Blencowe Resources PLC Corporate Presentation (3508N)
2023年9月22日 - 3:05PM
RNSを含む英国規制内ニュース (英語)
TIDMBRES
RNS Number : 3508N
Blencowe Resources PLC
22 September 2023
Date: 22 September 2023
Blencowe Resources Plc
("Blencowe" or the "Company")
Corporate Presentation
Blencowe Resources is pleased to announce the release of an
updated presentation following the completion of the DFC grant.
The presentation can be viewed here and can be found on the
Company's website at
https://blencoweresourcesplc.com/presentation/
For further information please contact:
Blencowe Resources Plc www.blencoweresourcesplc.com
Sam Quinn Tel: +44 (0)1624 681 250
info@blencoweresourcesplc.com
Investor Relations Tel: +44 (0) 7891 677 441
Sasha Sethi sasha@flowcomms.com
Tavira Financial Tel: +44 (0)20 3192 1733
Jonathan Evans jonathan.evans@tavira.group
First Equity Limited Tel: +44(0)20 7330 1833
Jason Robertson jasonrobertson@firstequitylimited.com
Twitter https://twitter.com/BlencoweRes
LinkedIn https://www.linkedin.com/company/72382491/admin/
Background
Orom-Cross Graphite Project
Orom-Cross is a potential world class graphite project both by
size and end-product quality, with a high component of more
valuable larger coarse flakes within the deposit.
A 21-year Mining Licence for the project was issued by the
Ugandan Government in 2019 following extensive historical work on
the deposit. Blencowe completed a successful Pre-Feasibility Study
on the Project in July 2022 and is now within the Definitive
Feasibility Study phase as it drives towards first production.
Orom-Cross presents as a large, shallow open-pitable deposit,
with an initial JORC Indicated & Inferred Mineral Resource of
24.5Mt @ 6.0% TGC (Total Graphite Content). This Resource has been
defined from only 2% of the total tenement area which presents
considerable upside potential ahead. Development of the resource is
expected to benefit from a low strip ratio and free dig operations
together with abundant inexpensive hydro-electric power off the
national grid, thereby ensuring low operating costs. With all major
infrastructure available at or near to site the capital costs will
also be relatively low in comparison to most graphite peers.
This information is provided by RNS, the news service of the
London Stock Exchange. RNS is approved by the Financial Conduct
Authority to act as a Primary Information Provider in the United
Kingdom. Terms and conditions relating to the use and distribution
of this information may apply. For further information, please
contact rns@lseg.com or visit www.rns.com.
RNS may use your IP address to confirm compliance with the terms
and conditions, to analyse how you engage with the information
contained in this communication, and to share such analysis on an
anonymised basis with others as part of our commercial services.
For further information about how RNS and the London Stock Exchange
use the personal data you provide us, please see our Privacy
Policy.
END
MSCUUVVROUUKURR
(END) Dow Jones Newswires
September 22, 2023 02:05 ET (06:05 GMT)
Blencowe Resources (LSE:BRES)
過去 株価チャート
から 5 2024 まで 6 2024
Blencowe Resources (LSE:BRES)
過去 株価チャート
から 6 2023 まで 6 2024