Lithium Ionic drills 1.94% Li2O over 15.0m, 1.91% Li2O over 9.8m and 1.68% Li2O over 9.1m at Bandeira, Minas Gerais, Brazil
2023年9月27日 - 8:00PM
Lithium Ionic Corp. (TSXV: LTH; OTCQB: LTHCF; FSE: H3N) (“Lithium
Ionic” or the “Company”) reports drill results from Bandeira, one
of the four targets presently being drilled within the Company’s
14,182-hectare land package in northern Minas Gerais State, Brazil.
This region, recently coined “Lithium Valley” by state officials
and geologically located within the Eastern Brazil Pegmatite
Province, is emerging as a prolific hard rock lithium-producing
region. These results form part of a large 50,000-metre drill
program underway for H2 2023, with 13 drills currently operating.
Bandeira Drill Intercept
Highlights (See Figure 1):
- 1.94% Li2O over
15.0m (hole ITDD-23-158; see Figure 2)
- 1.91% Li2O over
9.8m (hole ITDD-23-151; see Figure 2)
- 1.68% Li2O over
9.1m (hole ITDD-23-148)
- 1.45% Li2O over
8.6m (hole ITDD-23-150)
- 1.67% Li2O over 6.2m, incl.
2.21% Li2O over 4.0m (hole ITDD-23-156)
- 1.75% Li2O over
5.3m (hole ITDD-23-149)
Blake Hylands, P.Geo., Chief Executive Officer
of Lithium Ionic, commented, “Our infill and expansion drilling
program at Bandeira continues to yield positive results. We are
particularly impressed with the high-grade results from holes
ITDD-23-158 and ITDD-23-151 of 1.94% Li2O over 15.0m and 1.91% Li2O
over 9.8m which confirmed a 250m down-dip extension of a large and
widening pegmatite that extends over 800 metres from surface,
reaching a depth of 450 metres.”
The Bandeira lithium deposit is located in the
same district where Companhia Brasileira de Litio (CBL)’s Cachoeira
mine has been producing lithium for +30 years, and recent producer
Sigma Lithium operates the Grota do Cirillo project, which hosts
the largest hard rock lithium deposit in the Americas (See Figure
1). In late June 2023, Lithium Ionic published an initial NI 43-101
compliant mineral resource estimate (“MRE”) at the Bandeira and
Outro Lado deposits of 7.57 million tonnes (“Mt”) grading 1.40%
lithium oxide (“Li2O”) of Measured and Indicated (“M&I”) and
11.86Mt grading 1.44% Li2O of Inferred resources (see press release
dated June 27, 2023). Drilling at Bandeira is focused on upgrading
the mineral resource classifications in support of economic and
engineering studies, as well as testing mineralized extensions to
expand the resources.
The Company is rapidly advancing the Bandeira
deposit towards a production decision, while it continues to
explore and define regional targets. Project engineering is
underway by independent Brazilian consultant, GE21 Consultoria
Mineral Ltda., with a Preliminary Economic Assessment (“PEA")
expected in the coming weeks. Concurrently, NEO Agroambiental Ltda
is completing the RCA (Environmental Control Report) and PCA
(Environmental Control Plan) to support the application of a
Concomitant Environmental and Installation License (“LAC”, or
Licença Ambiental Concomitante) for the underground portion of the
Bandeira deposit. The LAC is an accelerated permitting scenario
available to projects whose mine infrastructure covers a small
footprint where deforestation is not required. The LAC replaces the
first two steps of the environmental licensing process: the
Preliminary License (LP - Licença Prévia) and the Installation
License (LI – Licença de Instalação); which precede the final
Operating License (LO - Licença de Operação). In addition, WSP
(formerly Golder) is working to complete an Environmental Impact
Assessment covering all the Bandeira mineral rights by year-end,
which is required for the portions of the project that are not
eligible for the LAC.
Figure 1. Bandeira Drill Collars and
Traces with Intercept HighlightsView Figure 1
here: https://www.globenewswire.com/NewsRoom/AttachmentNg/585bb540-682d-4106-967e-8b9871f82470
Figure 2. Section LT 000; Showing New
Results for Holes ITDD-23-151 and ITDD-23-158View
Figure 2
here: https://www.globenewswire.com/NewsRoom/AttachmentNg/7e34a899-2822-40f5-b131-27e0dc742d8b
Table 1. Bandeira Drill
Results
Hole ID |
Az |
Dip |
From |
To |
Metres |
Li2O (%) |
ITDD-23-136 |
150 |
-50 |
21.20 |
21.68 |
0.5 |
1.89 |
and |
85.97 |
89.97 |
4.0 |
1.73 |
and |
92.75 |
94.84 |
2.1 |
1.01 |
ITDD-23-143 |
150 |
-66 |
48.05 |
52.40 |
4.4 |
1.68 |
and |
164.12 |
167.19 |
3.1 |
1.34 |
and |
187.65 |
188.03 |
0.4 |
2.99 |
and |
342.37 |
344.37 |
2.0 |
1.83 |
and |
366.77 |
367.20 |
0.4 |
1.58 |
and |
383.35 |
388.72 |
5.4 |
1.72 |
and |
398.90 |
400.75 |
1.9 |
2.40 |
ITDD-23-148 |
150 |
-65 |
74.13 |
77.87 |
3.7 |
1.23 |
and |
257.50 |
266.60 |
9.1 |
1.68 |
and |
317.40 |
320.17 |
2.8 |
2.11 |
and |
326.16 |
328.99 |
2.8 |
1.44 |
ITDD-23-149 |
150 |
-66 |
23.38 |
24.73 |
1.4 |
1.59 |
and |
46.51 |
48.45 |
1.9 |
1.52 |
and |
84.12 |
87.36 |
3.2 |
0.80 |
and |
434.80 |
440.10 |
5.3 |
1.75 |
and |
445.49 |
447.17 |
1.7 |
0.78 |
ITDD-23-150 |
0 |
-90 |
123.60 |
129.60 |
6.0 |
1.74 |
and |
142.44 |
145.44 |
3.0 |
2.67 |
and |
293.11 |
301.75 |
8.6 |
1.45 |
ITDD-23-151 |
150 |
-77 |
348.98 |
351.05 |
2.1 |
1.17 |
and |
411.87 |
421.66 |
9.8 |
1.91 |
ITDD-23-156 |
0 |
-90 |
63.03 |
67.36 |
4.3 |
1.30 |
and |
211.64 |
217.86 |
6.2 |
1.67 |
incl. |
213.86 |
217.86 |
4.0 |
2.21 |
and |
313.78 |
317.61 |
3.8 |
1.78 |
ITDD-23-158 |
0 |
-90 |
393.02 |
396.02 |
3.0 |
1.09 |
and |
453.97 |
468.92 |
15.0 |
1.94 |
*Assays pending for ITDD-23-152, ITDD-23-153,
ITDD-23-154 and ITDD-23-157.
About Lithium Ionic Corp.
Lithium Ionic is a Canadian mining company
exploring and developing its lithium properties in Brazil. Its
flagship Itinga and Salinas projects cover 14,182 hectares in the
northeastern part of Minas Gerais state, a mining-friendly
jurisdiction that is quickly emerging as a world-class hard-rock
lithium district. The Itinga Project is situated in the same region
as CBL’s Cachoeira lithium mine, which has produced lithium for +30
years, as well as Sigma Lithium Corp.’s Grota do Cirilo project,
which hosts the largest hard-rock lithium deposit in the
Americas.
Quality Assurance and
Control
During the drill program, assay samples were
taken from NQ core and sawed in half. One-half was sent for
assaying at SGS Laboratory, a certified independent commercial
laboratory, and the other half was retained for results, cross
checks, and future reference. A strict QA/QC program was applied to
all samples. Every sample was processed with Drying, crushing from
75% to 3 mm, homogenization, quartering in Jones, spraying 250 to
300 g of sample in steel mill 95% to 150. SGS laboratory carried
out multi-element analysis for ICP90A analysis.
Qualified Persons
The technical information in this news release
has been prepared by Carlos Costa, Vice President Exploration of
Lithium Ionic and Blake Hylands, CEO and director of Lithium Ionic,
and both are “qualified persons” as defined in NI 43-101.
Investor and Media
Inquiries:
+1 647.316.2500info@lithiumionic.com
Cautionary Note Regarding
Forward-Looking Statements
This press release contains statements that
constitute “forward-statements.” Such forward looking statements
involve known and unknown risks, uncertainties and other factors
that may cause the Company’s actual results, performance or
achievements, or developments to differ materially from the
anticipated results, performance or achievements expressed or
implied by such forward-looking statements. Although the Company
believes, in light of the experience of its officers and directors,
current conditions and expected future developments and other
factors that have been considered appropriate that the expectations
reflected in this forward-looking information are reasonable, undue
reliance should not be placed on them because the Company can give
no assurance that they will prove to be correct. When used in this
press release, the words “estimate”, “project”, “belief”,
“anticipate”, “intend”, “expect”, “plan”, “predict”, “may” or
“should” and the negative of these words or such variations thereon
or comparable terminology are intended to identify forward-looking
statements and information. The forward-looking statements and
information in this press release include information relating to
the prospectivity of the Company’s mineral properties, the economic
viability of the Itinga Project, the mineralization and development
of the Company’s mineral properties, the Company’s exploration
program and other mining projects and prospects thereof, the
Company’s ability to complete a PEA, the Company’s ability to
complete an environmental impact assessment and obtain the
requisite permitting and approvals and the Company’s future plans.
Such statements and information reflect the current view of the
Company. Risks and uncertainties that may cause actual results to
differ materially from those contemplated in those forward-looking
statements and information. By their nature, forward-looking
statements involve known and unknown risks, uncertainties and other
factors which may cause our actual results, performance or
achievements, or other future events, to be materially different
from any future results, performance or achievements expressed or
implied by such forward-looking statements. The forward-looking
information contained in this news release represents the
expectations of the Company as of the date of this news release
and, accordingly, is subject to change after such date. Readers
should not place undue importance on forward-looking information
and should not rely upon this information as of any other date. The
Company undertakes no obligation to update these forward-looking
statements in the event that management’s beliefs, estimates or
opinions, or other factors, should change.
Information and links in this press release
relating to other mineral resource companies are from their sources
believed to be reliable, but that have not been independently
verified by the Company.
Neither the TSXV nor its Regulation
Services Provider (as that term is defined in the policies of the
TSXV) accepts responsibility for the adequacy or accuracy of this
press release.
Lithium Ionic (TSXV:LTH)
過去 株価チャート
から 2 2025 まで 3 2025
Lithium Ionic (TSXV:LTH)
過去 株価チャート
から 3 2024 まで 3 2025