Antioquia Gold Inc. ("Antioquia" or "the Company") (TSX VENTURE: AGD)(OTCQX: AGDXF) is pleased to announce that the Company has extended the high-grade gold mineralization at the Papi Vein Structure at its Cisneros Project, Colombia. Drill hole PAP11-007 intersected 22.25 g/t Au over 3.1 metres, including 34.31 g/t Au over 2.0m and also including 135.6 g/t Au over 0.5 metres.

This summer two (2) additional drill holes (PAP11-006 and PAP11-007, amounting to 442.3 m drilling) were drilled to test the up plunge extension of mineralization previously encountered in drill holes PAP11-001 through PAP11-005.The Papi Vein Structure is a north-east striking, steeply dipping vein structure that has now been confirmed over a strike length of 200 metres and remains open along strike and to depth. Refer to Figure 1 for location.

Table 1 illustrates the results of the two (2) new drill holes and also lists Papi Vein results previously released for comparison purposes.


Table 1. Highlights of 2011 Sampling Results for The Papi Vein Structure
----------------------------------------------------------------------------
Drill Hole         From        To      Length   Au (g/t)  Ag (g/t)      Cu %
                                      (m)(ii)
----------------------------------------------------------------------------
PAP11-006         191.5     195.8         4.3       1.33
----------------------------------------------------------------------------
including         193.9     195.8         1.9       2.23
----------------------------------------------------------------------------
PAP11-007         103.5     106.6         3.1      22.25
----------------------------------------------------------------------------
including         104.6     106.6         2.0      34.31
----------------------------------------------------------------------------
including         104.6     105.1         0.5     135.60      67.9      0.85
----------------------------------------------------------------------------
PAP11-001(i)      262.8     267.0         4.2      31.00
----------------------------------------------------------------------------
including         266.5     267.0         0.5      42.35      32.0      1.60
----------------------------------------------------------------------------
PAP11-003(i)     213.95     215.6        1.65      20.14
----------------------------------------------------------------------------
including        214.45     215.1        0.65      51.00      40.0      0.96
----------------------------------------------------------------------------
Note: (i) indicates results from earlier drilling on Papi Vein and results
          released in Press Release May 27, 2011.
      (ii)intervals reported are drilled thickness and may not represent
          true width.

The Papi Vein Structure was discovered during the 2011 drilling program, and is in addition to the new discoveries at the Chamuela and Soroma structures (refer to Figure 1) reported in the press release of September 12, 2011. The north-east strike of 030 degrees for the Papi Vein Structure is consistent with other vein structures currently being delineated by drilling on the Cisneros Project and Antioquia Gold is optimistic continued drilling on the Papi Vein Structure will not only enhance the discovery, but also uncover additional en-echelon vein structures.

About Antioquia Gold Inc.

Antioquia has been exploring for precious metals in Colombia since 2007. The Company has a land package of close to 40,000 hectares located throughout Colombia. Antioquia's principal asset, which is being actively explored, is its 5,630 hectare Cisneros Project, located 55 kilometers northeast of Medellin in the Department of Antioquia, Colombia. At the Cisneros Project the Company has conducted extensive geochemical and geophysical programs over the entire property and has identified to date six exploration targets. On the original discovery zone it has drilled over 29,000 meters and is well versed in the understanding of the deposit type and the project's path to resource definition and production.

To ensure reliable sample results Antioquia has a rigorous QA/QC program in place that monitors the chain of custody of the samples and includes the insertion of blanks, preparation duplicates, field duplicates, and certified reference standards in each batch of samples. Core is photographed and sawed in half with one half retained in a secured facility for future reference if needed. Sample preparation (crushing and pulverizing) is performed at either SGS or ACME laboratories in Medellin, Colombia.

Samples prepared by SGS (Medellin) are direct-shipped to SGS Laboratories in Lima, Peru or Toronto Canada, both ISO certified laboratories, for analysis. Samples prepared by ACME (Medellin) are direct shipped to ACME Laboratories in Vancouver Canada, also an ISO certified laboratory for analysis. Assay for gold is performed by fire assay with 30g charge and AAS finish, with a gravimetric finish for over limit samples.

This press release has been prepared under the supervision of Brad Van Den Bussche, P. Geol., Vice President of Exploration for Antioquia Gold Inc. and a Qualified Person as defined by National Instrument 43-101.

On behalf of Antioquia Gold,

Richard Thibault, President

For further information on Antioquia Gold Inc., visit our website at www.antioquiagoldinc.com.

You can also follow Antioquia Gold Inc. on twitter: @AntioquiaAGD

To receive Company news by email, contact info@antioquiagoldinc.com and mention "Antioquia Gold" news in the subject line.

Forward-Looking Statements: This news release may contain certain forward-looking information. All statements included herein, other than statements of historical fact, is forward-looking information and such information involves various risks and uncertainties. There can be no assurance that such information will prove to be accurate, and actual results and future events could differ materially from those anticipated in such information. There is no certainty that the diamond drilling currently in progress will provide positive results of mineralization. For any forward-looking information given, Management has assumed that the results it has received and the interpretation thereof are reliable, and has applied metallurgical methodologies which are consistent with industry standards. Although Management has a reasonable basis for the conclusions drawn, actual results may differ materially from those currently anticipated in such statements. For such statements, the Corporation claim safe harbour for future releases. A description of assumptions used to develop such forward-looking information and a description of risk factors that may cause actual results to differ materially from forward-looking information can be found in the Corporation's disclosure documents on the SEDAR website at www.sedar.com. The Corporation does not undertake to update any forward-looking information except in accordance with applicable securities laws.

To view the Figure 1 Cisneros Project - Exploration Areas, including Papi, please visit the following link: http://media3.marketwire.com/docs/Cisneros915.pdf.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts: CHF Investor Relations Cathy Hume CEO 416-868-1079 x231 cathy@chfir.com CHF Investor Relations Juliet Heading Account Manager 416-868-1079 x239 juliet@chfir.com

Antioqua Gold (CE) (USOTC:AGDXF)
過去 株価チャート
から 5 2024 まで 6 2024 Antioqua Gold (CE)のチャートをもっと見るにはこちらをクリック
Antioqua Gold (CE) (USOTC:AGDXF)
過去 株価チャート
から 6 2023 まで 6 2024 Antioqua Gold (CE)のチャートをもっと見るにはこちらをクリック