Table of Contents

 

 

 

United States

Securities and Exchange Commission

Washington, D.C. 20549

 

FORM 6-K

 

Report of Foreign Private Issuer

Pursuant to Rule 13a-16 or 15d-16

of the

Securities Exchange Act of 1934

 

For the month of

 

April 2014

 

Vale S.A.

 

Avenida Graça Aranha, No. 26
20030-900 Rio de Janeiro, RJ, Brazil

(Address of principal executive office)

 

(Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.)

 

 

(Check One) Form 20-F x Form 40-F o

 

(Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1))

 

 

(Check One) Yes o No x

 

(Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7))

 

 

(Check One) Yes o No x

 

(Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.)

 

 

(Check One) Yes o No x

 

(If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b). 82-   .)

 

 

 



Table of Contents

 

Table of Contents:

 

Press Release

Signature Page

 



Table of Contents

 

GRAPHIC

1Q14ProductionReport

 

 

Production Highlights

 

Rio de Janeiro, April 30, 2014 – Vale S.A. (Vale) reached 71.1 Mt of iron ore production, the best performance for a first quarter since 1Q08, with gains in the Northern, Southeastern and Southern Systems compared to 1Q13, helped by better weather conditions in 1Q14 and the ramp-ups of the Plant 2 (Additional 40 Mtpy) and the Conceição Itabiritos projects. In particular, Carajás production increased by 8.1%. Output decreased compared to 4Q13 due to scheduled maintenance stoppages that normally occur in the first half of the year.

 

In the beginning of the year, we obtained authorization from the Brazilian Institute for the Environment and Renewable Natural Resources (IBAMA) for mining in the N4E mine areas. This authorization will support the accomplishment of the 2014 production plan of 120 Mt in Carajás, 312 Mt production in the year (321 Mt with purchases of third party ore).

 

Pellets production was 9.9 Mt in 1Q14, 8.6% higher than in 1Q13 basically due to better weather conditions.

 

Production of nickel reached 67,500 t in 1Q14, also a new record for a first quarter. Negative impacts from a longer and colder winter in our Canadian operations were offset by increased production from Onça Puma and Vale New Caledonia.

 

VNC resumed its operations on January 1 st , 2014, following repairs to the effluent placement and dispersion line. Total nickel production in the form of nickel oxide and nickel hydroxide cake was 5,600 t (3,300 of  NHC and 2,300 of NiO) in 1Q14, matching its best quarter to date, including 2,688 t produced in March, which was a record month for the operation.

 

Salobo I continued its ramp-up, producing 21,100 t of copper in concentrates in 1Q14, reaching 84.4% of its nominal capacity.

 

Coal production in 1Q14 reached 1.8 Mt,  the best first quarter ever due to Moatizes’s ramp-up but 21.0% lower than in 4Q13 mostly due to the weak performance of Carborough Downs.

 

Moatize produced 1.009 Mt in 1Q14, a new record for a first quarter, of which 0.595 Mt of metallurgical coal and 0.414 Mt of thermal coal. Metallurgical and thermal coal output increased by 48.4% and 49.2%, respectively, when compared to 4Q13.

 

In 1Q14 fertilizer output fell when compared to 4Q13, reflecting maintenance stoppages, which are concentrated in the first half of the year. The ramp-up of Bayóvar was interrupted to modify the source of energy for two dryers with the objective of reducing operating costs.

 

Production Summary

 

000’ metric tons

 

1Q14

 

4Q13

 

1Q13

 

1Q14/4Q13
% change

 

1Q14/1Q13
% change

 

Iron ore (1)

 

71,064

 

81,251

 

64,851

 

-12.5

%

9.6

%

Pellets(1)

 

9,928

 

10,409

 

9,141

 

-4.6

%

8.6

%

Nickel

 

67.5

 

67.9

 

65.1

 

-0.6

%

3.7

%

Copper(2)

 

88.4

 

94.6

 

89.5

 

-6.5

%

-1.2

%

Coal

 

1,785

 

2,258

 

1,752

 

-21.0

%

1.9

%

Manganese

 

470

 

638

 

501

 

-26.4

%

-6.2

%

Potash

 

109

 

126

 

120

 

-13.4

%

-8.9

%

Phosphate rock

 

1,932

 

2,286

 

1,991

 

-15.5

%

-3.0

%

 


(1)Excluding Samarco’s attributable production.

(2) Including Lubambe’s attributable production.

 

1



Table of Contents

 

GRAPHIC

 

 

Iron ore

 

000’ metric tons

 

1Q14

 

4Q13

 

1Q13

 

1Q14/4Q13
% Change

 

1Q14/1Q13
% Change

 

 

 

 

 

 

 

 

 

 

 

 

 

Northern System

 

23,365

 

31,584

 

21,605

 

-26.0

%

8.1

%

Carajás

 

23,365

 

31,584

 

21,605

 

-26.0

%

8.1

%

Southeastern System

 

25,822

 

28,205

 

24,782

 

-8.4

%

4.2

%

Itabira

 

7,827

 

9,147

 

6,780

 

-14.4

%

15.4

%

Minas Centrais

 

8,434

 

9,130

 

9,146

 

-7.6

%

-7.8

%

Mariana

 

9,561

 

9,928

 

8,856

 

-3.7

%

8.0

%

Southern System

 

20,592

 

19,732

 

17,039

 

4.4

%

20.9

%

Paraopebas

 

6,916

 

6,877

 

5,524

 

0.6

%

25.2

%

Vargem Grande

 

5,474

 

5,031

 

4,891

 

8.8

%

11.9

%

Minas Itabirito

 

8,202

 

7,825

 

6,624

 

4.8

%

23.8

%

Midwestern System

 

1,285

 

1,729

 

1,425

 

-25.7

%

-9.9

%

Corumbá

 

774

 

1,208

 

988

 

-35.9

%

-21.6

%

Urucum

 

511

 

521

 

437

 

-2.1

%

16.8

%

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL IRON ORE

 

71,064

 

81,251

 

64,851

 

-12.5

%

9.6

%

 

 

 

 

 

 

 

 

 

 

 

 

Samarco(1)

 

2,414

 

2,780

 

2,685

 

-13.2

%

-10.1

%

 


(1)  Vale’s attributable production capacity of 50%.

 

Production overview

 

In 1Q14, iron ore output was 71.1 Mt, excluding Samarco’s attributable production, being the best performance for a first quarter since 1Q08 and 9.6% better than the same period last year with gains in the Northern, Southeastern and Southern Systems.

 

Production in the first quarter of the year tends to be weak due to weather-related seasonality. In 1Q14, we had better weather conditions which helped us improve production compared to the same period in previous years. Output decreased compared to 4Q13 due to scheduled maintenance stoppages.

 

Northern System

 

Production reached 23.4 Mt in 1Q14, 8.1% higher than in 1Q13 due to better weather conditions and the successful ramp-up of Plant 2 which produced 3.3 Mt in 1Q14. Output was 26.0% lower than in the previous quarter due to scheduled maintenance and lower mine productivity as a result the traditional fog in Carajás during this time of the year.

 

2



Table of Contents

 

GRAPHIC

 

We are activating new trucks which will be used to transport the additional ore we will produce this year in Carajás.

 

Southeastern System

 

The Southeastern System, which encompasses the Itabira, Minas Centrais and Mariana mining hubs, produced 25.8 Mt in 1Q14, 4.2% more than in 1Q13 and 8.4% less than in 4Q13, mostly due to scheduled maintenance stoppages.

 

Production of the Itabira mining hub was 1.0 Mt higher than in 1Q13 due to the successful ramp-up of Conceição Itabiritos. Output was 1.3 Mt lower than in 4Q13 due to scheduled maintenance.

 

Production of the Minas Centrais mining hub was 8.4 Mt in 1Q14, 7.6% lower than last quarter and 7.8% lower than production in the same period of last year due to the rundown of the Gongo Soco mine, which is scheduled to close in 2014.

 

Output of the Mariana mining hub of 9.6 Mt was a new record for a first quarter due to the exploitation of new mine sections at Fábrica Nova, as a result of a mining license granted at the end of May, 2013. The better weather conditions also supported the good performance. Production was 0.4 Mt lower than in 4Q13 due to scheduled maintenance.

 

Southern System

 

The Southern System, composed of the Paraopeba, Vargem Grande and Minas Itabirito mining hubs,  produced 20.6 Mt in 1Q14, a new record for a first quarter, with gains across all mine hubs when compared to 4Q13 and 1Q13.

 

Production was 4.4% higher than in 4Q13 due to the recovery from the rainfalls at the end of December, 2013.

 

Output was 20.9% higher than in 1Q13, being a new record for a first quarter, due to the good weather conditions.

 

Midwestern System

 

The Midwestern System mining hub, comprising Urucum and Corumbá, produced 1.3 Mt in 1Q14, 9.9% less than in the same period of last year due to a managerial decision to reduce inventory. In 2014, production will be slightly lower than in 2013 without any impact on sales.

 

Samarco

 

Attributable production from the three pellet plants in 1Q14 was lower than in 4Q13 and in 1Q13 due to scheduled and corrective maintenance in of one of Samarco´s iron ore pipelines.

 

3



Table of Contents

 

GRAPHIC

 

 

Pellets

 

000’ metric tons

 

1Q14

 

4Q13

 

1Q13

 

1Q14/4Q13
% Change

 

1Q14/1Q13
% Change

 

 

 

 

 

 

 

 

 

 

 

 

 

Southeastern System

 

5,809

 

5,692

 

5,169

 

2.0

%

12.4

%

Nibrasco

 

2,402

 

2,412

 

2,191

 

-0.4

%

9.6

%

Kobrasco

 

1,170

 

1,179

 

1,133

 

-0.8

%

3.2

%

Hispanobras(1)

 

1,119

 

989

 

755

 

13.1

%

48.2

%

Itabrasco

 

1,118

 

1,112

 

1,090

 

0.6

%

2.5

%

Southern System

 

2,278

 

2,413

 

2,007

 

-5.6

%

13.5

%

Fabrica

 

802

 

955

 

954

 

-16.0

%

-15.9

%

Vargem Grande

 

1,476

 

1,458

 

1,053

 

1.2

%

40.1

%

Oman

 

1,842

 

2,304

 

1,965

 

-20.1

%

-6.3

%

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL PELLETS

 

9,928

 

10,409

 

9,141

 

-4.6

%

8.6

%

 

 

 

 

 

 

 

 

 

 

 

 

Samarco(2)

 

2,219

 

2,755

 

2,530

 

-19.5

%

-12.3

%

 


(1) Production attributable to Vale on a pro forma basis. In July 2012, we entered into a leasing contract for the Hispanobras pelletizing operation. As a consequence, their production is being consolidated 100% on a pro forma basis.

(2) Vale’s attributable production capacity of 50%.

 

Production overview

 

Excluding Samarco’s attributable production of 2.2 Mt, Vale’s pellets production was 9.9 Mt in 1Q14, 8.6% higher than in 1Q13 and 4.6% lower than in 4Q13.

 

Better weather conditions in 1Q14 supported the increase in pellet production. Output was still lower than in 4Q13 due to scheduled maintenance stoppages which are concentrated in the first half of the year.

 

Southeastern System

 

Production volumes at the Tubarão operating plants — Nibrasco, Kobrasco, Hispanobras and Itabrasco — increased to 5.8 Mt in 1Q14 from 5.7 Mt in 4Q13 and 5.2 Mt in 1Q13.

 

The quarter-on-quarter improvement was partially due to the intense rainfall at the end of December 2013 and the bringing forward of the scheduled maintenance stoppage of Nibrasco and Itabrasco to December 2013. The increase in output compared to 1Q13 was mostly due to the maintenance stoppage in Hispanobras for 2 months at the beginning of 2013.

 

4



Table of Contents

 

GRAPHIC

 

Southern System

 

Fábrica produced 0.8 Mt of pellets, 16.0% and 15.9% less than in 4Q13 and in 1Q13 respectively, due to a scheduled maintenance stoppage in 1Q14.

 

Vargem Grande pellet output was 1.5 Mt, slightly above the previous quarter and 40.1% higher than in 1Q13, given Vale´s decision to increase capacity utilization of Vargem Grande´s pellet plant.

 

Oman operations

 

The Oman operations produced 1.8 Mt of direct reduction pellets in 1Q14, less than in 4Q13 and in 1Q13 due to a scheduled maintenance stoppage in 1Q14. The Oman pellet plant did not undergo scheduled preventive maintenance in 1Q13 because the operation was in ramp-up at that time.

 

Samarco

 

Attributable production from Samarco´s three plants was 19.5% and 12.3% lower than in 4Q13 and in 1Q13, respectively, due to a scheduled maintenance stoppage of pellet plant I in 1Q14.

 

The start-up of Samarco’s fourth pellet plant (pellet plant IV), together with the expansion of its mine, construction of a new slurry pipeline and improvements to its maritime terminal infrastructure is expected for 2Q14.  Samarco´s pellet plant IV has a nominal capacity of 8.3 Mtpy.

 

5



Table of Contents

 

GRAPHIC

 

Manganese ore and ferroalloys

 

000’ metric tons

 

1Q14

 

4Q13

 

1Q13

 

1Q14/4Q13
% Change

 

1Q14/1Q13
% Change

 

 

 

 

 

 

 

 

 

 

 

 

 

MANGANESE ORE

 

470

 

638

 

501

 

-26.4

%

-6.2

%

Azul

 

332

 

490

 

381

 

-32.3

%

-12.9

%

Urucum

 

130

 

117

 

98

 

11.1

%

33.1

%

Other mines

 

8

 

31

 

23

 

-74.3

%

-64.2

%

 

 

 

 

 

 

 

 

 

 

 

 

FERROALLOYS

 

46

 

50

 

32

 

-8.7

%

42.1

%

Brazil

 

46

 

50

 

32

 

-8.7

%

42.1

%

 

Production overview

 

In 1Q14, production of manganese ore reached 470,000 t against 638,000 t in 4Q13 and 501,000 t in 1Q13.

 

Manganese ore production

 

Output from the Carajás Azul manganese mine decreased by 32.3% and 12.9% against 4Q13 and 1Q13, respectively, reaching 332,000 t. The production decreased due to low feed availability for the plant.

 

In 1Q14, production from Urucum reached the historical record of 130,000 t, increasing by 11.1% against 4Q13 and 33.1% against 1Q13. This production increase was a result of operational improvements carried out in the beneficiation plant in 4Q13, which improved productivity and the physical availability of the plant in 1Q14.

 

A mine expansion project, which will allow significant production increases as of next year is currently ongoing and in 2H14 we will build the infrastructure in the underground mine to access high quality ore bodies.

 

Production at Morro da Mina was 8,000 t in 1Q14, a decrease of 74.3% and 64.2% respectively when compared to 4Q13 and 1Q13. The weak performance was caused by interruption of production in the north section of the mine, due to geological conditions. In 2Q14, we will improve production in the south section to deal with this restriction.

 

Ferroalloys production

 

Production of ferroalloys was 8.7% lower than in 4Q13, due to a decision to shut down furnaces and to sell excess energy to the Brazilian national grid.

 

Ferroalloy quarterly production was comprised of 28,000 t of ferrosilicon manganese alloys (FeSiMn), 13,000 t of high-carbon manganese alloys (FeMnHc) and 5,000 t of medium-carbon manganese alloys (FeMnMC).

 

6



Table of Contents

 

GRAPHIC

 

 

Nickel

 

Finished production by source

 

000’ metric tons

 

1Q14

 

4Q13

 

1Q13

 

1Q14/4Q13
% Change

 

1Q14/1Q13
% Change

 

 

 

 

 

 

 

 

 

 

 

 

 

Canada

 

41.6

 

43.0

 

44.8

 

-3.4

%

-7.3

%

Sudbury

 

17.6

 

18.0

 

17.1

 

-1.8

%

3.1

%

Thompson

 

7.6

 

6.3

 

7.2

 

20.7

%

6.4

%

Voisey’s Bay

 

14.5

 

16.9

 

18.7

 

-14.4

%

-22.5

%

Ore from third parties(1)

 

1.9

 

1.9

 

1.9

 

-1.8

%

-1.8

%

Indonesia(2)

 

16.4

 

20.9

 

17.4

 

-21.5

%

-5.5

%

New Caledonia(3)

 

4.1

 

2.1

 

2.9

 

99.8

%

41.1

%

Brazil (Onça Puma)

 

5.4

 

1.9

 

0.0

 

186.8

%

n.m.

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL NICKEL

 

67.5

 

67.9

 

65.1

 

-0.6

%

3.7

%

 


(1) External feed purchased from  third parties and processed into finished nickel in our operations.

(2) Nickel in matte  at Sorowako totaled 19,600 t in 1Q14 lower than 16,400 t, due to material in transit and work in progress in other refineries.

(3) VNC quarterly output was 5,600 t of NiO and NHC lower than 4,100 t, due to material in transit and work in progress in other refineries.

 

Production overview

 

Nickel production reached 67,500 t in 1Q14, in line with 4Q13 and 3.7% higher than 1Q13, reaching an historic mark for a first quarter. Negative impacts from a longer and colder winter in our Canadian operations were offset by increased production from Onça Puma and Vale New Caledonia.

 

Canadian Operations

 

In 1Q14, Sudbury production reached 17,600 t, 3.1% higher than in 1Q13, but 1.8% lower than in 4Q13. Colder than average winter temperatures impacted our power systems, particularly at the Clarabelle Mill, resulting in a series of unplanned outages.

 

In May, we will carry out a major maintenance on our Sudbury operations, lasting approximately 4 weeks and impacting our 2Q14 production. The Sudbury operation executes major maintenance, particularly on the acid plant and furnaces, approximately every 18 months.

 

Thompson production in 1Q14 was 7,600 t, 20.7% higher than in 4Q13 and 6.4% higher than1Q13, as we have prioritized the use of Thompson feed in the mix.

 

Voisey’s Bay nickel in concentrate production amounted to 14,500 t in 1Q14,  a decrease of 14.4% and 22.5% in relation to 4Q13 and 1Q13, respectively.  In January, we experienced a failure

 

7



Table of Contents

 

GRAPHIC

 

in the grinding section of the mill, resulting in a loss of three weeks of milling time. The mill resumed normal operations on February 1 st , 2014. Additionally, extremely thick ice in the coastal area near our port has created minor delays in the shipping of concentrates from the facility.

 

Long Harbour is being commissioned. We are anticipating the first nickel out of the plant at the end of 2Q14. Initially Long Harbour will process nickel in matte from PTVI, processing nickel from Voisey´s Bay at a later stage.

 

Indonesian Operations

 

In 1Q14, production of nickel in matte from our Indonesian operations at Sorowako totaled 19,600 t.

 

Finished nickel production sourced from PTVI was 16,400 t. Production was 5.5% lower than 1Q13 and 21.5% lower than in 4Q13 mainly because we have sent matte from PTVI to our Long Harbour processing facility in Newfoundland and Labrador to support the start-up of that plant.

 

New Caledonia Operations

 

On January 1st, 2014, VNC resumed operations, following repairs to the effluent placement and dispersion line that failed in November 2013. The second autoclave and the fluid bed reactor (FBR) section subsequently commenced operation on January 22nd. The plant has continued to operate stably with two and at times three autoclaves in operation. Debottlenecking of the integrated operation continues to improve throughput.

 

With an output of 5,600 t, VNC production of NiO and NHC was on par with its best quarter to date. This included 2,688 t produced in March, which was a record month for the operation.

 

Production of finished products (NHC and Utility Nickel from VNC sourced NiO) totaled 4,100 t in 1Q14 as we rebuilt the supply pipeline after the stoppage in 4Q13.

 

Brazilian Operation (Onça Puma)

 

Production at Onça Puma was 5,400 t of nickel contained in ferronickel, reaching 86% of its nominal capacity for a single furnace operation in 1Q14.

 

8



Table of Contents

 

GRAPHIC

 

 

Copper

 

Finished production by source

 

000’ metric tons

 

1Q14

 

4Q13

 

1Q13

 

1Q14/4Q13
% Change

 

1Q14/1Q13
% Change

 

 

 

 

 

 

 

 

 

 

 

 

 

Brazil

 

47.3

 

52.8

 

38.8

 

-10.4

%

22.0

%

Sossego

 

26.3

 

31.7

 

27.7

 

-17.1

%

-5.3

%

Salobo

 

21.1

 

21.1

 

11.0

 

-0.3

%

90.7

%

Canada

 

38.6

 

38.8

 

45.2

 

-0.5

%

-14.6

%

Sudbury

 

24.5

 

24.2

 

26.0

 

1.1

%

-5.7

%

Thompson

 

0.3

 

0.7

 

0.4

 

-54.0

%

-25.0

%

Voisey’s Bay

 

6.9

 

8.6

 

11.0

 

-19.4

%

-37.3

%

Ore from third parties

 

6.8

 

5.3

 

7.7

 

30.0

%

-11.4

%

Zambia (Lubambe)

 

2.5

 

2.2

 

1.8

 

16.2

%

36.7

%

Chile

 

0.0

 

0.8

 

3.7

 

n.m.

 

n.m.

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL COPPER

 

88.4

 

94.6

 

89.5

 

-6.5

%

-1.2

%

 

Production overview

 

In 1Q14, copper output was 88,400 t, 6.5%  and 1.2% lower respectively than  in 4Q13 and 1Q13,.

 

Brazilian Operations

 

Production of copper in 1Q14 at the Sossego mine totaled 26,300 t in the form of copper in concentrates, 5.3% and 17.1% lower respectively than in 1Q13 and 4Q13. During January and February, the mine operated in a lower than average grade section of the ore body. Grades increased later in the quarter, but rains delayed access to certain areas of the pit.

 

Salobo I continued its ramp-up, producing 21,100 t of copper in concentrates in 1Q14, 90.7% higher than in 1Q13. Production was in line with 4Q13, the best quarter to date, despite the impact of the fog. The Salobo operation has begun commissioning  some of the components of phase 2 as that project nears completion

 

Canadian Operations

 

Sudbury production reached 24,500 t, 1.1% higher than in 4Q13 but 5.7% lower than in 1Q13. Colder than average winter temperatures resulted in failures in our power systems,

 

9



Table of Contents

 

GRAPHIC

 

particularly at our Clarabelle Mill, resulting in a series of unplanned outages.

 

Voisey’s Bay production was 6,900 t, 37.3% and 19.4% lower than in 1Q13and 4Q13, respectively. As mentioned earlier, in January we experienced a failure in the grinding section of the mill, which resulted in a loss of three weeks of milling time. The mill resumed operations on February 1 st , 2014.

 

African Operation (Lubambe)

 

Lubambe, our Zambian JV, is ramping up and delivering 6,250 t of copper in concentrates on a 100% basis (attributable production of 2,500 t). Lubambe has a nominal capacity of 45,000 t per year.

 

Chile Operation — discontinued operation

 

As previously announced, Vale completed the sale of Tres Valles, in Chile on December 9th, 2013.

 

10



Table of Contents

 

GRAPHIC

 

GRAPHIC

 

Nickel and copper by-products

 

Finished production by source

 

 

 

1Q14

 

4Q13

 

1Q13

 

1Q14/4Q13
% Change

 

1Q14/1Q13
% Change

 

 

 

 

 

 

 

 

 

 

 

 

 

COBALT (metric tons)

 

856.7

 

711.4

 

992.8

 

20.4

%

-13.7

%

Ontario

 

402.1

 

435.6

 

441.0

 

-7.7

%

-8.8

%

Manitoba

 

167.4

 

139.9

 

179.8

 

19.7

%

-6.9

%

Vale Newfoundland and Labrador

 

0.0

 

0.0

 

0.0

 

n.m.

 

n.m.

 

VNC

 

287.2

 

136.0

 

372.0

 

111.2

%

-22.8

%

 

 

 

 

 

 

 

 

 

 

 

 

PLATINUM (000’ oz troy)

 

49.2

 

42.9

 

34.2

 

14.8

%

43.3

%

Ontario

 

49.2

 

42.9

 

34.2

 

14.8

%

43.3

%

 

 

 

 

 

 

 

 

 

 

 

 

PALLADIUM (000’ oz troy)

 

109.2

 

96.2

 

88.7

 

13.5

%

23.1

%

Ontario

 

109.2

 

96.2

 

88.7

 

13.5

%

23.1

%

 

 

 

 

 

 

 

 

 

 

 

 

GOLD (000’ oz troy)

 

73.7

 

88.3

 

57.9

 

-16.5

%

27.2

%

Ontario

 

20.1

 

26.7

 

21.9

 

-24.7

%

-8.1

%

Sossego

 

18.0

 

21.3

 

17.4

 

-15.5

%

3.5

%

Salobo

 

35.6

 

40.3

 

18.7

 

-11.5

%

90.6

%

 

 

 

 

 

 

 

 

 

 

 

 

SILVER (000’ oz troy)

 

433

 

514

 

425

 

-15.8

%

1.8

%

Ontario

 

433

 

514

 

425

 

-15.8

%

1.8

%

 

Cobalt

 

Output of cobalt reached 857 t in 1Q14, 20.4% higher than in 4Q13, mainly reflecting the increase in VNC production, which totaled 287 t in 1Q14.

 

Platinum and palladium

 

Platinum output was 49,200 oz and palladium was 109,200 oz, 14.8% and 13.5% higher than in 4Q13, respectively.

 

Gold

 

Gold production amounted to 73,700 oz in 1Q14, 16.5% lower than in 4Q13, due to the decrease in Salobo’s gold output.

 

11



Table of Contents

 

GRAPHIC

 

GRAPHIC

 

Coal

 

000’ metric tons

 

1Q14

 

4Q13

 

1Q13

 

1Q14/4Q13
% Change

 

1Q14/1Q13
% Change

 

 

 

 

 

 

 

 

 

 

 

 

 

METALLURGICAL COAL

 

1,223

 

1,850

 

1,373

 

-33.9

%

-10.9

%

Moatize

 

595

 

401

 

417

 

48.4

%

42.7

%

Carborough Downs

 

73

 

814

 

554

 

-91.0

%

-86.8

%

Integra Coal

 

379

 

433

 

218

 

-12.5

%

73.8

%

Others

 

176

 

202

 

184

 

-12.9

%

-4.3

%

 

 

 

 

 

 

 

 

 

 

 

 

THERMAL COAL

 

561

 

408

 

379

 

37.5

%

48.1

%

Moatize

 

414

 

277

 

256

 

49.2

%

61.6

%

Integra Coal

 

48

 

34

 

24

 

41.2

%

99.3

%

Others

 

100

 

97

 

99

 

2.6

%

0.8

%

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL COAL

 

1,785

 

2,258

 

1,752

 

-21.0

%

1.9

%

 

Production overview

 

Total coal output in 1Q14 reached 1.8 Mt, 21.0% lower than in 4Q13, mostly due to the weak performance of Carborough Downs (CD). Production was slightly higher than 1Q13 due to Moatize’s ramp-up.

 

Australian operations

 

CD output was 73,000t in 1Q14, 91.0% less than in 4Q13 due to the longer than expected longwall move, which began in the middle of December and finished only in mid-March as a result of a roof fall  at the beginning of January.

 

In 1Q14, Integra Coal output was 8.6% lower than in 4Q13, but 76.4% higher than in 1Q13. In 4Q13 we accessed better geological sections of the mine. Integra coal production totaled 379,000 t of metallurgical and 48,000 t of thermal coal.

 

Production from our other Australian mines was 276,000 t in 1Q14, a decrease of 7.7% from the 299,000 t registered in 4Q13, due to higher strip ratios.

 

Moatize operations

 

In 1Q14, Moatize produced 1.009 Mt, of which 0.595 Mt of met coal and 0.414 Mt of thermal

 

12



Table of Contents

 

GRAPHIC

 

coal. Met and thermal coal output increased by 48.4% and 49.2%, respectively, when compared to 4Q13, due to a normalization of the supply of explosives. The lack of availability of explosives limited our production flexibility in 4Q13 and affected the production mix, resulting in only 49% of met coal output in1 Q14.

 

The ramp-up of the first phase of the Moatize coal project is being temporarily restricted by the existing limitations of the logistics infrastructure — railway and port — which do not allow for total utilization of the mine’s nominal capacity of 11 Mtpy.

 

The start-up of the Nacala corridor project, expected by 2H14, will eliminate the above-mentioned logistics bottleneck.

 

13



Table of Contents

 

GRAPHIC

 

GRAPHIC

 

Potash

 

000’ metric tons

 

1Q14

 

4Q13

 

1Q13

 

1Q14/4Q13
% Change

 

1Q14/1Q13
% Change

 

 

 

 

 

 

 

 

 

 

 

 

 

POTASH

 

109

 

126

 

120

 

-13.4

%

-8.9

%

Taquari-Vassouras

 

109

 

126

 

120

 

-13.4

%

-8.9

%

 

Phosphates

 

000’ metric tons

 

1Q14

 

4Q13

 

1Q13

 

1Q14/4Q13
% Change

 

1Q14/1Q13
% Change

 

 

 

 

 

 

 

 

 

 

 

 

 

PHOSPHATE ROCK

 

1,932

 

2,286

 

1,991

 

-15.5

%

-3.0

%

Brazil

 

1,026

 

1,234

 

1,137

 

-16.9

%

-9.7

%

Bayóvar

 

906

 

1,051

 

855

 

-13.9

%

6.0

%

 

 

 

 

 

 

 

 

 

 

 

 

MAP(1)

 

276

 

305

 

288

 

-9.3

%

-4.1

%

TSP(2)

 

207

 

252

 

251

 

-17.8

%

-17.5

%

SSP(3)

 

357

 

459

 

554

 

-22.1

%

-35.5

%

DCP(4)

 

118

 

127

 

121

 

-7.3

%

-2.2

%

 


(1) Monoammonium phosphate

(2) Triple superphosphate

(3) Single superphosphate

(4)Dicalcium phosphate

 

Potash

 

In 1Q14, potash production totaled 109,000 t, 13.4% and 8.9% lower than in 4Q13 and in 1Q13, respectively. In 1Q14, we accessed lower quality ore and faced lower availability of the concentration plant due to maintenance stoppages .

 

Phosphate Rock

 

Total production of phosphate rock reached 1.9 Mt in line with 1Q13, but 15.5% lower than in 4Q13, driven by a decrease in production in our Brazilian operations. We have also reduced production in the Brazilian mines to draw down inventory in our Araxá plant in 1Q14.

 

In 1Q14, Bayóvar output was affected by a stoppage to modify the source of energy to supply two dryers, changing from liquefied petroleum gas (LPG) to liquefied natural gas (LNG). The change will result in a cost reduction in the Bayóvar operation.

 

14



Table of Contents

 

GRAPHIC

 

MAP

 

In 1Q14, the production of MAP (monoammonium phosphate) totaled 276,000 t, 9.3% lower on a quarter-on-quarter basis as a result of operational adjustments for the use of Bayóvar phosphate rock instead of phosphate rock from Catalão, due to its low availability, which  impacted the production of Cubatão plant 2.

 

The Catalão mining and chemical complex, located in Minas Gerais, produces phosphate rock, SSP and TSP.

 

TSP

 

The output of TSP (Triple superphosphate) decreased against 4Q13 and 1Q13, by 17.8% and 17.5%, respectively, due to the prioritization of MAP production in the Uberaba plant.

 

SSP

 

Production of SSP (single superphosphate) was 22.1% and 35.5% lower than in 4Q13 and 1Q13, respectively, due to the maintenance stoppage in Catalão in 1Q14.

 

DCP

 

DCP (dicalcium phosphate) production was 118,000 t, 7.3% lower than in 4Q13, reflecting weaker demand.

 

Nitrogen

 

000’ metric tons

 

1Q14

 

4Q13

 

1Q13

 

1Q14/4Q13
% Change

 

1Q14/1Q13
% Change

 

 

 

 

 

 

 

 

 

 

 

 

 

AMMONIA

 

49

 

39

 

141

 

23.2

%

-65.7

%

UREA

 

0

 

0

 

128

 

n.m.

 

n.m.

 

NITRIC ACID

 

113

 

117

 

115

 

-3.4

%

-1.6

%

AMMONIUM NITRATE

 

114

 

123

 

120

 

-7.4

%

-5.4

%

 

Ammonia and Urea Production

 

In 1Q14, ammonia production increased by 23.2% compared to 4Q13, recovering from the low availability of gas at Cubatão 2.

 

Cubatão plant 2 is part of Cubatão’s four plant complex, and it produces ammonia, nitric acid and ammonium nitrate.

 

The decrease in production when compared to 1Q13 is explained by the sale  of the Araucária operation on June 1st, 2013. Araucária produced nitrogens, with an annual production capacity of approximately 1.1 million tons of ammonia and urea.

 

As mentioned previously, we no longer produce urea, while ammonia is being produced exclusively in Cubatão.

 

Nitric Acid and Ammonium Production

 

The output of nitric acid and ammonium nitrate was lower than in 4Q13. Nitric acid output was impacted by equipment problems at Cubatão 2, which will be replaced by August 2014.

 

15



Table of Contents

 

GRAPHIC

 

For further information.please contact:

+55-21-3814-4540

Rogério T. Nogueira: rogerio.nogueira@vale.com

Viktor Moszkowicz: viktor.moszkowicz@vale.com

Carla Albano Miller: carla.albano@vale.com

Andrea Gutman: andrea.gutman@vale.com

Marcelo Bonança Correa: marcelo.bonanca@vale.com

Marcelo Lobato: marcelo.lobato@vale.com

Marcio Loures Penna: marcio.penna@vale.com

Samantha Pons: samantha.pons@vale.com

 

This press release may include statements that present Vale’s expectations about future events or results. All statements, when based upon expectations about the future and not on historical facts, involve various risks and uncertainties. Vale cannot guarantee that such statements will prove correct. These risks and uncertainties include factors related to the following: (a) the countries where we operate, especially Brazil and Canada; (b) the global economy; (c) the capital markets; (d) the mining and metals prices and their dependence on global industrial production, which is cyclical by nature; and (e) global competition in the markets in which Vale operates. To obtain further information on factors that may lead to results different from those forecast by Vale, please consult the reports Vale files with the U.S. Securities and Exchange Commission (SEC), the Brazilian Comissão de ValoresMobiliários (CVM), the French Autorité des Marchés Financiers (AMF), and The Stock Exchange of Hong Kong Limited, and in particular the factors discussed under “Forward-Looking Statements” and “Risk Factors” in Vale’s annual report on Form 20-F.

 

16



Table of Contents

 

Signatures

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

 

 

Vale S.A.

 

 

(Registrant)

 

 

 

 

By:

/s/ Rogerio T. Nogueira

Date: April 30, 2014

 

Rogerio T. Nogueira

 

 

Director of Investor Relations

 


Vale (NYSE:VALE.P)
過去 株価チャート
から 5 2024 まで 6 2024 Valeのチャートをもっと見るにはこちらをクリック
Vale (NYSE:VALE.P)
過去 株価チャート
から 6 2023 まで 6 2024 Valeのチャートをもっと見るにはこちらをクリック