Enertopia Drills 262 Feet of 1,231 ppm Li from Clayton Valley
Enertopia Drills 262 Feet of 1,231 ppm Li from
Clayton Valley
Kelowna, BC, CANADA --
February 19, 2019 -- InvestorsHub NewsWire -- Enertopia
Corporation (ENRT)
on the OTCQB and (TOP)
on the CSE (the
"Company" or "Enertopia") is pleased to announce that all drill
core sample assays have been received from the four resource
definition holes and one metallurgical test hole. The best hole for
grade and thickness was TOP-02* that averaged 1,231 ppm li over 262
feet. Including 1,368 ppm li over 186 feet in the main reduced
zone.
Drilling confirms widespread lithium
mineralization on the property. The average grade and thickness
from our four-hole drill program was approximately 1,120 ppm li
over an average thickness of 284 feet. A higher-grade zone inside
the total lithium horizon averaged more than 1,225 ppm over an
average thickness of 177 feet.
This zone appears to have a regional NE trend
starting from the Southwest on Cypress Development’s proposed
high-grade starter pit, with an average grade of ~ 1,105 ppm Li and
running through our project and then onto Noram Ventures project to
the northeast where they have outlined a shallow resource to ~ 50
feet averaging 1,060 ppm Li.
Drill hole TOP-04 ended in mineralization of
1,480 ppm li over the last 5 feet at a depth of 297
feet.
“Drilling has not only verified the Company’s
expectations for the potential of the lithium horizon on our
property but we have been able to show by the drill bit that the
drill intersections to date indicate any future outlined resource
could have Lithium values exceeding those of the proposed
high-grade starter pit envisioned on the Cypress Development
property to our southwest.” Stated President Robert
McAllister
Summary of Drill
Program Assay Intercepts:
DRILL HOLE |
From |
To |
Length |
Min |
Max |
Avg |
|
ft |
ft |
ft |
ppm Li |
ppm Li |
ppm Li |
TOP-01 |
0 |
275 |
275 |
300 |
1,760 |
1,039 |
Includes upper
claystone |
0 |
118 |
118 |
470 |
1,230 |
815 |
Includes reduced
claystone |
118 |
275 |
157 |
300 |
1,760 |
1,179 |
TOP-02* |
20 |
282 |
262 |
490 |
2,580 |
1,231 |
Includes upper
claystone |
20 |
96 |
76 |
490 |
1,630 |
870 |
Includes reduced
claystone |
96 |
282 |
186 |
920 |
2,580 |
1,368 |
TOP-03 |
17 |
352 |
335 |
400 |
1,890 |
1,002 |
Includes upper
claystone |
17 |
102 |
85 |
400 |
1,190 |
623 |
Includes reduced
claystone |
102 |
352 |
250 |
500 |
1,890 |
1,129 |
TOP-04** |
32 |
297 |
265 |
820 |
2,080 |
1,208 |
Includes upper
claystone |
32 |
86 |
54 |
940 |
2,080 |
1,312 |
Includes reduced
claystone |
86 |
202 |
116 |
820 |
1,730 |
1,255 |
Includes lower
claystone |
202 |
297 |
95 |
890 |
1,480 |
1,102 |
Summary of assay
intercepts for TOP-02M metallurgical
hole:
DRILL HOLE |
From |
To |
Length |
Min |
Max |
Avg |
|
ft |
ft |
ft |
ppm Li |
ppm Li |
ppm Li |
TOP-02M |
- |
- |
- |
- |
- |
- |
Includes upper
claystone |
10 |
40.25 |
30.25 |
490 |
1,630 |
1,140 |
Includes reduced
claystone |
105 |
185 |
80 |
920 |
2,580 |
1,405 |
Notes:
Drill holes TOP-01 to
TOP-04 were assayed over intervals averaging 10ft each unless the
intersection involved changes in the lithological
units.
Drill hole TOP-02M was
only assayed over intervals of 5ft that had poor recovery in
adjacent hole TOP-02.
There is a high
correlation to lower assayed grades in intersections that had poor
recovery when compared to hole TOP-02M which was a twin hole for
metallurgical testing purposes. Hole TOP-02M and TOP-04 were
drilled with at CAT rig to a depth of 230ft and showed core
recoveries of 90% to 100% over these intervals. These two holes
returned correspondingly higher average Li grades than holes TOP-01
and TOP-02.
Hole TOP-04** was the
only hole to reach the lower reduced claystone and the last 5 feet
at the EOH (End of Hole) assayed 1,480 ppm
Li.
All samples were
submitted to ALS Global in Reno, Nev., for analysis by ME-ICP61
plus Lithium. Eleven blind sample blanks and standards were
inserted into the sample sequences at random
intervals.
A regional map showing
the company’s strategic project location can be accessed by going
to www.enertopia.com
“With assay results in hand from our Clayton Valley Nevada
drill program we can’t wait to get started on our solution testing
of the drilled lithium horizons. We continue to strive for a
low-cost mining and processing solution to unlock the potential
value of the Lithium enriched claystone’s.” Stated CEO Robert
McAllister
A complete hole log and assay presentation will
be available in the coming days on the company’s website at
www.enertopia.com
The Qualified
person:
The technical data in this news release have been reviewed
by Douglas Wood, P.Geol a qualified person under the terms of NI
43-101.
About
Enertopia:
A Company focused on using modern technology to build
shareholder value. Enertopia is working to establish a
lithium resource and at the same time working on extracting Lithium
from its synthetic brine solutions by using industry leading proven
technology.
Enertopia shares are quoted in Canada with symbol TOP
and in the United States with symbol
ENRT. For additional information, please visit
www.enertopia.com or call Robert McAllister, the President at
1.250.870.2219
This release includes forward-looking statements
within the meaning of Section 27A of the Securities Act of 1933, as
amended, and Section 21E of the Securities Exchange Act of 1934, as
amended. Statements which are not historical facts are
forward-looking statements. The Company makes forward-looking
public statements concerning its expected future financial
position, results of operations, cash flows, financing plans,
business strategy, products and services, potential and financing
of its mining or technology projects, growth opportunities, plans
and objectives of management for future operations, including
statements that include words such as "anticipate," "if,"
"believe," "plan," "estimate," "expect," "intend," "may," "could,"
"should," "will," and other similar expressions that are
forward-looking statements. Such forward-looking statements
are estimates reflecting the Company's best judgment based upon
current information and involve a number of risks and
uncertainties, and there can be no assurance that other factors
will not affect the accuracy of such forward-looking statements.,
foreign exchange and other financial markets; changes in the
interest rates on borrowings; hedging activities; changes in
commodity prices; changes in the investments and expenditure
levels; litigation; legislation; environmental, judicial,
regulatory, political and competitive developments in areas in
which Enertopia Corporation operates. There can be
no assurance that a lithium resource will be outlined at the
Clayton Valley, NV project or the testing for the brine recovery
system will be effective for the recovery of Lithium and if
effective will be economic or have any positive impact on
Enertopia. The User should refer to the risk disclosures set out in
the periodic reports and other disclosure documents filed by
Enertopia Corporation from time to time with regulatory
authorities.
The CSE has not reviewed and does not accept
responsibility for the adequacy or accuracy of this
release
Enertopia (CSE:TOP)
過去 株価チャート
から 10 2024 まで 11 2024
Enertopia (CSE:TOP)
過去 株価チャート
から 11 2023 まで 11 2024