Reconciliation of liabilities arising from financing activities

 


1 January 2024

Cash inflows

Cash outflows

Reclassification

Additions

Lease modification

Borrowing costs including amortisation of arrangement fees

Transfer to liabilities held for sale

Foreign exchange impact

30 June 2024 (Unaudited)

 

$'000

$'000

$'000

$'000

$'000

$'000

$'000

$'000

$'000

$'000

2024

3,423,522

65,000

(212,772)

14,801

422

335

111,731

(138,130)

(4,803)

3,260,106

Secured Senior Notes

3,032,783

-

(110,951)

14,278

-

-

100,076

-

-

3,036,186

Revolving credit facility   

80,000

65,000

(40,000)

-

-

-

-

-

-

105,000 

Long -term borrowings

108,414

-

(4,203)

122

-

-

4,393

-

(3,387)

105,339

Lease liabilities

65,096

-

(10,253)

401

422

335

1,658

(42,697)

(1,381)

13,581

Deferred licence payments

46,154

-

(47,400)

-

-

-

1,246

-

-

-

Contingent consideration

91,075

-

-

-

-

-

4,358

(95,433)

-

-












 










 

 

 


20. Retirement benefit liability

20.1 Provision for retirement benefits



30 June 2024 (Unaudited)

 

31 December 2023



$'000

 

$'000

Defined benefit obligation

448


1,595

Provision for retirement benefits recognised

 

448

 

1,595

Allocated as:





Non-current portion


448


1,595

 

20.2 Defined benefit obligation



30 June 2024 (Unaudited)

 

31 December 2023



$'000

 

$'000

At 1 January


1,595


1,675

Transfer to liabilities held for sale


(1,133)


-

Current service cost


49


88

Interest cost


26


59

Extra payments or expenses


-


1

Actuarial gains/(losses) - from changes in financial assumptions


(13)


161

Benefits paid


(24)


(433)

Exchange differences


(52)


44

At 30 June / 31 December

 

448

 

1,595

 

 

21. Provisions

 

Decommissioning provision

Litigation and other provisions

Total

 

$'000

$'000

$'000

At 1 January 2024

830,676

7,510

838,186

Change in estimates

(24,931)

220

(24,711)

Recognised in property, plant and equipment

(24,546)

 

(24,546)

Recognised in operating profit

(385)

220

(165)

Spend

(15,744)


(15,744)

Unwinding of discount

16,047

-

16,047

Transfer to liabilities held for sale

(481,161)

(7,678)

(488,839)

Currency translation adjustment

(17,591)

(52)

(17,643)

At 30 June 2024 (Unaudited)

307,296

-

307,296

Current provisions

44,898

-

44,898

Non-current provisions

262,398

-

262,398

 

Decommissioning provision:

The decommissioning provision represents the present value of decommissioning costs relating to oil and gas properties, which are expected to be incurred up to 2044, when the producing oil and gas properties are expected to cease operations.  The decrease in the estimate for continuing operations is primarily due to changes in the discount rate and inflation assumptions as of 30 June 2024.

The key assumptions underpinning the estimated decommissioning provision are as follows:

 


Inflation

assumption

30 June 2024

Discount rate

assumption

30 June 2024

Cessation of

production

assumption

Spend in 2024

30 June

2024 (Unaudited)

$'000

31 December 2023

$'000

Continuing operations:


 

 

 

 

 

 

Greece


2,6%-1,9%

3.73%

2034

 -  

18,689

19,359

UK


2.02%

3.88%

2030

 5,210

197,370

202,874

Israel36


3.3%-2.15%

4.68%

2042

 -  

91,237

92,613

Discontinued operations:

 

 

 

 

 

 

 

Italy

 

2,2-2%

4.44%

2024-2039

 10.534

464,679

497,827

Croatia

 

2,2-2%

4.44%

2036

 -  

16,482

18,003

Total

 

 

 


 15,744

788,457

830,676

36US inflation rate and US Bond rates have been used.

22. Trade and other payables


30 June 2024 (Unaudited)

 

31 December 2023

 


$'000

 

$'000

 

Trade and other payables - Current

 



 

Financial items:




 

Trade accounts payable

212,792


225,451

 

Payables to partners under JOA37

8,694


170,470

 

Deferred licence payments due within one year40

-


46,154

 

Other payables38

40,267


53,756

 

Contingent consideration

-


91,075

 

Short term lease liability

5,361


16,498

 

Deferred income

-


548

 

VAT payable

1,498


20

 


268,612


603,972

 

Non-financial items:




 

Accrued expenses

21,927


65,033

 

Other finance costs accrued

50,013


63,893

 

Social insurance and other taxes

1,926


4,705

 

 

73,866

 

133,631

 


342,478

 

737,603

 

Trade and other payables - Non Current

 



 

Financial items:




 

Trade and other payables39

93,187


117,796

 

Long term lease liability

8,220


48,598



101,407


166,394

 

Non-financial items:




 

Social insurance

636


529

 


636


529

 


102,043

 

166,923

 

 

37 Payables to partners under the JOA include both payables and working capital estimates provided by the operators. The decrease in 2024 is due to the payables to partners for JOAs in Italy and Egypt being classified as held for sale. Refer to Note 24 for further details.

38 Other payables primarily consist of royalties accrued in Israel ($40.1 million as of 30 June 2024, $32 million as of 31 December 2023) and in Italy ($18 million as of 31 December 2023, with no inclusion as of 30 June 2024).

39 The amount represents a long-term amount payable in terms of the EPCIC contract. Following the amendment to the terms of the deferred payment agreement with Technip signed in February 2024 the remaining amount payable under the EPCIC contract reduced to $210 million. The amount is payable in twelve equal quarterly deferred payments starting in March and therefore has been discounted at 8.668%. p.a. (being the yield rate of the senior secured loan notes, maturing in 2026, at the date of agreeing the payment terms). As of 30 June 2024, two instalments have been paid.

40 In December 2016, Energean Israel acquired the Karish and Tanin offshore gas fields for an initial payment of $40.0 million, with an additional obligation of $108.5 million plus interest, to be paid in ten equal annual instalments at an annual inflation rate of 4.6%. In November 2023, a settlement agreement was reached, allowing the remaining balance to be settled in two instalments, both completed in the first half of 2024. As of 30 June 2024, the full consideration has been paid.

 

23. Share based payments

Analysis of share-based payment charge:


30 June (Unaudited)


2024

 

2023 (Restated)*


$'000

 

$'000

Energean Deferred Bonus Plan (DSBP)

1,083


781

Energean Long Term Incentive Plans (LTIP)

3,027


2,140

Total share-based payment charge

4,110

 

2,921

Expensed as cost of sales

-


348

Expensed as administration expenses

4,110


2,573

Total share-based payment charge

4,110

 

2,921

*Restated for discontinued operations, refer to note 24 for further detail.

 

Energean Long Term Incentive Plan (LTIP)

Under the Energean plc's 2018 LTIP rules, senior executives may be granted conditional awards of shares or nil cost options. Nil cost options are normally exercisable from three to ten years following grant provided an individual remains in employment. Awards are subject to performance conditions (including Total Shareholder Return (TSR) normally measured over a period of three years. Vesting of awards or exercise of nil cost options is generally subject to an individual remaining in employment except in certain circumstances such as good leaver and change of control. Awards may be subject to a holding period following vesting. No dividends are paid over the vesting period; however, Energean's Board may decide at any time prior to the issue or transfer of the shares in respect of which an award is released that the participant will receive an amount (in cash and/or additional shares) equal in value to any dividends that would have been paid on those shares on such terms and over such period (ending no later than the Release Date) as the Board may determine. This amount may assume the reinvestment of dividends (on such basis as the Board may determine) and may exclude or include special dividends.

The weighted average remaining contractual life for LTIP awards outstanding at 30 June 2024 was 1.5 years, number of shares outstanding 1,947,405 and weighted average price of $10.58.

 

Deferred Share Bonus Plan (DSBP)

Under the DSBP, a portion of any annual bonus of a Senior Executive nominated by the Remuneration & Talent Committee, may be deferred into shares. Deferred awards are usually granted in the form of conditional share awards or nil-cost options (or, exceptionally, as cash-settled equivalents). Deferred awards usually vest two years after award although may vest early on leaving employment or on a change of control.

The weighted average remaining contractual life for DSBP awards outstanding at 30 June 2024 was 1.23 years, number of shares outstanding 323,774 and weighted average price of $13.58.

 

24. Discontinued operations

On 20 June 2024, the Group publicly announced the decision of its Board of Directors to sell its portfolio in Egypt, Italy and Croatia (together referred to as "Energean Capital Limited Group", "ECL" or "ECL Group"), fully owned and controlled by the Group. The sale of ECL is expected to be completed by the end of 2024. Upon completion of the disposal, the Group will receive:

$504 million in upfront cash consideration at the closing of the transaction;

Adjustments for working capital and cash between 31 December 2023, and the closing date;

A $139 million Vendor Loan with a tenor of 6 years and 3 months, accruing interest at SOFR + 7% in the first year, increasing by 0.5% annually thereafter;

Up to $125 million in contingent consideration, adjusted for inflation based on the US CPI index from 1 January  2024, contingent upon:

Italian oil and gas production exceeding annual reference volumes from 2025-2028, as outlined in the YE23 Competent Person's Report (CPR).

Brent and Italian PSV gas prices exceeding annual reference prices from 2025-2028.

The contingent payment is calculated as 25% of the incremental commodity price multiplied by actual production, payable annually from 2025 to 2028; and

An uncapped contingent payment related to the recently drilled Location B well in Egypt which will be calculated based off (i) the 2P reserves (as determined by an independent auditor at YE24) plus (ii) the actual 2024 production, that are in excess of specific pre-drill estimated volumes

At 30 June 2024, ECL Group was classified as a disposal group held for sale ("HFS") and as a discontinued operation. The business of ECL Group represented the entirety of the Group's Egypt operating segment until 20 June 2024. With ECL being classified as discontinued operations, the Egypt segment is no longer presented in the segment note. ECL operations in Italy and Croatia were previously included in the Group's Europe operating segment, they are no longer presented within this segment. The results of ECL for the six months ended 30 June 2024 are presented below:

Note A: The tables below present the ECL Group's financial results, showing financial results from discontinued operations before and after adjustments for the reporting periods. The adjustments include (1) intra-group transactions such as interest income and expenses, allowances for related party loans, and costs from transactions between the disposal group and other entities within the Energean plc Group (continuing operations) and (2) adjustments made by the Group related to discontinued operations classification including the adjustment to depreciation and amortisation following the HFS classification date.  These items were not eliminated in the carve-out view (refer to "Discontinued operations, before adjustments"), thereby reflecting the related party transactions for the ECL Group before consolidation adjustments for discontinued operations. Financial results presented for discontinued operations before the mentioned adjustments are non-IFRS measures.

 

 

30 June 2024 (Unaudited)

30 June 2023 (Unaudited)

 

Discontinued operations, before adjustments

Discontinued operations, total

Discontinued operations, before adjustments

Discontinued operations, total

(Note A) 

$'000

 

$'000

 

 

 

 



Revenue

226,041

224,178

213,720

211,751

Cost of Sales

(139,694)

(134,315)

(118,094)

(117,588)

Gross profit

86,347

89,863

95,626

94,163

Administration expenses

(11,427)

(10,024)

(13,305)

(11,105)

Change in decommissioning provision

3,023

3,023

14,633

14,633

Exploration and evaluation expenses

(63,096)

(63,096)

(1,468)

(1,468)

Expected credit loss

(961)

(961)

(409)

(409)

Other expenses

(1,366)

(1,525)

(292)

(292)

Other income

595

754

6,069

6,069

Operating profit

13,115

18,034

100,854

101,591

Finance Income

1,155

117

5,002

4,120

Finance Costs

(21,105)

(16,135)

(18,003)

(10,975)

Net foreign exchange loss

11,117

11,205

(6,781)

(6,778)

Profit before tax from discontinuing operations

 

4,282

13,221

 

81,072

87,958

Taxation (expense)/ income:





-       Related to pre-tax profit/(loss) from the ordinary activities for the period

 

(40,553)

(40,553)

 

(45,524)

(45,524)

-       Related to remeasurement to fair value less costs to sell

 

-

-

 

-

-

(Loss)/ Profit for the period from discontinuing operations

 

(36,271)

(27,332)

 

35,548

42,434

 

The major classes of assets and liabilities of ECL Group classified as held for sale as at 30 June are, as follows:

 

30 June 2024

 

Discontinued operations, before adjustments

Discontinued operations,

total

(Note A) 

$'000

$'000

ASSETS



Property, plant and equipment

1,041,153

1,044,945

Intangible assets

38,805

43,636

Equity-accounted investments

4

4

Deferred tax asset

108,764

108,764

Inventories

71,118

71,118

Loans receivable from related party

102,394

-

Trade and other receivables

267,329

260,951

Cash and cash equivalents

28,398

28,398

Total assets

1.657.965

1,557,816

LIABILITIES



Retirement benefit liability

1,133

1,133

Provisions

488,840

488,840

Trade and other payables

559,670

543,364

Loans payable to related party

244,183

-

Current tax Liability

10,269

10,269

Total liabilities

1,304,095

1,043,606

Net assets directly associated with disposal group

353,870

514,210

The net cashflows incurred by ECL during six months are, as follows:

 

2024

2023

 

$'000

$'000

Operating

80,549

92,296

Investing

(113,176)

(29,079)

Financing

49,920

(11,838)

Net cash (outflow)/inflow

17,293

51,379

 

 

2024

2023

Earnings per share 

$ cents

$ cents

Basic, (loss)/profit for the year from discontinued operations

$(0.15)/ share

$0.24/share

Diluted, (loss)/profit for the year from discontinued operations

$(0.15)/share

$0.23/share

As at 30 June 2024, there was no write-down as the fair value less costs to sell did not fall below the carrying amount of the disposal group.

As of 30 June 2024, the disposal group has capital commitments totalling $79.6 million to be fulfilled by the end of 2024, that mainly relates to Cassiopea project in Italy. This includes a $15.7 million commitment to the Government of Egypt and $63.9 million for capital commitments with partners based on future work programs in Italy.

As of 30 June 2024, the disposal group has $7.7 million in litigation and other provisions. This includes a €3.3 million (approximately $3.5 million) provision for ongoing litigation with the Termoli Port Authority in Italy regarding fees for the marine concession for FSO Alba Marina, currently under appeal in the Campobasso Court of Appeal.

Additionally, Energean Italy Spa is involved in litigation with three municipalities in Italy over real estate municipality taxes (IMU/TASI), interest, and penalties for 2016 to 2019. Under the sale and purchase agreement, Edison S.p.A. bears liability for pre-2019 taxes, while Energean is liable for 2019. Appeals have been filed with strong legal arguments, and the likelihood of outflow beyond the $2.1 million provision recognised is considered remote.

The remaining balance in other provisions relates to a potential claim in Egypt. The timing of the settlement and any cash outflows is uncertain, so these provisions are classified as non-current liabilities based on expected court hearing dates beyond 12 months from 30 June 2024.

The Group will indemnify at completion, the prospective buyer of the ECL Group against risks associated with the failure of specific legal cases mentioned above.


30 June 2024 (Unaudited)

 

31 December 2023

Performance guarantees:

 

 

 

Greece (relates to Energean Italy exploration license)

1,823

 


Italy

11,955

 

16,140

 

13,778

 

16,140

25. Related parties

Balances and transactions between the Company and its subsidiaries, which are related parties, have been eliminated upon consolidation and are not disclosed in this note.

The Directors of Energean Plc are considered the only key management personnel as defined by IAS 24.

There were no related party transactions conducted by the Group with other related parties during the reporting period.

26. Commitments and contingencies of continuing operations

In acquiring its oil and gas interests, the Group has pledged that various work programmes will be undertaken on each permit/interest. The exploration and development capital commitments in the following table are an estimate of the net cost to the Group of performing these work programmes:

 


30 June 2024 (Unaudited)

 

31 December 2023


$'000

 

$'000

Capital Commitments:




Due within one year

91,858


195,903

Due later than one year but within two years

20,945


20,963

Due later two years but within five years

11,885


6,230

 

124,688

 

223,096

For capital commitments related to discontinued operations as of 30 June 2024, please refer to note 24.

As of 30 June 2024, there are no capital commitments towards Governments (31 December 2023: $16.7 million). An amount of $124.7 million (31 December 2023: $206.4 million) pertains to capital commitments with partners based on future work programs. These capital commitments include $91.2 million for the Anchois gas development in Morocco, $12.7 million for the development of the Scott field in the United Kingdom, and $20.8 million for asset integrity expenses related to the Scott and Telford fields.

 


30 June 2024 (Unaudited)

 

31 December 2023

Performance guarantees:

 

 

 

Greece

1,061

 

4,522

Israel

50,568

 

53,006

UK

135,347

 

95,743

Morocco

375

 

-

Greece, Italy (Note 24)

-

 

16,140

 

187,351

 

169,411

For performance guarantees related to discontinued operations as of 30 June 2024, please refer to note 24.

Open guarantees at the reporting date:

·      Karish and Tanin Leases ($25 million) - As required by the Karish and Tanin Lease deeds, the Group provided the Ministry of National Infrastructures, Energy, and Water with bank guarantees for each lease. These guarantees were renewed in May 2024 and are valid until June 2025.

·      Blocks 12, 21, 23 and 31 ($21 million) - To meet the conditions for obtaining exploration and appraisal licenses during the Israeli offshore bid in December 2017, the Group provided the Ministry of National Infrastructures, Energy, and Water with bank guarantees totalling $6 million in January 2018, covering all mentioned blocks. These guarantees expire in January 2025. Additionally, the Group furnished separate guarantees specific to drilling activities in Blocks 12, 23, and 31, amounting to $15 million. The guarantee for Block 12 expires in November 2024, while those for Blocks 23 and 31 are valid until June 2025.

·      Israeli Natural Gas Lines ("INGL") ($2.5 million) - As part of the agreement signed with INGL in June 2019, the Group provided a bank guarantee to secure the milestone payments from INGL. This guarantee expires on 24 July 2024.

·      Israel Other ($2.1 million) - The Group has provided various bank guarantees to third parties in Israel as part of ongoing operations.

·      United Kingdom ($135.4 million)- The Group has issued letters of credit for United Kingdom decommissioning obligations and other obligations under the United Kingdom licenses.

·      Greece - The Group issued letters of credit to cover obligations under the Block 2 licenses.

 

Legal cases and contingent liabilities:

As of 30 June 2024, the Group has a contingent liability of $15 million payable subject to Final Investment Decision being taken on Anchois Development. The Group had no material contingent liabilities as at 31 December 2023.

 

27. Subsequent events

In July 2024, management made a final investment decision for the Katlan development project in Israel. The carrying value of the exploration asset at 30 June 2024 was $207 million. Capital expenditure is expected to be approximately US$1.2 billion. The Katlan area will be developed in a phased approach through a subsea tieback to the existing Energean Power FPSO, which currently serves the Karish and Karish North developments. The first gas production is expected in the first half of 2027.

 

In August 2024, the prospective buyer of the ECL Group obtained unconditional clearance from the Italian Competition Authority followed by approval of the Italian Presidency of the Council of Ministers in respect of the Italian Golden Power Law in September 2024.

28. Subsidiary undertakings

 

At 30 June 2024, the Group had investments in the following subsidiaries:

 

Name of subsidiary

Country of incorporation / registered office

Principal activities

Shareholding
At 30 June 2024
(%)

Shareholding
At 31 December 2023
(%)

Energean E&P Holdings Ltd.

22 Lefkonos Street, 2064 Nicosia, Cyprus

Holding Company

100

Energean Capital Ltd.

22 Lefkonos Street, 2064 Nicosia, Cyprus

Holding Company

100

Energean Group Services Ltd.

44 Baker Street, London W1U 7AL, United Kingdom

Oil and gas exploration, development and production

100

Energean Oil & Gas S.A.

32 Kifissias Avenue, Marousi Athens, 151 25, Greece

Oil and gas exploration, development and production

100

Energean International Ltd.

22 Lefkonos Street, 2064 Nicosia, Cyprus

Oil and gas exploration, development and production

100

Energean Israel Ltd.

22 Lefkonos Street, 2064 Nicosia, Cyprus

Oil and gas exploration, development and production

100

Energean Montenegro Ltd.

22 Lefkonos Street, 2064 Nicosia, Cyprus

Oil and gas exploration, development and production

100

Energean Israel Transmission Ltd.

Andre Sakharov 9, Haifa, Israel

Gas transportation license holder

100

Energean Israel Finance Ltd.

Andre Sakharov 9, Haifa, Israel

Financing activities

100

Energean Egypt Ltd.

22 Lefkonos Street, 2064 Nicosia, Cyprus

Oil and gas exploration, development and production

100

100

Energean Hellas Ltd.

22 Lefkonos Street, 2064 Nicosia, Cyprus

Oil and gas exploration, development and production

100

100

Energean Italy S.p.a.

31 Foro Buonaparte, 20121 Milano, Italy

Oil and gas exploration, development and production

100

100

Energean Sicilia S.r.l.

Via Salvatore Quasimodo 2 - 97100 Ragusa (Ragusa)

Oil and gas exploration, development and production

100

100

Energean Exploration Ltd.

44 Baker Street, London W1U 7AL, United Kingdom

Oil and gas exploration, development and production

100

100

Energean UK Ltd.

44 Baker Street, London W1U 7AL, United Kingdom

Oil and gas exploration, development and production

100

100

Energean Egypt Energy Services JSC

Block #17, City Center, 5th Settlement, New Cairo, 11835, Egypt

Oil and gas exploration, development and production

100

100

Energean Investments Ltd.

44 Baker Street, London W1U 7AL, United Kingdom

Oil and gas exploration, development and production

100

100

Energean Morocco Ltd.

44 Baker Street, London W1U 7AL, United Kingdom

Oil and gas exploration, development and production

100

100

Enearth Limited

22 Lefkonos Street, 2064 Nicosia, Cyprus

Holding Company

100

-

Enearth Greece S.A.

32 Kifissias Avenue, Marousi Athens, 151 25, Greece

Carbon Capture Storage

100

-



 

29. Exploration, development and production interests

 

Development and production:

Country

Licence/unit area

Fields

Fiscal regime

Group's working interest

Joint operation

Operator

Israel


Karish

Karish North, Karish Main

Concession

100%

No

NA


Tanin

Tanin

Concession

100%

No

NA

Egypt


Abu Qir

Abu Qir, Abu Qir North, Abu Qir West, Yazzi (32.75%)

PSC

100%

No

NA


NEA

Yazzi (67.25%), Python

PSC

100%

No

NA


NI

Field A (NI-1X), Field B (NI-3X), NI-2X, Viper (NI-4X)

PSC

100%

No

NA

Greece


Prinos

Prinos, Epsilon

Concession

100%

No

NA


South Kavala


Concession

100%

No

NA


Katakolo

Katakolo (undeveloped)

Concession

100%

No

NA

Italy


C.C6.EO

Vega A (Vega B, undeveloped)

Concession

100%[18]

Yes

Energean


B.C8.LF

Rospo Mare

Concession

100%[19]

Yes

Energean


Fiume tenna

Verdicchio

Concession

100%

No

Energean


B.C7.LF

Sarago, cozza, vongola

Concession

95%

Yes

Energean


B.C11.AS GIANNA

Gianna (undeveloped)

Concession

49%

Yes

ENI


Garaguso

Accettura

Concession

50%

Yes

Energean


A.c14.AS

Rosanna and Gaia

Concession

50%

Yes

ENI


A.C15.AX

Valentina, Raffaella, Emanuela, Melania

Concession

10%

Yes

ENI


A.c16.AG

Delia, Demetra, Sara, Dacia, Nicoletta

Concession

30%

Yes

ENI


A.C8.ME

Anemone and Azelea[20]

Concession

19% and 15.675%

Yes

ENI


Masseria Monaco

Appia and Salacaro (undeveloped)

Concession

50%

Yes

Energean


G.C1.AG

Cassiopea , Gemini, Centauro

Concession

40%

Yes

ENI


B.C14.AS

Calipso and Clara West

Concession

49%

Yes

ENI


B.C20.AS

Carlo, Clotilde e Didone (undeveloped)

Concession

49%

Yes

ENI


Montignano

Cassiano and Castellaro

Concession

50%

Yes

Energean


B.C13.AS

Clara Est, Clara Nord, Clara NW, (Cecilia undeveloped)

Concession

49%

Yes

ENI


Comiso (EIS)

Comiso

Concession

100%

No

NA


A.c13.AS

Daria, ( Manuela ,Arabella, Ramona undeveloped)

Concession

49%

Yes

ENI


B.C10.AS

Emma West and Giovanna

Concession

49%

Yes

ENI


A.C36.AG

Fauzia

Concession

40%

Yes

ENI


Torrente menocchia

Grottammare (undeveloped)

Concession

76%

Yes

Petrorep


Montegranaro

Leoni

Concession

50%

Yes

Gas Plus


Lucera

Lucera

Concession

4.8%

Yes

GPI


Monte Urano

San Lorenzo

Concession

40%

Yes

Energean


A.C21.AG

Naide

Concession

49%

Yes

ENI


Colle di lauro

Portocannone

Concession

83.32%

Yes

Energean


Porto civitanova

Porto civitanova

Concession

40%

Yes

GPI


Quarto

Quarto

Concession

33%

Yes

Padana Energia


A.C17.AG

Regina

Concession

25%

Yes

ENI


S. Andrea


Concession

50%

Yes

Canoel


B.C2.LF

San Giorgio Mare

Concession

100%

Yes

Energean


San Marco

San Marco

Concession

20%

No

ENI


B.C1.LF

Santo Stefano

Concession

95%

Yes

Energean


Mafalda

Sinarca

Concession

40%

Yes

Gas Plus


B.C9.AS

Squalo Centrale

Concession

33%

Yes

ENI


Massignano

Talamonti

Concession

50%

Yes

Energean


Masseria Grottavecchia

Traetta

Concession

14%

Yes

Canoel


S. Anna (EIS)

Tresauro

Concession

25%

Yes

Enimed


Torrente Celone

Vigna Nocelli (Masseria Conca undeveloped)

Concession

50%

Yes

Rockhopper Italia

UK


Tors

Garrow, Kilmar

Concession

68%

Yes

Energean


Markham


Concession

3%

Yes

Spirit Energy


Scott


Concession

10%

Yes

CNOOC


Telford


Concession

16%

Yes

CNOOC


Wenlock


Concession

80%

Yes

Energean

Croatia


Izabela


PSC

70%

No

NA

 

 

Exploration:

Country

Concession

Fields

Fiscal regime

Group's working interest

Joint operation

Operator

Israel


Blocks 12, 21, 23, 31

Katlan, Hermes and Hercules

Concession

100%

No

N/A

Egypt


East North  Bir El Nus


PSC

50%

Yes

Energean

Greece


Block-2


Concession

75%

Yes

Energean


Prinos

Prinos CO2 Storage

Concession

100%

No

N/A

Italy


G.R13.AG

Lince prospect

Concession

40%

Yes

ENI


G.R.14.AG

Panda, Vela prospect

Concession

40%

Yes

ENI

Croatia


Irena


PSC

70%

No

NA

Morocco


Anchois

Lixus

Concession

45%

No

NA


Anchois

Rissana

Concession

37.5%

No

NA

 



[1] On 20 June 2024, the Group publicly announced the decision of its Board of Directors to sell its portfolio in Egypt, Italy and Croatia (together referred to as "Energean Capital Limited Group" or "ECL"), fully owned and controlled by the Group. The continuing operations comprises of the Group's remaining operations in Israel, Greece, UK and Morocco.

[2] Uptime is defined as the number of hours that the Energean Power FPSO was operating; the H1 2024 figure excludes the scheduled 5-day shutdown that occurred in May.

[3] Adjusted EBITDAX is defined later in the financial review. Energean uses Adjusted EBITDAX as a core business KPI.

[4] H1 2024 leverage based upon H1 2024 annualised Adjusted EBITDAX.

[5] $83 million is associated with the upcoming Energean Israel coupon payment in September.

[6] Available liquidity includes amounts available under the Revolving Credit Facilities ("RCF").

[7] Payment date is stated as the date upon which payment is initiated by Energean.

[8] H1 2023 emissions intensity was approximately 10.6 kgCO2e/boe.

[9] Cash G&A is defined later in the financial review.

[10] 3x increase based upon the Transaction EV of up to $945 million and the Edison E&P acquisition EV of $284 million. The Edison E&P acquisition also included the UK portfolio, which was ascribed minimal value.

[11] Uptime is defined as the number of hours that the Energean Power FPSO was operating; the H1 2024 figure excludes the scheduled 5-day shutdown that occurred in May.

[12] 3x increase based upon the Transaction EV of up to $945 million and the Edison E&P acquisition EV of $284 million. The Edison E&P acquisition also included the UK portfolio, which was ascribed minimal value.

[13] The figures presented for the Energean Group in the table and narrative below represent total group numbers, including discontinued operations. For IFRS reporting purposes, discontinued operations are summarized as a single line item on the Interim Consolidated Income Statement, while revenue and costs shown in the statement reflect only continuing activities.

[14] Cash cost of production is defined later in the financial review.

[15] Cash G&A is defined later in the financial review.

[16] Adjusted EBITDAX is defined later in the financial review. Energean uses adjusted EBITDAX as a core business KPI.

[17] Inclusive of restricted cash

[18]                     Energean has agreed with ENI to acquire the latter's WI and the request is pending approval from the Italian authorities. However by means of an agreement between ENI and Energean Italy all the production and cost are retained by Energean from 1 January 2021 and, according to the JOA, the decommissioning costs will be borne by both parties according to their initial WI (Energean 60%, ENI 40%).

[19]                     Energean has requested from the operator to exit the licence.

[20]                     Energean has requested from the operator to exit the licence.


This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 